Investor Presentation - Revised
Released
Released
Announcement PDF
5 March 2025
INVESTOR PRESENTATION - REVISED
Hillgrove Resources Limited (ASX: HGO) (Hillgrove or Company) encloses a revised Investor Presentation dated 5
March 2025.
Hillgrove advises that figures and footnotes have been included in slides 18 and 19 referencing the Company’s
announcement ‘Maiden Kanmantoo UG Reserve and 96% Increase in Resource’ dated 18 October 2024.
This announcement is authorised for release to the ASX by the Board of Hillgrove Resources Limited.
For more information contact:
Mr Bob Fulker
CEO & Managing Director
Tel: +61 (0)8 7070 1698
Mr Joe Sutanto
CFO & Company Secretary
Tel: +61 (0)8 7070 1698
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
An Australian Copper
Producer
Investor Presentation
Accelerating Nugent Production
March 2025
Bob Fulker
Managing Director
1
Hillgrove Overview
ASX:HGO | Investor Presentation | March 2025
2
An Australian copper producer
Well positioned to benefit from a robust copper outlook
Tier 1 Jurisdiction
Operating the Kanmantoo Mine and 3.6Mtpa
plant in the mining friendly State of SA, 1 hour
drive from Adelaide
Generating cash flow
Operational stability
ASX:HGO | Investor Presentation | March 2025
2025 Guidance:
• 12,000 – 14,000 tonnes of copper
• All-in Cost1 of US$3.40 – US$3.90/lb
1.4Mtpa Production Mining achieved, driving
toward 25% increase in ore processed
1. All-in Costs includes C1 costs plus sustaining and major capital
3
Corporate snapshot
An Australian copper producer
Market Statistics
Major Shareholders
Share price1
Shares on issue
Market capitalisation
Debt
Cash2
Enterprise value
$0.040
2,095M
$84M
Nil
$3M
$81M
Income tax losses3
Franking credits
$285M
$18M
▪
▪
▪
▪
▪
▪
Freepoint Metals & Concentrates 20.0%
Ariadne Australia
10.3%
Board & Management
Derek Carter
Bob Fulker
Murray Boyte
Roger Higgins
Joe Sutanto
Chairman
CEO & MD
Non-Exec. Director
Non-Exec. Director
CFO & Co. Sec.
Hillgrove owns the Kanmantoo Copper Gold Mine
Robust Resource of 19.3Mt at 0.77% Cu and 0.14g/t Au
Historical production (2010 – 2020): 135kt copper and 55koz gold
Generating cash: ramp up commenced in Jan-24, Commercial
Production declared in Jul-24, $21 million of Operating Cash Flow
generated in 2024
Opportunity to fast-track Nugent development to grow copper
production and reduce unit costs in 2026
Appointment of highly regarded executive, Bob Fulker (ex-Evolution
Mining and OZ Minerals)
Key
Recently relinquished
tenements
Note: Currency is in Australian dollars unless otherwise stated
1. Closing share price on 28 February 2025
2. Cash balance as at 31 December 2024
3. Carried forward as of 31 December 2024 (estimated, prepared but unsubmitted tax return)
ASX:HGO | Investor Presentation | March 2025
4
Kanmantoo
A well-established copper asset
▪
Long legacy of positive stakeholder engagement
▪
Residential workforce
▪
Underground bulk mining (stoping) method
▪
Well capitalised infrastructure
▪ Plant capacity: 3.6Mtpa
▪ Tailings Storage Facility permitted for 6.0Mt
▪ Power and water supply secured
▪ Concentrate trucked 75km to Port Adelaide
▪
Life of mine offtake with Freepoint Commodities
▪
Maiden Copper Ore Reserve
2.8Mt at 0.91% for 26kt Copper1
Copper Mineral Resource
▪ 19.3Mt at 0.77% for 150kt Copper1
Near mine exploration including recent results from
Nugent2:
▪ 18.55m @ 5.69% Cu + 1.02g/t Au
▪ 16.00m @ 2.96% Cu + 0.42g/t Au
▪
▪
▪
ASX:HGO | Investor Presentation | March 2025
1.
2.
Refer to ASX announcement 18 October 2024 titled ‘Maiden Kanmantoo underground Ore
Reserve and 96% increase in copper Mineral Resource endowment’
Refer to ASX announcement 21 January 2025
5
Sustainability
Critical minerals for a sustainable future
▪ Total Recordable Injury Frequency (TRIF)
trending lower from 15.5 to 13.1 in CY2024
▪ Long track record of environmental stewardship
with significant progressive rehabilitation
completed
▪ Award winning stakeholder engagement model
through establishment of the Callington
Community Consultative Committee (K4C)
▪ Supporting the local community with a
predominantly residential workforce
Rehabilitated Tailings Dam at Kanmantoo
ASX:HGO | Investor Presentation | March 2025
6
Underground mining LOM
Increasing optionality to achieve reliable production
Nugent
▪
1.4 Mtpa ore mining rates achieved with
record ore movement in January 2025
▪
Kavanagh and Spitfire are current ore sources
providing positive operating cash flow
▪
Nugent orebody access under development
through both decline and incline
▪
Both development and production rates
increasing as new mining fronts open up
Spitfire
Kavanagh
Current Life of Mine design
ASX:HGO | Investor Presentation | March 2025
7
Mining
Simple mining techniques
▪
Very stable ground and favourable orebody geometry (75o dip)
leading to minimal dilution and recovery loss
▪
Orebody has low grade halo reducing impact of any dilution
▪
Top down uphole longhole open stoping – low technical risk
▪
No backfill of stopes required for geotechnical purposes
▪
All waste able to be backfilled into old stopes
▪
Ground support simple – split sets and mesh for drives, cable
bolts for intersections – no shotcrete
▪
Relatively dry mine – approximately 5l/s inflow, suitable for use
within mine and processing
Competent Ground Conditions
ASX:HGO | Investor Presentation | March 2025
8
Processing
Easily recovered ore, existing infrastructure
▪
Excess capacity in 3.6Mtpa plant – currently only
operating for 50% of time. Additional capacity
available at $9/t variable cost
▪
Coarse grind size – target P80 of 212µm
▪
Significant institutional knowledge in processing
team from Open Pit – Surface Operations Manager
has worked at Kanmantoo since day 1, all
processing leadership worked during Open Pit
Mining
▪
Cheap power supply – average of $0.13/kwh until
June 2027
▪
Permitted TSF capacity for another 6Mt; 1.5m wall
raised regularly constructed from adjacent open pit
waste stockpiles at a cost of at $0.80/t tailings
Processing Plant (Centre), Crusher (Right) and TSF (Background)
ASX:HGO | Investor Presentation | March 2025
9
Continuing the operationally successful production restart
Physical metrics continuing to ramp up
Monthly Ore Mined (kt)
Monthly Development Rates (m)
Commercial Production
Commercial Production
576
540
468
116
104
467
93
413
70
41
Q1-24
Q2-24
Q3-24
Q4-24
Jan-25
Q1-24
Monthly Recoverable Copper Mined1 (t) &
Grade Mined (%)
1.26%
1,400
0.86%
1,200
1,043
1,000
0.93% 1.00%
1,007
834
827
0.93%
Jan-25
1.10%
1.18%
0.86%
0.97%
879
903
Q4-24
Jan-25
0.50%
0.00%
861
-0.50%
800
974
-1.00%
600
400
Q4-24
Commercial Production
1.50%
1.20%
0.83%
Q3-24
Monthly Copper Produced (t) &
Grade Processed (%)
Commercial Production
1,600
Q2-24
-1.50%
314
-2.00%
200
276
-2.50%
0
-3.00%
Q1-24
Q2-24
Q3-24
ASX:HGO | Investor Presentation | March 2025
Q4-24
Jan-25
Q1-24
Q2-24
Q3-24
1. Based on 93.5% Cu Recovery
2024 figures based on average monthly for the quarter
10
Large Mineral Resource endowment
Improving visibility on mine life
Long section of Kavanagh deposit showing 0.2% domain shells
▪
Kanmantoo 2024 Mineral Resources1:
19.3Mt grading 0.77% Cu and 0.14g/t Au
containing 150kt Cu and 82koz of Au
Compared to 2022 MRE2 this represents a:
▪ 96% increase in contained copper
▪ 138% increase in contained gold
▪
Opportunities to grow Resources through:
▪ Extensional drilling at Kavanagh and Nugent
▪ Exploration at Emily Star and North Kavanagh
▪
Kanmantoo 2024 Maiden Ore Reserve1:
2.8Mt grading 0.91% Cu and 0.15g/t Au
containing 26kt Cu and 14koz Au
1.
Refer ASX release on 18 October 2024 entitled “Maiden Kanmantoo underground Ore
Reserve and 96% increase in copper Mineral Resource endowment”
2022 Mineral Resources Estimate 6.9Mt at 1.08% Cu containing 75,900t Cu Refer ASX
release 26 July 2022 Updated Nugent Underground Mineral Resource Estimate
2.
ASX:HGO | Investor Presentation | March 2025
11
Organic growth
Significant near mine Mineral Resource growth opportunities
▪
Investment in resource definition and
extensional drilling delivering strong results
▪
Over 19,000 metres of diamond drilling
planned from Kanmantoo Underground
testing Exploration Targets1
▪
All targets within 500m of Kanmantoo
Processing Plant1
▪
Outstanding results from Nugent drilling
outside of Ore Reserve2:
▪ 18.55m @ 5.69% Cu + 1.02g/t Au
▪ 16.00m @ 2.96% Cu + 0.42g/t Au
1.
Refer to ASX announcement on 13 Feb 2025 titled ‘2025 Kanmantoo
Exploration Target Update’
Refer to ASX announcement on 21 January 2025 titled ‘Quarterly Report
and Appendix 5B for 31 December 2024’
Long Section highlighting resource growth opportunities at depth
2.
ASX:HGO | Investor Presentation | March 2025
12
Organic growth
Significant near mine Mineral Resource growth opportunities
▪
~60,000 metres of drilling planned for 2025
budgeted to focus on1:
▪
Resource to Reserve conversion in
Kavanagh and Nugent
▪
Resource definition in Nugent,
including defining high grade target
currently outside of Reserve
▪
Targets untested at depth including
Valentine, Emily Star and Critchley to
grow Resource and increase LOM
Long section of exploration drilling in 2025
1.
ASX:HGO | Investor Presentation | March 2025
Refer to ASX announcement on 13 Feb 2025 titled ‘2025 Kanmantoo
Exploration Target Update’
13
CY24 Financials
Strong EBITDA delivery
Profit and Loss and Cash Flow
CY24 ($M)
CY23 ($M)
Change ($M)
Revenues
112.4
-
112.4
Operating Cash Flow
21.0
(9.5)
30.5
EBITDA
22.5
(14.1)
36.6
EBIT
(9.4)
(14.8)
5.4
Net Loss After Tax
(24.0)
(16.3)
(7.7)
Profit and Loss and Cash Flow
▪
Operating cash flow of $21.0 million for 2024
▪
Strong EBITDA delivered of $22.5 million for 2024
▪
Net loss after tax impacted by:
▪
▪
Scheduled D&A of $31.7m due to production commencing (2023: $0.7m) ; and
Accounting treatment for the revaluation of the Freepoint royalty increased to $16.2m (2023: $7.5m).
▪
Cash flow generation skewed to the second half with commercial production commencing in July 2024. Operating cash flow for second
half of $12.1m.
▪
Undrawn stand-by facility of $10m with Freepoint expires April 2025. Broader process underway to replace this facility beyond April 2025.
ASX:HGO | Investor Presentation | March 2025
14
Consistent Free Cash Flow Generation
ASX:HGO | Investor Presentation | March 2025
15
Accelerating Nugent Development
Building blocks to consistent positive free cash flows
To Date
Current Focus
2025
Growth
Foundations Built
Cost & Grades
Nugent Development
Beyond Nugent
Maintain the 1.4Mtpa
1.4Mtpa run rate achieved
Continued improvement in
development metres
Improved ore body
understanding
Record copper recoveries
Stabilisation of site costs
1 July 2024 – 31 Dec 2024:
- Average Cu production ~11ktpa
run-rate
- ~US$3.85/lb All-In Cost run-rate
ASX:HGO | Investor Presentation | March 2025
Optimising mined grade to
achieve a consistent mill feed
grade
Balance mine development rates
with stope extraction sequence
to minimise disruption and
interactions
Further reduction in real costs
resulting in further reduction of
mining and processing unit rates
CY25 Guidance:
- 12-14kt Cu
- US$3.40-3.90/lb All-In Cost
Accelerating development of
Nugent to achieve 1.7-1.8Mtpa
run rate in 2026
Early break through the Nugent
Decline
Continue the Resource
extensional drilling for an
updated MROR in Q4 2025
Utilising installed capacity and
equipment reducing unit rates
Nugent development aiming to:
- Step-up Cu production
- Reduce mining + processing
unit costs by ~15-20%
Initial Diamond Drilling focus on
Nugent and Kavanagh Central
resource extensions
Drilling to target depth
extensions of the Valentine,
Emily Star and Critchley
mineralisation
North Kavanagh depth extension
to be further tested
Significant scope to expand mining
inventory to:
- Further utilise 3.6Mtpa plant
capacity; and/or
- Increase mine life
16
Operating Cash Flows
Positive operating cash flows
2024 Operating and Investing Cash Flows (Split By Half)
A$20m
Operating cash flow activities are expected to increase
through CY25 onwards due to:
▪
Increasing Cu production
A$15m
▪
CY25 guidance of 12-14kt (up 33% to 55% on
CY24 production)
▪
CY26+ further increase with Nugent
A$10m
A$5m
Operating Cashflow:
$8.9m
Operating Cashflow:
$12.1m
▪
Reducing mining + processing unit rates (efficiencies as
mine develops & access to Nugent)
▪
Unwind of historic hedges (at A$12,500)
-
(A$5m)
(A$10m)
Investing Cashflow:
($11.9m)
Investing Cashflow:
($18.1m)
Investing cash flow activities are expected to decrease over
time as:
(A$15m)
▪
Funds raised allow access to Nugent, after which major
capex on mine development decreases
▪
Mine benefits from significant non-recurring investments
in electricity, ventilation, haul road, and general
infrastructure already made during ramp-up
(A$20m)
1H 2024
2H 2024
CY24: 9kt Cu production; ~US$4.10/lb All-In Cost
ASX:HGO | Investor Presentation | March 2025
17
Accelerating Nugent Development
Growing to fill the available mill capacity
▪
1.4Mtpa annualised mining rates achieved in January 2025.
Plant has capacity for 3.6Mtpa
▪
1.7 to 1.8Mtpa of available plant capacity with current
resourcing onsite
▪
Existing Nugent Resource is expected to support delivery
of 400ktpa to the plant over at least 4 years
▪
Opportunity to increase development rates using existing
equipment onsite to expedite Nugent capital infrastructure
▪
Nugent Incline and Decline to join by end of 2025 allowing
access to multiple stoping fronts for circa 4 years
▪
Optionality to target high grade stopes if defined by further
diamond drilling in coming months
▪
Increased development enables mining rates to increase to
planned 1.7-1.8Mtpa through 2026, with minimal change to
fixed operating costs
▪
Economies of scale deliver strong cash flow generation
Scheduled Nugent face position as of Dec 31st 20251
1.
ASX:HGO | Investor Presentation | March 2025
1.
Conceptual design based on Mineral Resource Estimate and Ore Reserve
as released in the ASX announcement of 18 October 2024 titled ‘Maiden
See the Mineral Resource and Ore Reserve tables provided as an
Kanmantoo underground Ore Reserve and 96% increase in copper Mineral
Appendix to this presentation for further information on Mineral
Resource
Resources
and Oreendowment’
Reserves
18
Accelerating Nugent Development
Debottlenecking Kavanagh Mine
▪
Increased development resourcing in Kavanagh while
additional crew operating in Nugent
▪
Development sprint will break the cycle of interactions
between production and development which has been
limiting mining rates
▪
De-risks the current mining schedule which is
bottlenecked by available ore sources
▪
Opportunity to introduce ore passes between levels
which will increase both utilisation and productivity of
production fleet
▪
Installation of LOM ventilation systems to reduce reentry delays after stope firings
Scheduled Kavanagh face position as of Dec 31st 20251
1.
ASX:HGO | Investor Presentation | March 2025
1.
Conceptual design based on Mineral Resource Estimate and Ore Reserve
as released in the ASX announcement of 18 October 2024 titled ‘Maiden
See the Mineral Resource and Ore Reserve tables provided as an
Kanmantoo underground Ore Reserve and 96% increase in copper Mineral
Appendix to this presentation for further information on Mineral
Resource
Resources
and Oreendowment’
Reserves
19
Accelerating Nugent Development
Compelling reasons to accelerate development of Nugent
Significant financial benefits in the form of:
▪
▪
Circa 20% lower mining unit costs
▪
Circa 15% lower processing unit costs
▪
Increased efficiency – separate levels for bogging,
development, production drilling, and decline advance
▪
Derisking – greater availability of production drill sites
will allow for an increase in ore sources
▪
Improved production – as development sufficient to
achieve 1.7-1.8Mtpa
▪
Reduced decline congestion – development can
prioritise decline and other capital works
▪
Optionality – if a high grade reserve is defined at the
930-960mRL in Nugent, it can be mined earlier
Plan view of All Nugent Drilling Completed to the end of Dec 20241
1.
ASX:HGO | Investor Presentation | March 2025
Information extracted from ASX announcements on 21 January 2025 titled ‘Quarterly Report and
Appendix 5B for 31 December 2024, 6 May 2022 ‘Nugent Copper Gold Zone Delivers Excellent Drill
Results’ and 3 September 2020 ‘Drilling Expands Cu-au Footprint At Kanmantoo Underground’
20
Equity Raising Summary
ASX:HGO | Investor Presentation | March 2025
21
Equity Raising Summary
$13 million in a Two Tranche Institutional Placement
Offer structure
and size
Offer price
▪ Two-tranche Placement to raise approximately $13 million via the issue of approximately 371.4 million new fully paid
ordinary shares in Hillgrove (“New Shares”) (representing ~17.7% of shares currently on issue) to professional and
sophisticated investors.
▪ Hillgrove expects to undertake a Share Purchase Plan to eligible shareholders in Australia and New Zealand. The
SPP is expected to be capped at $3 million, which means eligible applicants may be subject to scale back.
▪ Offer price of $0.035 per New Share (“Offer Price”), which represents a:
▪ 12.5% discount to the last close price of $0.040 on 28 February 2025;
▪ 15.8% discount to the 5-day volume-weighted average price (“VWAP”) of $0.042;
▪ 17.7% discount to the 10-day VWAP of $0.043
▪ 19.0% discount to the 20-day VWAP of $0.043
▪ Two-tranche Placement to raise approximately $13 million via the issue of approximately 371.4 million New Shares
(representing ~17.7% of shares currently on issue) to professional and sophisticated investors, comprising:
Placement
▪ A “Tranche 1 Placement” to raise approximately $10.4 million via the issue of approximately 297.3 million New
Shares within Hillgrove’s existing placement capacity under Listing Rule 7.1; and
▪ A “Conditional Placement” (“Placement”) of $2.6 million via the issue of approximately 74.1 million New
Shares, subject to FIRB approval and shareholder approval at the AGM to be held in in early May 2025.
Lead Manager
▪ Canaccord Genuity and Blue Ocean Equities have been appointed as Joint Lead Managers to the Offer
ASX:HGO | Investor Presentation | March 2025
22
Sources and Uses of Funds
Proceeds will be used to expand underground development and to grow mine life
Accelerate Nugent Development
▪
Additional development meters underground
to open up new mining areas
▪
Bring forward ore from Nugent to earlier than
previously planned
Sources & uses of funds
Sources of funds
$m
Placement
13.0
SPP
0.0 - 3.0
Total Sources
13.0 – 16.0
Uses of funds
$m
Mine Access Acceleration of Nugent Deposit
8.0
General Working Capital and Raising Costs
5.0 – 8.0
Total Uses
13.0 – 16.0
Future
▪
▪
Multiple on-lease targets to further increase
the Resource size and confidence
Infill drilling to convert a portion of the 19.3Mt
Resource into Reserves
ASX:HGO | Investor Presentation | March 2025
23
Equity Raising Timetable
Summary of Key Dates
Time / Date (2025)
Trading Halt
Monday, 3 March
Placement bookbuild conducted
Monday, 3 March
Record date for SPP
Trading halt lifted, announce completion of Placement
SPP Offer opens and booklet made available
Settlement of New Shares under Tranche 1 of the Placement
Allotment and trading of New Shares under Tranche 1 of the Placement
SPP Offer closes
SPP completion announcement and allotment of New Shares under the SPP
Quotation of New Shares under the SPP
7:00pm (AEDT), Tuesday, 4 March
Wednesday, 5 March
Monday, 10 March
Wednesday, 12 March
Thursday, 13 March
Friday, 28 March
Friday, 4 April
Monday, 7 April
AGM to approve issue of New Shares under Conditional Placement
Early May
Settlement of New Shares under Conditional Placement
Early May
Allotment and trading of New Shares under Conditional Placement
Early May
The timetable is indicative only and may change. Hillgrove and the Lead Managers reserve the right to amend any or all these dates and times without notice, subject to the Corporations Act, the ASX Listing Rules and other applicable laws.
ASX:HGO | Investor Presentation | March 2025
24
Disclaimer and Risks
ASX:HGO | Investor Presentation | March 2025
25
Important Notice and Disclaimer
Summary information
This presentation contains summary information about Hillgrove Resources Limited (Hillgrove or the Company) and its activities as at 3 March 2025. The information in this presentation is of a
general nature and does not purport to be complete nor does it contain all information which a prospective investor may require in evaluating a possible investment in the Company or that would be
required in a prospectus or product disclosure statement prepared in accordance with the requirements of the Corporations Act. The historical information in this presentation is, or is based on,
information that has been released to the ASX. This Presentation should be read in conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the ASX,
which are available at www.asx.com.au
Any market and industry data that may be used in connection with this presentation may have been obtained from research, surveys or studies conducted by third parties, including industry or
general publications. None of the Company, its representatives or advisers have independently verified that market or industry data provided by third parties or industry or general publications.
Statements made in this presentation are made only as at the date of this presentation. The information in this presentation remains subject to change without notice. The Company reserves the
right to withdraw the offer or vary the timetable for the offer without notice.
Not an offer
This presentation is not an offer or invitation to acquire new shares in the Company or any other financial products and is not a prospectus, product disclosure statement or other offering document
under Australian law (and will not be lodged with ASIC) or any other law. This presentation is for information purposes only and is not an invitation or offer of securities for subscription, purchase or
sale in any jurisdiction. The distribution of this presentation in jurisdictions outside Australia may be restricted by law and you should observe any restrictions.
Not financial product advice
This presentation does not constitute financial product or investment advice or any recommendation to acquire new shares or accounting, legal or tax advice. It has been prepared without taking
into account the objectives, financial or tax situation or needs of individuals. An investment in Hillgrove’s securities is subject to investment and other known and unknown risks, some of which are
beyond the control of Hillgrove. Before making an investment decision, prospective investors should consider the appropriateness of the information having regard to their own objectives, financial
and tax situation and needs and obtain legal and taxation advice appropriate to their jurisdiction. Hillgrove is not licensed to provide financial product advice. Cooling off rights do not apply to the
acquisition of new shares under the Offer.
Future performance
This presentation includes both information that is historical in character and information that consists of forward-looking statements. Forward-looking statements are not based on historical facts,
but are based on current expectations of future results or events. This presentation contains or may contain certain “forward-looking statements” and comments about future events, that are based
on Hillgrove management's beliefs, assumptions and expectations and on information currently available to management as at the date of this presentation. Often, but not always, forward-looking
statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar
expressions, and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production potential, estimates of future Mineral
Resources and Ore Reserves.
ASX:HGO | Investor Presentation | March 2025
26
Important Notice and Disclaimer
Future performance (continued)
Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values, results or performance achievements to differ materially from
those expressed or implied in this presentation.
The forward looking statements are subject to risks, stakeholder engagement, uncertainties and assumptions which could cause actual results, timing, or events to differ materially from the
expectations described in such forward-looking statements. Those risks and uncertainties include factors and risks specific to the industry in which Hillgrove operates, any applicable legal
requirements, as well as matters such as general economic conditions. These factors include, but are not limited to the potential that any of Hillgrove's projects may experience technical,
geological, metallurgical and mechanical problems, changes in market prices and other risks not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing
assumptions, major changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously underestimated technical challenges, increased costs, and demand
for production inputs. Further information regarding the key risks associated with investment are located on slides 29 to 31 of this presentation and you should be consider these risks carefully.
Where Hillgrove expresses or implies an expectation or belief as to future events or results, such expectation is expressed in good faith and on a reasonable basis. No representation or warranty,
express or implied, is made by Hillgrove that the matters stated in this presentation will be achieved or prove to be correct. Except as required by law, Hillgrove undertakes no obligation to provide
any additional or updated information or update any forward-looking statements, whether as a result of new information, future events, results or otherwise. Any forward looking statement contained
in this document is qualified by this cautionary statement.
Mineral Resources and Ore Reserves Estimates
The Economic Assessment discussed in this Presentation, has been undertaken to explore the technical and economic feasibility of developing an underground mine to economically and
sustainably exploit the Kanmantoo Copper Gold Deposit, located in South Australia. The Kanmantoo Copper Gold Project (Kanmantoo or Project) is 100% owned by Hillgrove Resources Limited.
Competent Person’s Statement
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Hillgrove is subject to Australian disclosure requirements and standards, including the requirements of
the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012
edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate and the 2024 Ore Reserve is extracted from ASX release titled ‘Maiden Kanmantoo Underground Ore
Reserve and 96% Increase in Copper Mineral Resource Endowment’ dated 18 October 2024 and is available to view at www.hillgroveresources.com.au. The Company confirms that it is not aware
of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the
Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Person's findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to the 2022 Mineral Resource Estimate for Nugent and Kavanagh was extracted from the ASX release titled Updated Nugent Underground Mineral
Resource Estimate on the 26 July 2022 and is available to view at www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcement and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been
materially modified from the original market announcements.
ASX:HGO | Investor Presentation | March 2025
27
Important Notice and Disclaimer
Competent person’s statement (continued)
The information in this report that relates to planned drilling opportunities was extracted from the ASX release titled ‘2025 Kanmantoo Exploration Target Update’ previously released on the 13 Feb
2025 and is available to view at www.hillgroveresources.com.au. The company confirms that it is not aware of any new information or data that materially affects the information included in the original
market announcement and that all material assumptions and technical parameters underpinning the information in the relevant market announcement continue to
Share your feedback