Outstanding Emily Star Drill Results
Released
Released
Announcement PDF
18 September 2025
OUTSTANDING EMILY STAR DRILL RESULTS
High grade Copper-Gold mineralisation has been identified in the first underground exploration drill hole to Emily
Star, including:
•
6.3m @ 1.76% Cu + 0.12g/t Au from 425.15m downhole
•
19.1m @ 1.91% Cu + 0.15g/t Au from 500m downhole
•
5.7m @ 2.12% Cu + 0.36g/t Au from 531m downhole
Other intersections of interest were:
•
Critchley: 3.0m @ 0.70% Cu + 0.11g/t Au from 251m downhole
•
Paringa: 2.7m @ 0.40% Cu + 0.01g/t Au from 124.3m downhole
Hillgrove Resources Limited (Hillgrove) (ASX:HGO) is pleased to provide the following drilling update from the
Kanmantoo Copper Mine. The Emily Star drilling program from the 1010 Diamond Drill Site is underway with the
drilling results from the first completed drill hole returned. These results have identified the mineralisation corridor
between Emily Star and Nugent and provided better information on the width and grade of Emily Star due to the
improved drill angle from the underground drill site.
Figure 1: Plan View of 25KVUG0699 showing the high grades intersected downhole against the 2024 Emily Star MRE sliced at
the 1005 metre RL
1 of 13
Commenting on the drilling results, Hillgrove CEO and Managing Director, Bob Fulker said:
“The Emily Star diamond drill program has been a high priority focus of the team, with the
acceleration of Nugent, and development of the 1010 Nugent Diamond Drill platform, allowing us to
commence drilling for Emily Star. Emily Star is a stacked mineralisation lode that has the potential to
deliver multiple additional mining fronts at Kanmantoo. Along with Nugent, it has the potential to
deliver a material increase in mining rates.
The results from the first hole are excellent, with the average intercept grades over double the
average Mineral Resource Estimate for Emily Star1. The three known Emily Star lenses are clearly
observed and, due to the drill angle, the significant lode widths and geometries are becoming clearer.
Emily Star represents the next organic opportunity in our pipeline after Nugent that, if developed, will
allow us to further utilise our existing plant capacity and drive down unit costs.
Having successfully executed the acceleration of Nugent, these results at Emily Star give us
confidence that we will continue to expand our production at Kanmantoo.”
Figure 2: View towards the North showing the high Copper grades intersected in 25KVUG0699 against the 2024 Emily Star
MRE displaying Copper Grades
1
Refer to ASX release on 18 October 2024 titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral
Resource Endowment’
2 of 13
Emily Star drilling has commenced from the 1010 Nugent Diamond Drill Site testing the Emily Star mineralisation
as well as the area between Emily Star and Nugent, which has historically had no significant drilling at depth.
Drill hole 25KVUG0699 identified five significant intersections. Three of these intersections align with Emily Star
Mineralisation, with one aligning with Critchley Mineralisation and one with Paringa Mineralisation. Drill hole
25KVUG0699 was drilled at a sub horizontal dip, which has allowed for better geological information of lode location
and geometry than what was possible with previous surface drill holes.
Intersections in the Emily Star mineralisation included 6.3 metres at 1.76% Cu and 0.12g/t Au from 425 metres
downhole, 19.1 metres at 1.91% Cu and 0.15g/t Au from 500 metres downhole and 5.7 metres at 2.12% Cu and
0.36g/t Au from 531 metres downhole. These results have provided spatial information to further refine follow up
drilling targets at Emily Star.
The intercept of 2.7 metres @ 0.40% Cu and 0.01g/t Au from 124.3 metres downhole with associated alteration is
observed along strike of the Paringa zone and is interpreted as a northerly extension of this zone. The intercept of
3.0 metres @ 0.70% Cu and 0.11g/t Au from 251 metres downhole and associated alteration aligns with the
projected Critchley zone seen at surface.
Drilling targeting the extent of the Emily Star zone is ongoing with observations being used to plan future drill holes.
Following the completion of the drilling program this information will be used to design a drill platform to specifically
target Emily Star from the Nugent Decline.
Figure 1 above details the location of significant intersections relating to the 2024 Emily Star Mineral Resource
Estimate2 and the previously mined open pits. The full list of significant intersections is included in Table 1 below.
Figure 2 above details a section view of drilling results viewed toward the North, showing the Copper results against
the 2024 Emily Star Mineral Resource Estimate2 Copper values.
Authorised for release by the Board of Hillgrove Resources Limited.
For more information contact:
Mr Bob Fulker
CEO & Managing Director
Tel: +61 (0)8 7070 1698
Mr Luke Anderson
Chief Financial Officer
Tel: +61 (0)8 7070 1698
2
Refer to ASX release on 18 October 2024 titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral
Resource Endowment’
3 of 13
Competent Person's Statement
The information in this release that relates to the Exploration Results is based upon information compiled by Caitlin
Rowett, who is a Member of The Australasian Institute of Mining and Metallurgy. Caitlin Rowett is a full-time
employee and holds equity in Hillgrove Resources Limited and has sufficient experience relevant to the styles of
mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC
Code)’. Caitlin Rowett has consented to the inclusion in the release of the matters based on their information in the
form and context in which it appears.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate is extracted from ASX
release titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral Resource
Endowment’ dated 18 October 2024 and is available to view at www.hillgroveresources.com.au. The Company
confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical parameters underpinning the Mineral
Resource Estimate in the relevant market announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person's findings are presented have not been
materially modified from the original market announcements.
Forward Looking Statement
This Report contains or may contain certain forward-looking statements and comments about future events, that are
based on Hillgrove's beliefs, assumptions and expectations and on information currently available to management
as at the date of this presentation. Often, but not always, forward-looking statements can generally be identified by
the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook",
and "guidance", or similar expressions, and may include, without limitation, statements regarding plans, strategies
and objectives of management, anticipated production and production potential, financial forecasts, product quality
estimates of future Mineral Resources and Ore Reserves. Such statements are only expectations or beliefs and are
subject to inherent risks and uncertainties which could cause actual values, results or performance achievements
to differ materially from those expressed or implied in this announcement. Where Hillgrove expresses or implies an
expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a
reasonable basis. No representation or warranty, express or implied, is made by Hillgrove that the matters stated in
this presentation will in fact be achieved or prove to be correct. Except as required by law, Hillgrove undertakes no
obligation to provide any additional or updated information or update any forward-looking statements whether on a
result of new information, future events, results or otherwise. Readers are cautioned against placing undue reliance
on forward-looking statements. These forward-looking statements are not guarantees of future performance and
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of Hillgrove, the directors, and management of Hillgrove. These factors include, but are not
limited to difficulties in forecasting expected production quantities, the potential that any of Hillgrove's projects may
experience technical, geological, metallurgical and mechanical problems, changes in market prices and other risks
not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing assumptions, major
changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously
underestimated technical challenges, increased costs, and demand for production inputs.
4 of 13
APPENDIX A
The objective of the ongoing underground diamond drilling program has been to expand the mineral system within
the Kanmantoo Mine Lease. Appendix B JORC Table 1, sections 1 and 2 describe the drilling, sampling, and
assaying processes.
Table 1
List of drill intercepts in this release
Intercepts tabulated in the table are amalgamated over a minimum down hole length of 2.5m > 0.3% Cu with a maximum of 2m
internal dilution < 0.3% Cu. Or a minimum down hole length of 2.5m > 0.3g/t Au with a maximum of 1m internal dilution < 0.3g/t
Au. No assays were cut before amalgamating the intercept
Target Zone
Assay Method
Depth From
Depth To
Interval
Length
(m)
Cu %
Au g/t
Ag g/t
25KVUG0699
Paringa
4 Acid/ICP-MS
124.3
127
2.7
0.4
0.01
0.38
25KVUG0699
Critchley
4 Acid/ICP-MS
251
254
3
0.7
0.11
1.01
25KVUG0699
Emily Star
4 Acid/ICP-MS
425.15
431.45
6.3
1.76
0.12
5.52
25KVUG0699
Emily Star
4 Acid/ICP-MS
500
519.05
19.1
1.91
0.15
3.9
25KVUG0699
Emily Star
4 Acid/ICP-MS
531
536.7
5.7
2.12
0.36
4.83
Table 2
Drill Hole Collars
Hole ID
Hole id
25KVUG0699
Site
type
DDH
Survey
Nat grid id
Easting
Northing
Method
591.6
Pivot Point MGA94_54 318222.969 6114520.607
Final collar survey to be adjusted when rig is moved from pivot point
Max. Depth
Height
1018.986
5 of 13
Table 3
Drill Hole Downhole Survey
SITE_ID
DEPTH
AZIMUTH
DIP
25KVUG0699
0
265
4.53
25KVUG0699
15
265.01
3.82
25KVUG0699
30
265.24
3.38
25KVUG0699
60
266.38
1.95
25KVUG0699
90
268.23
1.07
25KVUG0699
120
267.69
0.16
25KVUG0699
150
268.18
-0.34
25KVUG0699
180
268.66
-1.06
25KVUG0699
210
269.39
-2.58
25KVUG0699
240
270.93
-2.88
25KVUG0699
270
271.76
-3.98
25KVUG0699
300
272.38
-4.63
25KVUG0699
330
273.07
-5.26
25KVUG0699
360
275.07
-5.62
25KVUG0699
390
274.23
-6.83
25KVUG0699
420
275.11
-8
25KVUG0699
450
276.01
-8.75
25KVUG0699
480
275.2
-10
25KVUG0699
510
275.24
-10.98
25KVUG0699
540
276.78
-11.82
25KVUG0699
570
277.32
-12.52
25KVUG0699
590
277.51
-12.62
6 of 13
APPENDIX B – JORC Table 1
Section 1
Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
•
•
•
The Diamond Drill Hole (DDH) sampling was conducted as per the Hillgrove procedures and QAQC protocols.
Sample intervals from 1.2m to 0.30m as determined by geology through visibly mineralised zones were split from the drill core, with the drill core sawn in
half with a diamond core saw.
Samples were prepared by ALS Adelaide with each sample being wholly pulverised to >85% passing <75µm.
Drilling
techniques
•
All UG drilling is undertaken by external drilling contractor, DRC Drilling. All holes drilled with NQ. NQ Core size is 47.6mm in diameter.
Drill sample
recovery
•
Recovered drill core metres were measured and compared to length of drill hole advance to calculate core recovery for every core run. On average sample
recovery is >98%. There is no correlation between sample recovery and copper grades in this DDH drill program.
When intersecting the fractured rock aquifers sample recovery has been observed to decrease for a discrete zone before returning to standard conditions
•
Logging
•
•
•
•
Sub-sampling
techniques and
•
All drill core was logged for lithology, alteration, structure, weathering and mineralisation by Hillgrove geologists in accordance with Hillgrove’s Core
Logging Procedure. Colour and any additional qualitative comments are also recorded.
High quality photographs of all drill core before being sampled were taken under controlled light at the HGO core yard at Kanmantoo.
All geological logging is recorded into Geobank (a database product from Micromine) templates and visually validated before being imported into the
Hillgrove drill hole database. Additional validation is conducted automatically on import.
In addition, a geotechnical log of all drill core is recorded utilising standard geotechnical logging indexes. RQD is 98-100%. UG drill core is selectively
oriented. Where required, orientation of structure relative to the dominant S2 foliation is recorded.
For selected intervals the core was sawn in half and the half core despatched to ALS for each sample interval and the entire sample then crushed and 1kg
riffle split from the crushed mass and the 1kg sub-sample then pulverised. A sub-split of 200 grams was then split by ALS and retained, and the reject
pulverised material returned to Hillgrove. From the 200 gram sub-split a 2 gram aliquot was scooped and weighed by ALS for 4-acid digestion.
7 of 13
Criteria
Commentary
sample
preparation
•
Hillgrove have detailed sampling and QAQC procedures in place to ensure sample collection is carried out to maximise representivity of the samples, to
minimise contamination, and to maintain sample numbering integrity.
Quality of assay
data and
laboratory tests
•
The samples were submitted to ALS for analysis. ALS code ME-MS61 using a 4-acid digest with determination by Mass Spectrometry. If the copper result
was greater than 1%, the analysis was repeated using a modified acid digestion technique. Gold is assayed by 30g Fire Assay. If > 10 g/t then repeated by
fire assay with a gravimetric finish.
The QAQC of sample preparation and analysis processes were via the following samples:
o Certified reference materials (CRM’s) inserted by HGO into the sample sequence at a frequency of one in 20. OREAS standard 523B has been used to
provide a CRM Standard grade of 1.66% Cu, and 1.05 g/t Au and OREAS standard 924 has been used for copper at a CRM standard grade of 0.512% Cu
which are relevant for the expected cutoff grades used for resource estimates across the Kanmantoo deposit.
•
o Results from all returned QAQC samples provide reasonable confidence as to the accuracy of the assay results used in the estimation. 100% of assays
8 of 13
Criteria
Commentary
•
•
fall within 2SD of the expected CRM mean grade for Cu and Au.
o Laboratory inserted QAQC samples were inserted with a minimum of two standards and one blank for every batch of 40 samples.
Quartz flushes with <60ppm Cu are introduced to the crushers and bowl pulverisers within every high sulphide interval. These are monitored and where Cu
contamination of the quartz flush occurs the batch is repeated. For the holes reported there are no examples of sulphides contaminating successive
samples via sample preparation processes.
Hillgrove‘s quality policy is that at a minimum of 5% of all samples are CRM’s, and 5% of samples submitted are blanks thus ensuring that as a minimum,
10% of all samples submitted for analysis are Hillgrove QAQC samples.
Verification of
sampling and
assaying
•
Sample data sheets are prepared in Geobank Field Teams and printed for technicians use. All core is marked for sampling and confirmed by the logging
geologist. Sample Sheets also include the sample number sequence and the sample numbers to be assigned to the QAQC samples. Sample intervals input
from the excel spreadsheet into an SQL database via Geobank. Data was visually checked by the Geologist prior to import and additional validation was
carried out by the database upon import. Copper results were reported in ppm units from the laboratories and then converted to a % value within the
database.
Location of data
points
•
•
•
•
The map projection of Map Grid of Australia 1994 - Zone 54, (MGA94-54) is used for all work undertaken for this drilling.
The UG rigs set ups are aligned by qualified surveyors setting up the drill rigs in the UG drill access.
All drill hole collars are surveyed with a Leica survey total station. The accuracy of this instrument is 0.01m. All pick-ups were reported in MGA94-54
coordinate system once the drill rig is moved from the collar pivot point. The hole reported will have the collar point adjusted at the conclusion of drilling
from this site.
Downhole surveys were determined using a gyro survey instrument at 12m intervals and recorded in Grid North.
Data spacing and
distribution
•
See Table 2 above and Figures 1 and 2 in the body of the text for drill hole locations.
Orientation of
data in relation to
•
•
All holes are angled drill holes, dipping between 7.5 to -33 deg. Drill holes are orientated towards the South from 125deg to 190deg (MGA Grid North).
All down hole surveys are by Reflex or Axis Gyro. The hole was oriented drill core.
9 of 13
Criteria
Commentary
geological
structure
•
•
Dominant mineralisation trends as measured from in-pit and Underground mapping are strike ~040deg and dip -75deg to east.
It is important to note that current drill holes are all at various strike and dip angles to section, and that the true width varies for each intersection.
Sample security
•
A Hillgrove employee is responsible for collecting and organising the samples ready for assay. Hillgrove has a detailed sample collection/submission
procedure in place to ensure sample security.
Drill core is transported from the UG drill site to Hillgrove’s core yard at Kanmantoo under the supervision of Hillgrove staff.
Transport of the samples for ALS assaying is by dedicated road transport to the Adelaide sample preparation facility. All samples are transported in sealed
plastic bags and are accompanied by a detailed sample submission form.
At ALS, on receiving a batch of samples, the receiving laboratory checks received samples against a sample dispatch sheet supplied by Hillgrove personnel.
On completion of this check a sample reconciliation report is provided for each batch received.
•
•
•
Audits or reviews
Section 2
•
There has not been an external review of this DDH drilling program. Previous audits of the Hillgrove sampling methods were reviewed by independent
consultant and were considered to be of a very high standard.
Reporting of Exploration Results
Criteria
Commentary
Mineral tenement
and land tenure
status
•
•
The Kanmantoo Cu-Au mine is situated on Mining Lease ML6345 + ML6436 and is owned 100% by Hillgrove.
Hillgrove owns the land covered by the Mining Lease. The Mine Lease is encompassed on all sides by EL6526 also owned 100% by Hillgrove. All drill
holes were drilled on land owned or rented by Hillgrove Resources.
Exploration done
by other parties
•
Hillgrove commenced exploration drilling in 2004 and since then has completed a number of exploration sampling and mapping campaigns which
have resulted in defining the drill targets.
10 of 13
Criteria
Commentary
Geology
•
Mineralisation occurs as an epigenetic system of structurally controlled veins and disseminations of chalcopyrite, pyrrhotite, pyrite, magnetite,
within a quartz + biotite + andalusite ± garnet ± chlorite +/- staurolite schist host rock. Structural studies suggest the mineralisation is within brittle
structures that have been re-activated. Mineralogical Studies suggest that the gold in the system is very fine with the particle size observed on the
micron scale and overprinting all other mineralisation events.
Drill hole
Information
•
Drill collars, surveys, intercepts are reported in the body of this release.
Data aggregation
methods
•
Intercepts tabulated in the table are amalgamated over a minimum down hole length of 2.5m > 0.3% Cu with a maximum of 2m internal dilution <
0.3% Cu. Or a minimum down hole length of 2.5m > 0.3g/t Au with a maximum of 1m internal dilution < 0.3g/t Au. No assays were cut before
amalgamating the intercept
Mineralisation
widths
•
Table of downhole mineralised intercepts is reported in the body of this release.
Diagrams
•
Diagrams that are relevant to this release have been included in the body of the release.
Balanced
reporting
•
All drill holes selected as resource expansion have been reported.
Other exploration
data
•
In situ rock density has been measured by wet immersion method. The results indicate that the bulk rock density of 3.1t/m3 as used at the Kavanagh
mine site is still a reasonable representation of bulk density for all mineralisation.
Further work
•
Geological interpretation of the geology and assays to estimate a resource suitable for continued underground mine planning studies.
11 of 13
APPENDIX C: Kanmantoo 2024 Mineral Resource
Mine Area
Kavanagh
(including
Spitfire)
North
Kavanagh
JORC
Classification
Tonnage
(kt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Bi
(ppm)
Cu
Metal
(kt)
Au
Metal
(koz)
Measured
3,200
0.94
0.04
2.9
190
30
4
Indicated
3,400
0.77
0.10
2.4
97
26
11
Inferred
6,300
0.70
0.11
2.4
110
44
22
Sub-Total
13,000
0.78
0.09
2.5
130
100
37
Measured
-
-
-
-
-
-
-
Indicated
230
0.78
0.17
3.0
140
2
1
Inferred
110
0.77
0.21
3.3
130
1
1
Sub-Total
340
0.78
0.18
3.1
140
3
2
Measured
-
-
-
-
-
-
-
Indicated
2,300
0.74
0.36
1.7
66
17
26
Inferred
1,100
0.71
0.35
1.6
40
8
13
Sub-Total
3,400
0.73
0.36
1.6
57
25
39
Measured
-
-
-
-
-
-
-
Indicated
-
-
-
-
-
-
-
Inferred
2,600
0.77
0.08
1.6
110
20
7
Sub-Total
2,600
0.77
0.08
1.6
110
20
7
19,300
0.77
0.14
2.2
110
150
82
Nugent
Emily Star
TOTAL
Notes:
1.
2.
3.
4.
5.
Due to effects of rounding, total numbers may not sum.
Tonnage and metal are rounded to the nearest 1,000 tonnes, grades are rounded to 2 significant figures.
Mineral Resource is Reported at a 0.4% Cu Cut Off Grade for all Mine Areas.
Mineral Resource is depleted for mining as at 30 June 2024.
Mine depletion refers to current Kavanagh UG operation, and historical Giant Pit, Nugent and Emily Star open pits
The information is extracted from the report entitled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper
Mineral Resource Endowment’ released on 18 October 2024 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the original market announcement and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
12 of 13
APPENDIX D: Kanmantoo 2024 Mineral Reserve
Mine Area
Kavanagh
Nugent
Total Ore Reserve
(Kavanagh + Nugent)
Tonnes
(kt)
Cu
(%)
Au (ppm)
Ag (ppm)
Bi (ppm)
Cu Metal
(kt)
Au Metal
(koz)
Proved
1,100
1.01
0.04
2.82
220
12
1
Probable
1,000
0.88
0.15
2.7
140
9
5
Proved + Probable Kavanagh Total
2,100
0.95
0.09
2.76
180
21
6
Proved
-
-
-
-
-
-
-
Probable
670
0.76
0.33
1.44
79
5
7
Proved + Probable Nugent Total
670
0.76
0.33
1.44
79
5
7
Proved
1,200
1.01
0.04
2.82
220
12
1
Probable
1,700
0.83
0.22
2.21
110
14
12
Proved + Probable
2,800
0.91
0.15
2.45
160
26
14
JORC Classification
Notes:
1.
2.
3.
4.
5.
6.
7.
8.
Dry metric tonnes.
0.6% Copper (Cu) design cut-off grade.
No Probable Ore Reserve was derived from Measured Mineral Resource.
Minimum stope mining width 5.0m apparent.
Grades are rounded to two decimal places. Tonnages are rounded to two significant figures.
Any minor apparent discrepancies for sums in the table are related to rounding.
The period for economic extraction is from Sept 2024 until April 2027.
Ore Reserve converted from Mineral Resource is based on the October 2024 Mineral Resource report by Caitlin
Rowett (Hillgrove Resources Limited) and Sonia Konopa (ERM) titled “Kavanagh, Nugent & North Kavanagh
Underground Mineral Resource Estimate", as at 30th September 2024.
9. Competent Person: Tom Bailey MAusIMM (#206304).
10. Mining has commenced and observed ground conditions have been very good. Further geotechnical investigation is
required to increase confidence in the stable mining spans.
The information is extracted from the report entitled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper
Mineral Resource Endowment’ released on 18 October 2024 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the original market announcement and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
13 of 13
Share your feedback
Discover