INVESTOR PRESENTATION
Hillgrove Resources Ltd (“the Company” or “Hillgrove”) (ASX:HGO) encloses a copy of the Company’s updated Investor
Presentation.
Authorised for release by Bob Fulker, Chief Executive Officer & Managing Director
Engage with this announcement at the Hillgrove Resources Investor Hub.
For more information contact:
Mr Bob Fulker Mr Luke Anderson
Chief Executive Officer & Managing Director Chief Financial Officer & Joint Company Secretary
Tel: +61 (0)8 7070 1698 Tel: +61 (0)8 7070 1698
An Australian
Copper Producer
Investor Presentation
27 January 2026
Bob Fulker
Managing Director & Chief Executive Officer
2
Disclaimer
To the maximum extent permitted by law, neither Hillgrove nor its related corporations, directors, officers, employees or agents, nor any other person, accepts any liability, including, without limitation,
any liability arising from fault or negligence, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Hillgrove is under no obligation to release any updates or revisions to this presentation
to reflect any change in expectation or assumptions and disclaim all responsibility and liability for these forward-looking statements (including, without limitation, liability for fraud or negligence).
Nothing contained in this Document constitutes investment, legal, tax or other advice. The information in this Document does not take into account the investment objectives, financial situation or particular needs of any recipient. Before
making an investment decision, each recipient of this Document should make its own assessment and take independent professional advice in relation to this Document and any action taken on the basis of this Document. All currency
referred to is Australian dollars ($) unless otherwise indicated (e.g. US$).
Forward Looking Statement
This presentation contains or may contain certain forward-looking statements and comments about future events, that are based on Hillgrove's beliefs, assumptions and expectations and on information currently available to management
as at the date of this presentation. Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and
"guidance", or similar expressions, and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production potential, financial forecasts, product quality estimates of
future Mineral Resources and Ore Reserves. Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values, results or performance achievements to differ materially from
those expressed or implied in this announcement. Where Hillgrove expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a reasonable basis. No representation
or warranty, express or implied, is made by Hillgrove that the matters stated in this presentation will in fact be achieved or prove to be correct. Except as required by law, Hillgrove undertakes no obligation to provide any additional or updated
information or update any forward-looking statements whether on a result of new information, future events, results or otherwise. Readers are cautioned against placing undue reliance on forward-looking statements. These forward-looking
statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of Hillgrove, the directors, and management of
Hillgrove. These factors include, but are not limited to difficulties in forecasting expected production quantities, the potential that any of Hillgrove's projects may experience technical, geological, metallurgical and mechanical problems,
changes in market prices and other risks not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans and/or resources, changes in equipment life or capability,
emergence of previously underestimated technical challenges, increased costs, and demand for production inputs.
Competent Persons Statement
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Hillgrove is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors
should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (the JORC Code).
The information in this report that relates to the 2025 Kanmantoo Mineral Resource Estimate and the 2025 Ore Reserve is extracted from ASX release titled ‘Hillgrove Resources Delivers Ore Reserve Extension at 1.0%CuEq’ dated 30 October 2025
and is available to view at www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate is extracted from ASX release titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment” dated
18 October 2024 and is available to view at www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and
that all material assumptions and technical parameters underpinning the Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed. The Company confirms that
the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to planned drilling opportunities was extracted from the ASX release titled ‘2026 Kanmantoo Exploration Update’ previously released on the 11 Dec 2025 and is available to view at
www.hillgroveresources.com.au. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and
technical parameters underpinning the information in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
The information in this report that relates to previously reported exploration drilling results were extracted from the ASX releases titled “Outstanding Emily Star Drill Results released on 18 September 2025 and ‘Emily Star Drill Results Continue To
Realise High Copper Grades’ released on 08 Jan 2026 titled these are available to view at www.hillgroveresources.com.au. The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The
company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Important Notice and Disclaimer
Corporate Snapshot
Share price1 $0.052
Shares on issue1 3,414 M
Market capitalisation $178 M
Debt Nil
Cash2 $21 M
Enterprise value $157 M
Market Statistics
Derek Carter Chairman
Bob Fulker CEO & MD
Murray Boyte Non-Exec. Director
Roger Higgins Non-Exec. Director
Luke Anderson CFO & Co. Sec.
Board & Management
Major Shareholders
Note: Currency is in Australian dollars unless otherwise stated
1. Closing share price on 23 January 2026
2. Cash balance as at 31 December 2025
3. Refer to Results for Full Year Ended 31 December 2024 released on 28 February 2025.
▪ Fully permitted and operating Kanmantoo underground Copper-Gold mine
(100%) in South Australia
▪ 95% of employees live locally within the Adelaide Hills regional area
▪ Established Grid Power, Water, Road & Rail infrastructure in close proximity
▪ South Australian Power Grid is +70% renewable
▪ CY2025 $35.8 million Operating Mine Cashflow
▪ 3.6Mtpa processing plant with spare operating capacity
▪ Brownfield exploration upside with all mineralisation open at depth
Freepoint Metals & Concentrates 14.4%
Ariadne Australia 7.1%
Income Tax Losses3 $283 M
Franking Credits3 $18 M
Flagship Kanmantoo mine is scalable and community backed
3
NEAR TERM DEVELOPMENT
CY 2026 Guidance1
▪ 12,750 – 14,000 tonnes Cu produced
▪ AISC A$5.75–6.25/lb Cu sold
▪ A$8 – 10 million major capital
▪ Mining Rate 1.7-1.8Mtpa by Jun 2026
▪ Emily Star & North Kavanagh
exploration inclines development
▪ Emily Star Stage 2 Development
decision in H2 2026
GROWTH
Material Scale Up Opportunities
▪ Utilise 3.6Mtpa plant capacity
▪ Increase mine life
▪ Inorganic regional opportunities
▪ Nugent and Kavanagh extensions
▪ Accelerate Emily Star Development
▪ Exploration - Saddle Zone, Paringa,
Valentine and Critchley
CURRENT STATUS
CY 2025 Performance1
▪ 11,315 tonnes Cu produced
▪ AISC A$6.19/lb payable Cu sold
▪ Nugent Project complete on time
▪ Currently operating at a 1.5Mtpa rate
▪ Exploration Success at Emily Star
▪ Second annual Mineral Resources
and Reserves delivered Oct 2025
Delivering and Growing the Business
Building blocks to consistent positive cash flow
4
1. Refer to ASX release on 22 January 2026 titled “Quarterly Report for 31 December 2025, Hillgrove Delivers on 2025 Guidance and Sets Path for 2026”.
Kanmantoo Mine (100%)
▪ Copper Gold Resource and Reserve
o Mineral Resource (2025) – 22Mt containing 160kt Cu & 120koz Au1
o Ore Reserve (2025) – 4.0Mt containing 34kt Cu & 29koz Au1
o Only 29,377m of the 2025 drilling incorporated in the 2025 MROR, remainder to
be captured in the 2026 update2 (Dec Qtr 2026)
▪ Latent capacity enables material production and cost reduction upside
o Fully permitted – 3.6Mtpa processing plant and 6Mt Tailing Storage Facility
o Operating @ 1.5Mtpa run rate3
o Targeting 1.7-1.8Mtpa by end of H1 2026
o Costs forecast to ease in H2 2026 as higher mining rates reduce unit costs
o Cheap power and reliable water supply
▪ Low risk mining conditions
o Nugent orebody access advancing via dual decline development
o Stable geotechnical conditions ± 75° orebody dip minimise dilution and
maximise recovery
o Low-grade halo further mitigates dilution impact
o Conventional crush-grind-flotation plant achieving 94-95% recovery at a
course 210µm grind
1. Refer to ASX release on 30 October 2025 titled “Hillgrove Resources Delivers Ore Reserve Extension at 1.0%CuEq”.
2. Refer to ASX release on 11 December 2025 titled “Kanmantoo 2026 Exploration Update”.
3. Refer to ASX release on 22 January 2026 titled “Quarterly Report for 31 December 2025, Hillgrove Delivers on 2025 Guidance and Sets Path for 2026”.
Operating underground mine 60km from Adelaide, South Australia
5
2026 Development & Stope Plan
6
Ramping up Nugent production and unlocking Emily Star and North Kavanagh access
2026 Planned development and stoping areas1 based on the 2025 Kanmantoo Mineral Resource Estimate2
1. Refer to ASX release on 22 January 2026 titled “Quarterly Report for 31 December 2025, Hillgrove Delivers on 2025 Guidance and Sets Path for 2026”.
2. Refer to ASX release on 30 October 2025 titled “Hillgrove Delivers Ore Reserve Extension at 1.0% CuEq”.
Nugent
Kavanagh
Significant near mine growth opportunities
Growth opportunities underpinned by 2026 Drilling Program
1. Refer to ASX release on 22 January 2026 titled “Quarterly Report for 31 December 2025,
Hillgrove Delivers on 2025 Guidance and Sets Path for 2026”.
2. Refer ASX release on 11 December 2025 titled “Kanmantoo 2026 Exploration Update”.
7
▪ 2026 Underground Drilling Program
o 58,000m underground drilling planned1
▪ 12,000m dedicated to Emily Star via Emily Star
Exploration Incline1
o Drilling will continue at Valentines and Saddle Zone,
alongside resource expansion and grade control
programs at Kavanagh, Nugent and Emily Star2 7
Planned Underground Exploration Drill Targets 20262 Planned Surface Drill Targets into Kavanagh 20262
▪ 2026 Surface Exploration Drilling Program
o 5,000m surface drilling planned1
o Surface diamond rig mobilized for directional drilling
targeting the 5th “Swell Zone” in Kavanagh2
Outstanding Results at Emily Star
▪ Drilling continued to intersect high
grade Cu-Au mineralisation:
o 19.1m @ 1.91% Cu + 0.15g/t Au from
500m (25KVUG0699)1
o 7.25m @ 1.6% Cu + 0.07g/t Au from
504.75m (25KVUG0723)2
o 6.31m @ 1.34% Cu + 0.08g/t Au
from 498m (25KVUG0722)2
▪ 270 metre Exploration Drive from
Nugent decline in budget for 2026:
o Enable systematic drilling of Emily
Star
o Provide drill access to Critchley
and Paringa targets
1. Refer ASX release on 18 September 2025 titled “Outstanding Emily Star Drill Results”.
2. Refer ASX release on 08January 2026 titled “Emily Star Drill Results Continue To Realise High Copper Grades”.
3. Refer ASX release on 18 October 2024 titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment”.
Mineralisation at Emily Star to complement Nugent and Kavanagh production
8
Key Emily Star Drill results compared to the 2024 Emily Star Mineral Resource Update3 and designed
Emily Star Exploration incline. Image generated from previously released information 1 + 2
Emily Star Development
Multi-staged approach to best
manage development capital
▪ Stage 1: Establish drill platforms
from the Emily Star Exploration
Incline for resource definition
drilling
o In plan for 2026
▪ Stage 2: Develop Emily Star decline
and ventilation infrastructure
o Progress to Stage 2 is
dependent on drill results
and economic assessment
o Decision expected in H2 2026
▪ Stage 3: Establish first level for
production, including the
development of ore drives, set up
of egress and grade control drilling
Third mining front to provide milling optionality
9
Planned Emily Star Development and Drilling Target Areas based on the 2024 Emily Star Mineral Resource
Update1
1. Refer ASX release on 18 October 2024 titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment”.
The Hillgrove Value Proposition
Well funded to deliver near mine targets to drive production growth and lower unit
operating costs
10
Cu Strategy in Tier 1 Jurisdiction
Robust Resources & Reserves
Cash Generating Operation
Latent Installed Capacity for Growth
Near Mine Exploration Upside Potential
Thank you
11
Appendix - Kanmantoo Mineral Resource
Notes:
1. Due to effects of rounding, total numbers may not sum.
2. Inferred 1 – includes Kavanagh high grade Inferred; Central
Kavanagh, North Kavanagh and Valentines Categorical
Indicator Kriging (CIK) Inferred.
3. Inferred 2 – includes North Kavanagh high grade Inferred only
4. Inferred 3 – includes Nugent high grade and CIK Inferred
5. Inferred 4 – includes Valentines high grade Inferred only
6. Reporting criteria are: Measured, Indicated and Inferred
material (RESCAT = 1 or RESCAT = 2 or RESCAT = 3), Cu >=
0.40% (CU_PCT >= 0.4), in-situ (VOIZONE = 0) with reasonable
prospects of eventual economic extraction envelope
(MREZONE = 1), Reasonable Prospects for Eventual Economic
Extraction (RPEEE=1).
7. Tonnage and metal are rounded to the nearest 1,000 tonnes,
grades are rounded to two significant figures.
8. Mineral Resource is reported at a 0.40% Cu cut-off grade for
all mine areas.
9. Mineral Resource is depleted for mining to 30 June 2025.
10. Mine depletion refers to the current Kanmantoo
underground operation, and historical Giant, Nugent and
Emily Star open pits.
The information is extracted from the report entitled ‘Hillgrove
Delivers Ore Reserve Extension at 1.0% CuEq’. released on 30
October 2025 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The
Company confirms that it is not aware of any new information or
data that materially affects the information included in the original
market announcement and that all material assumptions and
technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
12
12
Mine Area
JORC
Classification
Tonnage Cu Au Ag Cu Metal Au Metal
(kt) (%) (g/t) (g/t) (kt) (koz)
Kavanagh
(including
Spitfire)
Measured 4,200 0.80 0.11 2.7 33 15
Indicated 2,700 0.72 0.13 2.5 19 11
Inferred 1 5,800 0.65 0.14 2.5 38 26
Sub-Total 12,700 0.72 0.13 2.6 91 53
North
Kavanagh
Measured - - - - - -
Indicated 180 0.78 0.12 3.4 1.4 0.7
Inferred 2 200 0.74 0.29 2.8 1.5 1.9
Sub-Total 380 0.76 0.21 3.0 2.9 2.6
Nugent
Measured 550 0.83 0.38 2.3 4.6 6.7
Indicated 2,300 0.75 0.37 2.0 17 28
Inferred 3 2,800 0.78 0.26 1.9 22 24
Sub-Total 5,700 0.77 0.32 2.0 44 59
Valentines
Measured - - - - - -
Indicated 200 0.65 0.07 1.3 1.3 0.5
Inferred 4 340 0.55 0.05 1.2 1.9 0.5
Sub-Total 540 0.59 0.06 1.2 3.2 1.0
Emily Star
No change to
2024
Measured - - - - - -
Indicated - - - - - -
Inferred 2,600 0.77 0.08 1.6 20 7
Sub-Total 2,600 0.77 0.08 1.6 20 7
TOTAL 22,000 0.74 0.17 2.3 160 120
Appendix - Kanmantoo Mineral Resource
13
13
Mine Area Classification
Tonnes
(kt)
Cu
(%)
Au
(ppm)
CuEq
(%)
Ag
(ppm)
Cu Metal
(kt)
Au Metal
(koz)
Kavanagh
Proved 1,500 0.96 0.11 1.0 2.8 14 5
Probable 900 0.89 0.19 1.0 2.9 8 5
Sub-Total 2,300 0.93 0.14 1.0 2.8 22 10
Nugent
Proved 360 0.73 0.37 1.0 1.9 3 4
Probable 1,300 0.73 0.34 0.9 1.9 9 14
Sub-Total 1,600 0.73 0.35 0.9 1.9 12 19
Total Ore
Reserves
Proved 1,800 0.92 0.16 1.0 2.6 17 9
Probable 2,200 0.79 0.28 1.0 2.3 17 19
Total 4,000 0.85 0.22 1.0 2.4 34 29
Notes:
1. Dry metric tonnes.
2. Stope cut-off grade 0.8% CuEq (Copper Equivalent) to define development limits, 0.6% CuEq for stopes along
defined development. Development cut-off grade 0.4% Copper.
3. Approximately 40,000 tonnes of Measured Mineral Resource has been converted to Probable Ore Reserves.
The tonnes are in Nugent Mine Area and are contained in a region with high water inflows from intercepting
diamond drill holes. Further work is required to determine a strategy to profitably mine these tonnes.
4. Reported Ore Reserves do not include any diluting Inferred or Unclassified material. The mine schedule
includes 277kt at 0.2% Cu of non-Reserving material that is mined as unavoidable dilution.
5. Reported grades are rounded to two decimal places, copper equivalent to one decimal place. Tonnes are
rounded to two significant figures. Minimum stoping widths of 5m true width.
6. Reported grades are rounded to two decimal places. Tonnes are rounded to two significant figures.
7. Any minor apparent discrepancies for sums in the table are due to rounding.
8. The period of economic extraction is from July 2025 to April 2028.
9. Ore Reserves are converted from Mineral Resources based on October 2025 Mineral Resources, reported
herewith.
10. Competent Person: Mark Hamilton MAusIMM (#221080).
11. Over 18 months of mining actual demonstrates very good ground conditions. It is expected that this will
continue, with Geotech modelling demonstrating stability over modelled life of mine.
CuEq calculation takes into account all material cost drivers that differentiate value derived from copper and gold,
expressed as copper grade in-situ. Drivers applied are concentrator recoveries, metal payability and metal prices.
Silver (Ag) is not included in CuEq calculation due to immaterial value contribution. The following formula is used
to calculate CuEq: CuEq = Cu% + (Au g/t / 31.1034 x Au Rec x Au Pay x Au Price) / Cu Pay / Cu Price / Cu Rec.
Driving values used for 2025 ORE: Metal prices: Cu Price = US$3.85/lb, Au Price = US$3,000/Oz. Metallurgical
recoveries: Cu Rec = 94.5%, Au Rec = 55% Payability: Cu Pay = 95%, Au Pay = 90%. It is Hillgrove’s view that all
metals within this formula will be recovered and sold. Metallurgical recoveries are based on current plant
performance. Metal payability is based on current concentrate quality and contracted marketing terms.
The information is extracted from the report entitled “Hillgrove Delivers Ore Reserve Extension at 1.0% CuEq”.
released on 30 October 2025 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement and that
all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.