CORPORATE SNAPSHOT
Company Overview
Investment Highlights
• ASX listed (‘HGO’) Australian resources company that owns and
operates the Kanmantoo Copper Gold Mine in South Australia
✓ Advanced, fully permitted and funded project with key
• 20 years of strong operating experience and award-winning positive
stakeholder engagement
✓ One of the only near-term new copper producers on the ASX
✓ Multiple opportunities to increase resource base, annual
• After completion of open pit operations in 2020, underground mine
now being developed with first copper production in Q1-2024
Market Statistics
infrastructure in place
production and mine life through lower cost underground drilling
✓ Highly leveraged to current and forecast copper price strength
Share Price – 3 years
15,000
0.14
14,000
0.12
Share Price(1)
A$
0.066
Shares on Issue
M
1,912
13,000
Market Capitalisation
A$M
126
12,000
101
11,000
Enterprise Value(2)
A$M
Liquidity - 12 Months
M shares
Carried forward income tax losses(3)
A$M
235
Franking credits
A$M
17.6
Note (1): Share price at close 29 November 2023
Note (2): Net cash at 30 September 2023 (unaudited)
Note (3): At 31 December 2022 (unaudited)
584 (31%)
0.10
0.08
0.06
10,000
9,000
0.04
8,000
0.02
Copper A$/t (LHS)
HGO $/share (RHS)
3
FULLY PERMITTED IN TIER 1 JURISDICTION
✓ Tier 1 location
✓ Ready workforce - No FIFO
✓ Close to Port Adelaide
Top 10 jurisdiction in world
Mining Investment Attractiveness
4
FULLY PERMITTED IN TIER 1 JURISDICTION
✓ Community support built over 20 years of genuine engagement
5
PLANT AND INFRASTRUCTURE ALREADY IN PLACE
✓ 3.6Mtpa processing plant
✓ All critical spares on site
✓ Maintained for quick, low-cost restart
6
TAILINGS STORAGE FACILITY WITH AMPLE CAPACITY
✓ Tailings storage with approved capacity of >7Mt, well above current mine plan of 4.5Mt
✓ Further low-cost capacity available to accommodate growing mine plan
✓ All services connected (power, water). Long term power contract provides low prices until 2027
7
ESTABLISHED WORKSHOP
8
MINING COMMENCED
Nugent Portal
Ventilation drive
Development decline and
underground drill platform
9
EXCELLENT CONDITIONS ENABLE FAST TURNOVER
Underground decline commenced
10
EXCELLENT CONDITIONS ENABLE FAST TURNOVER
11
PRIMARY VENT INSTALL INCREASES PRODUCTION
Primary ventilation enables additional
equipment to be deployed underground,
increasing mine development rates.
12
SECONDARY EGRESS BEING INSTALLED TO ENABLE STOPING
First stope
Secondary egress
13
UNDERGROUND DRILLING FIRMING UP INITIAL STOPES
14
UNDERGROUND DRILLING FIRMING UP INITIAL STOPES
15
ORE STOCKPILED
✓ Underground development underway
✓ First copper only 13m from portal
16
ORE STOCKPILED
High grade ore on the ROM stockpile
17
MILL REFURBISHMENT ON TRACK FOR FIRST COPPER
Pipe welding
Float cell refurbishment
Mill motor inspection
18
ROTABLE CONTAINERS ARRIVED TO PORT ADELAIDE
19
ON TRACK FOR FIRST COPPER Q1 2024
20
EXPLORATION GROWTH
21
> 100% EXPLORATION STRIKE RATE
139 holes
163 significant Cu-Au intercepts
600% increase in MRE
22
JUST SCRATCHING THE SURFACE
Current Mine Plan
23
SPITFIRE
✓ 45.4m @ 1.19%Cu, 0.12 g/t Au from 428.5m downhole (KTDD243_W1)
✓ Nearest hole > 100m
Refer ASX Announcement 28 August 2023
24
EMILY
✓ 71.7m @ 0.89%Cu from 132.7m downhole (KTDD239)
✓ 68.7m @ 0.9% Cu from 158.6m downhole (KTDD240), including;
✓ 35m @ 1.29%Cu from 192.2m downhole
Refer ASX Announcement 3 July 2023
25
KANMANTOO
DEEPS
Exploration Target
50 - 80Mt
0.8 - 1.2%Cu
0.1 - 0.2g/t Au
Refer ASX Announcement 11 October 2023
The Exploration Target above is for Kanmantoo Deeps only.
The Exploration Target is conceptual in nature as there has
been insufficient exploration to define a Mineral Resource. It is
uncertain if further exploration will result in the determination of
a Mineral Resource under the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves,
the JORC Code” (JORC 2012). The Exploration Target is not
being reported as part of any Mineral Resource or Ore Reserve.
26
AUSTRALIA’S NEXT COPPER MINE
27
Appendix
28
IMPORTANT NOTICE & DISCLAIMER
Summary information
This presentation contains summary information about Hillgrove Resources Limited (Hillgrove or the Company) and its activities as at 27 February 2023. The
information in this presentation is of a general nature and does not purport to be complete nor does it contain all information which a prospective investor may
require in evaluating a possible investment in the Company or that would be required in a prospectus or product disclosure statement prepared in accordance with
the requirements of the Corporations Act. The historical information in this presentation is, or is based on, information that has been released to the ASX. This
Presentation should be read in conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the ASX, which are available
at www.asx.com.au
Any market and industry data that may be used in connection with this presentation may have been obtained from research, surveys or studies conducted by third
parties, including industry or general publications. None of the Company, its representatives or advisers have independently verified that market or industry data
provided by third parties or industry or general publications.
Statements made in this presentation are made only as at the date of this presentation. The information in this presentation remains subject to change without
notice. The Company reserves the right to withdraw the offer or vary the timetable for the offer without notice.
Not an offer
This presentation is not an offer or invitation to acquire new shares in the Company or any other financial products and is not a prospectus, product disclosure
statement or other offering document under Australian law (and will not be lodged with ASIC) or any other law. This presentation is for information purposes only
and is not an invitation or offer of securities for subscription, purchase or sale in any jurisdiction.
Not financial product advice
This presentation does not constitute financial product or investment advice or any recommendation to acquire new shares or accounting, legal or tax advice. It
has been prepared without taking into account the objectives, financial or tax situation or needs of individuals. Before making an investment decision, prospective
investors should consider the appropriateness of the information having regard to their own objectives, financial and tax situation and needs and obtain legal and
taxation advice appropriate to their jurisdiction. Hillgrove is not licensed to provide financial product advice. Cooling off rights do not apply to the acquisition of new
shares under the Offer.
Future performance
This presentation includes both information that is historical in character and information that consists of forward-looking statements. Forward-looking statements
are not based on historical facts, but are based on current expectations of future results or events. This presentation contains or may contain certain “forwardlooking statements” and comments about future events, that are based on Hillgrove management's beliefs, assumptions and expectations and on information
currently available to management as at the date of this presentation. Often, but not always, forward-looking statements can generally be identified by the use of
forward looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production potential, estimates of future 29
Mineral Resources and Ore Reserves.
IMPORTANT NOTICE & DISCLAIMER
Future performance continued
The forward looking statements are subject to risks, stakeholder engagement, uncertainties and assumptions which could cause actual results, timing, or events to
differ materially from the expectations described in such forward-looking statements. Those risks and uncertainties include factors and risks specific to the industry
in which Hillgrove operates, any applicable legal requirements, as well as matters such as general economic conditions. These factors include, but are not limited
to the potential that any of Hillgrove's projects may experience technical, geological, metallurgical and mechanical problems, changes in market prices and other
risks not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans and/or resources,
changes in equipment life or capability, emergence of previously underestimated technical challenges, increased costs, and demand for production inputs.
While Hillgrove believes that the expectations reflected in the forward looking statements in this presentation are reasonable, neither Hillgrove nor its directors or
any other person named in the presentation can assure you that such expectations will prove to be correct or that implied results will be achieved. These forward
looking statements do not constitute any representation as to future performance and should not be relied upon as financial advice of any nature. Any forward
looking statement contained in this document is qualified by this cautionary statement.
Mineral Resources and Ore Reserves Estimates
The Economic Assessment discussed in this Presentation, has been undertaken to explore the technical and economic feasibility of developing an underground
mine to economically and sustainably exploit the Kanmantoo Copper Gold Deposit, located in South Australia. The Kanmantoo Copper Gold Project (Kanmantoo
or Project) is 100% owned by Hillgrove Resources Limited.
The Production Target and financial forecasts presented in the Economic Assessment are shown on a 100% Project basis. The Production Target underpinning the
Base Case financial forecasts included in the Economic Assessment comprises 74% Measured and Indicated Resources, and 26% Inferred Resources. The
Production Target included in the Economic Assessment relating to the project payback period of 9 months post the completion of pre-production works comprises
84% Measured and Indicated Resources, and 16% Inferred Resources.
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Hillgrove is subject to Australian disclosure requirements and
standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting
of ore reserves and mineral resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (the JORC Code) and that the Mineral Resource Estimate underpinning the Base Case Production Target has been prepared by a Competent
Person in accordance with the requirements in the JORC Code 2012.
30
IMPORTANT NOTICE & DISCLAIMER
Mineral Resources and Ore Reserves Estimates continued
There is a lower level of geological and grade continuity confidence associated with Inferred Resources and there is no certainty that further exploration work will
result in the conversion of Inferred Resource estimates to Indicated Resource estimates or return the same grade and tonnage distribution.
The economic outcomes associated with the Economic Assessment are based on certain assumptions made for commodity prices, concentrate treatment and
recovery charges, exchange rates and other economic variables, which are not within the Company's control and subject to change from time to time.
Changes in such assumptions may have a material impact on economic outcomes. To achieve the range of outcomes indicated in the Economic Assessment,
additional funding will likely be required. Investors should note that there is no certainty that Hillgrove will be able to raise that amount of funding when needed. It is
also possible that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Hillgrove’s existing shares.
Disclaimer
To the maximum extent permitted by law, neither Hillgrove nor
its related corporations, directors, officers, employees or
agents, nor any other person, accepts any liability, including,
without limitation, any liability arising from fault or negligence,
for any loss arising from the use of this presentation or its
contents or otherwise arising in connection with it. Hillgrove is
under no obligation to release any updates or revisions to this
presentation to reflect any change in expectation or
assumptions and disclaim all responsibility and liability for
these forward-looking statements (including, without limitation,
liability for fraud or negligence).
Kanmantoo Underground Mineral Resource Estimate
Deposits
JORC 2012
Tonnage
Cu
Au
Cu Metal
Classification
(kt)
(%)
(g/t)
(kt)
Measured
780
1.28
0.10
9.9
Kavanagh 2022
Indicated
3,640
1.03
0.06
38
(0.6% Cu COG)
Inferred
1,300
1.0
0.1
10
Sub-Total
5,750
1.10
0.10
61
Indicated
865
1.19
0.64
10.3
Inferred
400
1.1
0.3
5
Sub-Total
1,270
1.18
0.54
15
Measured
780
1.28
0.1
9.9
Indicated
4,505
1.06
0.2
48
Inferred
1,700
1
0.1
15
Total
6,985
1.08
0.16
75.9
Nugent 2022
(0.7% Cu COG)
Totals
Note: Due to appropriate rounding, numbers may not sum
31
IMPORTANT NOTICE & DISCLAIMER
Competent Person’s Statement
The information in this report that relates to Exploration Target and Exploration Results is based on and fairly represents information and supporting documentation
compiled by Peter Rolley, a Competent Person, a full-time employee of Hillgrove Resources Limited, and a member of the Australian Institute of Geoscientists. Mr
Rolley has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 edition of the ‘Australian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’. Mr Rolley
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Further information on the Kanmantoo UG Mineral Resources was released to the ASX on 11 May 2022 and 26 July 2022, which is also available on the Hillgrove
Resources website at www.hillgroveresources.com.au
Hillgrove Resources confirms that it is not aware of any new information or data that materially affects the information included in that market announcement and,
in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. Hillgrove Resources confirms that the form and context in which the findings of the Competent
Persons (Peter Rolley in relation to the Exploration Target and to the Mineral Resource Estimates) are presented, have not been materially modified from the
original market announcement.
32
INVESTMENT RISKS
Potential investors should be aware that there are risks associated with investing in Hillgrove. Certain risks are beyond the control of Hillgrove and its Directors
and Management and may have a material impact on Hillgrove's future operating and financial performance, and/or the financial position of Hillgrove, its prospects
and/or the value of the Shares. Some of the key risks associated with an investment in Hillgrove are described as follows.
•
In the event that Hillgrove undertakes a development project, then that development could be delayed or unsuccessful for a number
of reasons including extreme weather, unanticipated operational occurrences, failure to obtain necessary approvals, insufficient
funds, a drop-in commodity price, supply chain failure, unavailability of appropriate labour, or an increase in costs. If one or more of
these occurrences has a material impact, then Hillgrove's operational and financial performance may be negatively affected.
•
Adverse weather conditions events, unforeseen increases in establishment costs, mechanical failures, human errors, industrial
disputes or other unforeseen events, could lead to increased costs or delay to the Company's activities. The Company will mitigate
this risk by, amongst other things, taking out appropriate insurance in line with industry practice.
•
Commodity prices (in particular prices for copper and gold), concentrate treatment and recovery charges, exchange rates and other
economic variables, will have a material influence on the financial performance of the Company. It is impossible to predict future
commodity prices with confidence and the factors which impact it include, but are not limited to, global political situations, military
conflicts, technological changes, output controls and global consumption which are all outside the control of Hillgrove.
•
The enactment of new legislation or adoption of new requirements of a governmental authority may restrict or affect Hillgrove's ability
to:
o
conduct mining activities and exploit the Kanmantoo Copper Gold Deposit (or any other project / resource) efficiently and
effectively; or
o
sell product to particular consumers, which may affect the financial performance of the Company (e.g. the implementation of
sanction laws preventing the sale of product to consumers in certain countries).
•
There is a risk that community disapproval may lead to direct action which impedes Hillgrove's ability to carry out its lawful
operations, resulting in project delay, reputational damage and increased costs and thus impact the financial performance of the
Company.
Development risk
Operational risk
Price risk
Regulatory risk
Community
opposition risk
33
INVESTMENT RISKS
•
The future success of the Company depends, to a significant extent, upon the continued services of the members of the management
team of the Company. There can be no assurance that the Company will be able to retain or hire all personnel necessary for the
development and operation of its business. The loss of senior managers could harm the Company’s business and its future
prospects.
•
Prospective investors should also consider the following risks associated with investments in equity capital such as Hillgrove shares:
Key person
dependence
General risk factors
o
Investment risks, such as changes in the Company’s own assessment of the economics of developing its assets or the market
perception of the value of the Company's assets and shares;
o
Share market and liquidity risks involved in the listing and trading of shares on the ASX;
o
Economic, political and social factors, including activism and pandemics, and the effect on the market price of shares of
movements in equities markets, commodity process, currency fluctuations and interest rates, and local and global political and
economic conditions;
o
Epidemics and pandemics such as COVID-19;
o
Geo-political instability, including international hostilities and acts of terrorism;
o
Circumstances requiring Hillgrove to change its strategy;
o
The Australian economy deteriorating; and
o
Stock market sentiment fluctuations impacting on the Hillgrove share price.
•
These risks are associated with an investment in Shares but are not an exhaustive list. As a Shareholder, you will continue to be
exposed to such risks. There may also be additional risks and uncertainties not currently known which may have an adverse effect on
Hillgrove's business and the value of the Shares. Where possible, Hillgrove will seek to minimise its exposure to, and mitigate the
effects of, these risks. However, certain risks relate to matters that are outside the control of Hillgrove, and there can be no assurance
that any steps that HIllgrove takes will successfully protect it from any particular risk.
•
The risks identified do not take into account the investment objectives, financial situation, tax position or other circumstances of any
particular Shareholder. Shareholders should have regard to their own investment objectives and financial circumstances and seek
professional advice from their legal, financial or other independent adviser before determining whether or not to participate in the
institutional placement or share purchase plan.
34
REFERENCES
All exploration drill results, exploration information and Mineral Resource Estimates have previously been reported to the ASX by Competent Person at the time. The results
reported herein are reported in the form and context of the original ASX releases. Refer http://www.hillgroveresources.com.au/announcements
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
20 Jun 2019
10 Oct 2019
31 Oct 2019
5 Nov 2019
2 Jun 2020
11 Aug 2020
3 Sep 2020
7 Dec 2020
3 May 2021
6 May 2021
24 May 2021
26 Aug 2021
1 Sep 2021
21 Mar 2022
28 Apr 2022
6 May 2022
11 May 2022
26 Jul 2022
8 Aug 2022
27 Feb 2023
2 Marc 2023
14 Mar 2023
17 Mar 2023
23 Mar 2023
19 Jun 2023
3 Jul 2023
28 Aug 2023
11 Oct 2023
13 Nov 2023
Drilling of Kanmantoo Cu-Au Deeps to Commence
Excellent Drill Results from Kanmantoo Cu-Au Deposit
Maiden Kavanagh Underground Mineral Resource Estimate
Additional Information to Maiden Kavanagh Underground
Underground Drilling Program Recommences
Excellent Gold Recoveries from Kanmantoo
Drilling Expands Cu-Au Footprint at Kanmantoo Underground
Updated Kanmantoo Underground Mineral Resource Estimates
Drilling Confirms Down-Dip Cu-Au Mineralisation at Kanmantoo
Hillgrove Hits 170m of Copper Mineralisation at Kanmantoo
Hillgrove Awarded Two Exploration Grants by SA Government
New Gold Discovery Confirmed at Stella
Hillgrove Hits 166m of Copper Mineralisation at Kanmantoo
Multiple High-Grade Intersections within a Broader +100 metre Zone of Copper Mineralisation
First Underground Drilling Platform Established
Nugent Copper Gold Zone Delivers Excellent Results – Amended
Updated Kavanagh Mineral Resource Estimate
Updated Nugent Mineral Resource Estimate
Spitfire Drilling Results
Updated Economic Assessment Expands Mine Life
$39m Institutional Placement and SPP for Kanmantoo Restart
Mine Extension Drilling to Commence at Kanmantoo
Works for Kanmantoo Copper Mine Restart Now Underway
Kanmantoo Exploration Target Update
Kanmantoo Positive Investment Decision
Emily Star Drilling Results
Step Out Hole at Kavanagh Hits 45.4m @ 1.2% Cu
Kanmantoo Deeps Exploration Target Update – Restated
Kanmantoo Underground Confirmation Drilling Results