$10 Million Placement To Fund Mine Extension Drilling
Released
Released
Announcement PDF
Monday, 26 February 2024
$10 MILLION PLACEMENT TO FUND MINE EXTENSION DRILLING
KEY HIGHLIGHTS
•
•
•
•
After the production of first copper earlier this month following the recommissioning of the Kanmantoo
Copper Mine, Hillgrove is now focused on ramping up production and extending the mine life.
Firm commitments secured for a $10.0 million Placement to grow the Resource and mining inventory at
Kanmantoo, with funds used as follows:
o Mine extension drilling down dip of existing lodes;
o Drilling of other deposits within the mining lease;
o Drill testing the significant Kanmantoo Deeps target; and
o General working capital purposes.
Major shareholder Freepoint Metals & Concentrates LLC (“Freepoint”) will subscribe for their pro-rata
share in the Placement, equating to circa $2.0m.
Recent positive drilling results highlight the significant growth opportunity at Kanmantoo, including1:
o 36.6m @ 3.35% Cu from 43m downhole in East Kavanagh (23KVUG064)
o 45.4m @ 1.19% Cu and 0.12g/t Au from Spitfire from 428.5m downhole (KTD243_W1)
o 40m @ 1.27% Cu from 43m downhole in Central Kavanagh (23KVUG072)
o 33.23m @ 1.46% Cu from 42m downhole in East Kavanagh (23KVUG083)
Hillgrove Resources Limited (ABN 73 004 297 116) (ASX:HGO) ("Hillgrove", "the Company") is pleased to announce
that it has successfully completed a $10.0 million capital raising via a two tranche placement of new fully paid
ordinary shares in Hillgrove ("New Shares") to institutional and sophisticated investors ("Placement"). The
Company’s major shareholder Freepoint will subscribe for its pro-rata share in the Placement, equating to $2.0m.
Commenting on the Placement, Hillgrove CEO and Managing Director, Lachlan Wallace said:
“Following the commencement of copper production from the Kanmantoo underground, we are
seeking to accelerate exploration at a number of our exciting targets with a view to both grow mine
life and increase the annual throughput. This can have a material impact on the value of the Company
and we want to push this ahead as quickly as possible. The $10.0m Placement facilitates this
exploration growth and also provides working capital support to ramp up the underground mining to
the planned steady state production rate.
We have seen extraordinary success in our exploration efforts with 139 holes drilled for 163 significant
intercepts of copper and gold. Kanmantoo is a predictable and structurally controlled system and as
we drill more, we find more copper. We look forward to accelerating the drilling, with a view to growing
the Resource and mine life, and increasing annual copper production.”
1
ASX Announcements of 28 August 2023 and 13 November 2023
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
CAPITAL RAISING TERMS
Tranche 1 Placement
The Tranche 1 Placement will involve the issue of 133,376,994 New Shares at an issue price of $0.060 per share,
raising $8.0 million (before costs). The issue is pursuant to the Company’s available placement capacity under ASX
Listing Rules 7.1.
Tranche 2 Placement
The Company has entered into a binding Commitment Letter with Freepoint for the issue of Shares under the
Tranche 2 Placement. The Commitment Letter is subject to approval by the Foreign Investment Review Board
under the Foreign Acquisitions and Takeovers Act 1975 (Cth). The Tranche 2 Placement will involve the issue of
33,289,673 New Shares to Freepoint at an issue price of $0.060 per share, raising $2.0 million (before costs). The
issue is pursuant to the Company’s available placement capacity under ASX Listing Rules 7.1 and does not require
shareholder approval. If FIRB approval is not obtained, the Tranche 2 Placement will not proceed.
Canaccord Genuity acted as the Sole Lead Manager for the Placement.
INDICATIVE TIMETABLE
The indicative timetable of the Placement is detailed below:
INDICATIVE TIMETABLE INFORMATION
PLACEMENT
Settlement of Tranche 1 Placement Shares
Thursday, 29 February 2024
Allotment of new shares under Tranche 1 Placement
Friday, 1 March 2024
Settlement of Tranche 2 Placement Shares
As soon as possible after FIRB
approval2
Allotment of new shares under Tranche 2 Placement
The next business day following the
Settlement of Tranche 2 Placement
Shares
Note – the timetable is indicative only and subject to change. The commencement and quotation of New Shares is subject to confirmation from
ASX. Subject to the requirements of the Corporations Act, the ASX Listing Rules and other applicable rules, Hillgrove reserves the right to amend this
timetable at any time – unless otherwise specified, all times and dates refer to Sydney time.
INVESTOR PRESENTATION
Further details of the capital raising are outlined in the investor presentation appended below.
2 The settlement date and the allotment date of the Tranche 2 Placement Shares will depend on the date of receipt of the FIRB approval.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
Authorised for release by the Board of Hillgrove Resources Limited.
For more information contact:
Mr Lachlan Wallace
CEO & Managing Director
Tel: +61 (0)8 7070 1698
Mr Joe Sutanto
CFO & Company Secretary
Tel: +61 (0)8 7070 1698
NOT FOR RELEASE OR DISTRIBUTION IN THE UNITED STATES
This announcement has been prepared for publication in Australia and may not be released to US wire services or
distributed in the United States. This announcement does not constitute an offer to sell, or a solicitation of an
offer to buy, securities in the United States or any other jurisdiction. Any securities described in this announcement
have not been, and will not be registered, under the US Securities Act of 1993, as amended (the “Securities Act”)
and may not be offered or sold in the United States except in transactions exempt from, or not subject to,
registration under the Securities Act and applicable US state securities laws.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
AUSTRALIA’S NEWEST COPPER PRODUCER
Lachlan Wallace
CEO & Managing Director
February 2024
1
IMPORTANT NOTICE & DISCLAIMER
Summary information
This presentation contains summary information about Hillgrove Resources Limited (Hillgrove or the Company) and its activities as at the date of publication. The
information in this presentation is of a general nature and does not purport to be complete nor does it contain all information which a prospective investor may
require in evaluating a possible investment in the Company or that would be required in a prospectus or product disclosure statement prepared in accordance with
the requirements of the Corporations Act. The historical information in this presentation is, or is based on, information that has been released to the ASX. This
Presentation should be read in conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the ASX, which are available
at www.asx.com.au
Any market and industry data that may be used in connection with this presentation may have been obtained from research, surveys or studies conducted by third
parties, including industry or general publications. None of the Company, its representatives or advisers have independently verified that market or industry data
provided by third parties or industry or general publications.
Statements made in this presentation are made only as at the date of this presentation. The information in this presentation remains subject to change without
notice. The Company reserves the right to withdraw the offer or vary the timetable for the offer without notice.
Not an offer
This presentation is not an offer or invitation to acquire new shares in the Company or any other financial products and is not a prospectus, product disclosure
statement or other offering document under Australian law (and will not be lodged with ASIC) or any other law. This presentation is for information purposes only
and is not an invitation or offer of securities for subscription, purchase or sale in any jurisdiction.
Not financial product advice
This presentation does not constitute financial product or investment advice or any recommendation to acquire new shares or accounting, legal or tax advice. It
has been prepared without taking into account the objectives, financial or tax situation or needs of individuals. Before making an investment decision, prospective
investors should consider the appropriateness of the information having regard to their own objectives, financial and tax situation and needs and obtain legal and
taxation advice appropriate to their jurisdiction. Hillgrove is not licensed to provide financial product advice. Cooling off rights do not apply to the acquisition of new
shares under the Offer.
Future performance
This presentation includes both information that is historical in character and information that consists of forward-looking statements. Forward-looking statements
are not based on historical facts, but are based on current expectations of future results or events. This presentation contains or may contain certain “forwardlooking statements” and comments about future events, that are based on Hillgrove management's beliefs, assumptions and expectations and on information
currently available to management as at the date of this presentation. Often, but not always, forward-looking statements can generally be identified by the use of
forward looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include,
without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production potential, estimates of future 2
Mineral Resources and Ore Reserves.
IMPORTANT NOTICE & DISCLAIMER
Future performance continued
The forward looking statements are subject to risks, stakeholder engagement, uncertainties and assumptions which could cause actual results, timing, or events to
differ materially from the expectations described in such forward-looking statements. Those risks and uncertainties include factors and risks specific to the industry
in which Hillgrove operates, any applicable legal requirements, as well as matters such as general economic conditions. These factors include, but are not limited
to the potential that any of Hillgrove's projects may experience technical, geological, metallurgical and mechanical problems, changes in market prices and other
risks not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans and/or resources,
changes in equipment life or capability, emergence of previously underestimated technical challenges, increased costs, and demand for production inputs.
While Hillgrove believes that the expectations reflected in the forward looking statements in this presentation are reasonable, neither Hillgrove nor its directors or
any other person named in the presentation can assure you that such expectations will prove to be correct or that implied results will be achieved. These forward
looking statements do not constitute any representation as to future performance and should not be relied upon as financial advice of any nature. Any forward
looking statement contained in this document is qualified by this cautionary statement.
Mineral Resources and Ore Reserves Estimates
The Economic Assessment discussed in this Presentation, has been undertaken to explore the technical and economic feasibility of developing an underground
mine to economically and sustainably exploit the Kanmantoo Copper Gold Deposit, located in South Australia. The Kanmantoo Copper Gold Project (Kanmantoo
or Project) is 100% owned by Hillgrove Resources Limited.
The Production Target and financial forecasts presented in the Economic Assessment are shown on a 100% Project basis. The Production Target underpinning the
Base Case financial forecasts included in the Economic Assessment comprises 74% Measured and Indicated Resources, and 26% Inferred Resources. The
Production Target included in the Economic Assessment relating to the project payback period of 9 months post the completion of pre-production works comprises
84% Measured and Indicated Resources, and 16% Inferred Resources.
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Hillgrove is subject to Australian disclosure requirements and
standards, including the requirements of the Corporations Act and the ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting
of ore reserves and mineral resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (the JORC Code) and that the Mineral Resource Estimate underpinning the Base Case Production Target has been prepared by a Competent
Person in accordance with the requirements in the JORC Code 2012.
3
IMPORTANT NOTICE & DISCLAIMER
Mineral Resources and Ore Reserves Estimates continued
There is a lower level of geological and grade continuity confidence associated with Inferred Resources and there is no certainty that further exploration work will
result in the conversion of Inferred Resource estimates to Indicated Resource estimates or return the same grade and tonnage distribution.
The economic outcomes associated with the Economic Assessment are based on certain assumptions made for commodity prices, concentrate treatment and
recovery charges, exchange rates and other economic variables, which are not within the Company's control and subject to change from time to time.
Changes in such assumptions may have a material impact on economic outcomes. To achieve the range of outcomes indicated in the Economic Assessment,
additional funding will likely be required. Investors should note that there is no certainty that Hillgrove will be able to raise that amount of funding when needed. It is
also possible that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Hillgrove’s existing shares.
Disclaimer
To the maximum extent permitted by law, neither Hillgrove nor
its related corporations, directors, officers, employees or
agents, nor any other person, accepts any liability, including,
without limitation, any liability arising from fault or negligence,
for any loss arising from the use of this presentation or its
contents or otherwise arising in connection with it. Hillgrove is
under no obligation to release any updates or revisions to this
presentation to reflect any change in expectation or
assumptions and disclaim all responsibility and liability for
these forward-looking statements (including, without limitation,
liability for fraud or negligence).
Kanmantoo Underground Mineral Resource Estimate
Deposits
JORC 2012
Tonnage
Cu
Au
Cu Metal
Classification
(kt)
(%)
(g/t)
(kt)
Measured
780
1.28
0.10
9.9
Kavanagh 2022
Indicated
3,640
1.03
0.06
38
(0.6% Cu COG)
Inferred
1,300
1.0
0.1
10
Sub-Total
5,750
1.10
0.10
61
Indicated
865
1.19
0.64
10.3
Inferred
400
1.1
0.3
5
Sub-Total
1,270
1.18
0.54
15
Measured
780
1.28
0.1
9.9
Indicated
4,505
1.06
0.2
48
Inferred
1,700
1
0.1
15
Total
6,985
1.08
0.16
75.9
Nugent 2022
(0.7% Cu COG)
Totals
Note: Due to appropriate rounding, numbers may not sum
4
IMPORTANT NOTICE & DISCLAIMER
Competent Person’s Statement
The information in this report that relates to Exploration Target and Exploration Results is based on and fairly represents information and supporting documentation
compiled by Peter Rolley, a Competent Person, a full-time employee of Hillgrove Resources Limited, and a member of the Australian Institute of Geoscientists. Mr
Rolley has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves’. Mr
Rolley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Further information on the Kanmantoo UG Mineral Resources was released to the ASX on 11 May 2022 and 26 July 2022, which is also available on the Hillgrove
Resources website at www.hillgroveresources.com.au
Hillgrove Resources confirms that it is not aware of any new information or data that materially affects the information included in that market announcement and,
in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. Hillgrove Resources confirms that the form and context in which the findings of the Competent
Persons (Peter Rolley in relation to the Exploration Target and to the Mineral Resource Estimates) are presented, have not been materially modified from the
original market announcement.
5
COPPER PRODUCTION UNDERWAY… NOW FOR GROWTH
✓ Copper production delivered on schedule in Q1-24
✓ Costs in line with plan
✓ First cash from copper sales received
✓ Production profile ramping up as underground
development opens more stopes
✓ Now focused on growing the mine life by chasing existing
lodes down dip and along strike, and…
✓ Drilling the Kanmantoo Deeps target
6
CORPORATE SNAPSHOT
Company Overview
Investment Highlights
• ASX listed (‘HGO’) Australian resources company that owns and
operates the Kanmantoo Copper Gold Mine in South Australia
✓ One of the only copper producers on the ASX
✓ Multiple opportunities to increase resource base, annual
• 20 years of strong operating experience and award-winning positive
stakeholder engagement
• Kanmantoo open pit produced 137kt Cu & 55koz from 2011 to 2020.
• Copper production from the underground commenced in 2024.
• Debt free.
Market Statistics
production and mine life through lower cost underground drilling
✓ Spare processing capacity to increase copper production without
additional processing capital
✓ Highly leveraged to copper price
Share Price – 3 years
Share Price(1)
15,000
0.14
A$
0.075
14,000
0.12
Shares on Issue
M
1,912
13,000
143
12,000
Market Capitalisation
A$M
0.10
0.08
11,000
Enterprise Value(2)
A$M
Liquidity - 12 Months
M shares
133
10,000
629 (33%)
9,000
0.04
Carried forward income tax losses(3) A$M
270
8,000
0.02
Franking credits
17.6
Note (1): Share price at close 15 February 2024
Note (2): Net cash at 31 December 2023 (unaudited)
Note (3): At 31 December 2023 (unaudited)
Copper A$/t (LHS)
Jan-24
Nov-23
Sep-23
Jul-23
May-23
Mar-23
Jan-23
Nov-22
Sep-22
Jul-22
May-22
Mar-22
Jan-22
Nov-21
Sep-21
Jul-21
May-21
Mar-21
Jan-21
Nov-20
A$M
0.06
HGO $/share (RHS)
7
TIER 1 JURISDICTION
✓ 55km from Adelaide
✓ Access to market via Port
Adelaide, only 70km from site
where mine receives 95% of
proceeds.
✓ Local workforce
✓ Supportive government that
understands value that Resources
sector provides to the State’s
economy. State again recognised
as a Top 10 jurisdiction for
Mining Investment Attractiveness.
Top 10 jurisdiction
Mining Investment
Attractiveness
8
DELIVERING BENEFIT TO LOCAL COMMUNITY
✓ Community support built over 20
years of genuine engagement
9
EXISTING INFRASTRUCTURE
✓ 3.6Mtpa processing plant.
✓ TSF with over 7Mt permitted
capacity, well above the Stage 1
mine plan ~4.5Mt.
✓ 360m deep pit enabling fast lowcost access to mineral lodes.
✓ Combined infrastructure at
Kanmantoo cost >$200m in
~2010.
10
TWO STAGE STRATEGY - 1. GENERATE CASH, 2. GROW
STAGE 1
✓ Maintain infrastructure in
operational state to keep capital
hurdle for underground low.
✓ This resulted in underground
being one of the lowest capital
intensive copper development
projects in the world.
✓ Maintaining the plant ready for
restart requires high C&M costs so
strategy was to spend just enough
on drilling to develop a mine plan
sufficiently robust to finance and
return to cash generation ASAP.
11
TWO STAGE STRATEGY - 1. GENERATE CASH, 2. GROW
STAGE 2
✓ Focus on returning to cash
generation quickly limited drilling
to only 2 mineral lodes, Kavanagh
and Nugent.
Current Mine Plan
✓ These areas remain open at depth
and along strike.
✓ There are a further 7 areas which
were drilled and/or partially
mined as part of open pit.
✓ Focus now turns to expanding
mine life and annual throughput
by converting these areas.
12
STAGE 1 MINE PLAN
The mine plan and associated economics is based on the Economic Assessment released to the ASX on 27 February 2023. It does not include an update to the
Nugent Resource model reported to the ASX 26 July 2022 which increased the total copper metal from 8.7kt to 15kt as reported in the table above. It also does not
include drilling during 2023 and the identification of a fault in Kavanagh which truncates mineralisation to the north, both of which are expected to result in a material
change to the Mineral Resource Estimate and project economics in the Economic Assessment. The Production Target and financial forecasts presented in the
Economic Assessment are shown on a 100% Project basis. The Production Target underpinning the Base Case financial forecasts included in the Economic
Assessment comprises 74% Measured and Indicated Resources, and 26% Inferred Resources. There is a lower level of geological and grade continuity confidence
associated with Inferred Resources and there is no certainty that further exploration work will result in the conversion of Inferred Resource estimates to Indicated
13
Resource estimates or return the same grade and tonnage distribution.
UNDERGROUND PRODUCTION RAMPING UP
✓ All people & plant on site.
✓ Underground development in line
with planned schedule and costs.
✓ Major projects completed
(ventilation, electricity,
dewatering system).
✓ Production profile ramps up as
additional work areas open and
multiple stopes are mined
concurrently.
14
PROCESSING PLANT COMMISSIONED
✓ 3.6Mtpa processing plant
commissioned in Q1-24.
✓ Large inventory of critical spares
on site mitigates risk of extended
downtime.
✓ Long term electricity contract
locks in low-cost power until
2027.
15
FIRST COPPER PRODUCTION
✓ Copper sales in Q1-24 return
business to cash generation.
✓ 16kt hedging facility available.
Currently 3kt hedged at average
realised price of $12,500/ tonne.
✓ Copper production profile ramps
up as the underground develops.
16
STAGE 2 - GROWING LIFE & COPPER PRODUCTION
✓ Mine life limited by drilling
density.
✓ Exploration Target
60 - 100 Mt
0.9 - 1.2% Cu
0.1 - 0.2g/t Au
Refer ASX Announcement 11 October 2023.
The Exploration Target is conceptual in nature as
there has been insufficient exploration to define a
Mineral Resource. It is uncertain if further
exploration will result in the determination of a
Mineral Resource under the “Australasian Code for
Reporting of Exploration Results, Mineral Resources
and Ore Reserves, the JORC Code” (JORC 2012).
The Exploration Target is not being reported as part
of any Mineral Resource or Ore Reserve.
17
>100% EXPLORATION STRIKE RATE
✓ Mineralisation continuity down
dip has resulted in high strike
rate since 2019:
139 holes
163 intersections Cu-Au
✓ Drilling has resulted in >600%
increase in Mineral Resource
Estimate (MRE)
✓ >25,000 assays from drilling not
yet in the MRE (increasing from
16,481 assays to over 41,500
assays)
18
MINERAL RESOURCE ESTIMATE BEING UPDATED
✓ Update to include maiden MRE for
Emily Star & North Kavanagh, and
update existing Kavanagh MRE.
Current Mine Plan
✓ Total MRE expected to increase.
✓ Drilling identified a fault that
truncates Kavanagh mineralisation to
the north and is expected to reduce
the MRE in this area.
✓ Spitfire will partly offset, but net
reduction to Kavanagh MRE expected
which may materially impact planned
mining inventory.
✓ Reviewing Emily Star and North
Kavanagh as additional work areas.
19
MINE EXTENSION - KAVANAGH
✓ Mine plan limited by drilling.
✓ Deepest holes more than 200m
below the extent of the current
mine plan highlight that
mineralisation is continuing at
depth (800m below surface and
open).
✓ Recent Kavanagh holes include:
36.6m @ 3.35% Cu
.
from 43m downhole (23KVUG064).
40m @ 1.27% Cu
.
from 43m downhole (23KVUG072).
33.23m @ 1.46% Cu
.
from 42m downhole (23KVUG083).
20
Refer ASX Announcements 1 September 2021, 11 May 2022, 13 November 2023
MINE EXTENSION - SPITFIRE
✓ 45.4m @ 1.19% Cu, 0.12 g/t Au
from 428.5m downhole (KTDD243_W1).
✓ Nearest hole > 100m.
✓ Follow up drilling confirms Spitfire
zone extending down dip and
along strike.
✓ Spitfire being modelled in MRE
update, however drill results to
date have already warranted
moving the decline further north
to accommodate the growing
Spitfire mineral lode.
Refer ASX Announcement 28 August 2023
21
MINE EXTENSION - EMILY STAR
✓ Mineralisation continues through
base off the open pit.
✓ 71.7m @ 0.89% Cu
from 132.7m downhole (KTDD239)
✓ 68.7m @ 0.9% Cu
from 158.6m downhole (KTDD240), including;
✓ 35m @ 1.29% Cu
from 192.2m downhole
✓ Emily Star sits within 300m of the
portal, providing opportunity to
develop a separate work area.
✓ Maiden MRE being developed.
Refer ASX Announcement 3 July 2023
22
MINE EXTENSION - PARINGA
✓ 17m @ 3.6% Cu, 0.6g/t Au
from 144m downhole (KTRC954)
✓ 14m @ 2.8% Cu, 0.3g/t Au
from 123m downhole (KTRC866);
✓ Mineralisation occurring over
100m down dip and still open.
✓ Immediately adjacent to Emily
Star with potential to share
underground development
infrastructure.
Refer ASX Announcement 27 September 2019
23
GAME CHANGER - KANMANTOO DEEPS
✓ Large low resistivity (high
conductivity) anomaly coincident
with magnetic and gravity highs.
✓ Very similar geophysical signature
to the main Kanmantoo zone.
✓ Potential extension of the
Kanmantoo mineral system that
has been offset down fault.
✓ Within 400m of the underground
decline that is being developed.
Refer ASX Announcement 11 October 2023
24
SPARE CAPACITY TO RAMP UP COPPER PRODUCTION…
✓ 3.6Mtpa processing plant only
~40% utilised.
✓ Mineralised zones generally
characterised by high grade core
with lower grade halo.
✓ As price moves up, Hillgrove can
quickly respond by widening
stopes to present more ore to the
process plant that has ample
capacity to quickly convert to
copper and cash.
✓ Highly leveraged to copper price.
25
…AND CONVERT EXPLORATION SUCCESS
✓ Latent capacity enables Hillgrove
to convert exploration success to
copper with no processing capex.
✓ Increase in annual copper
production reduces AISC.
✓ Many operational costs are fixed
in nature so any additional copper
mined at incremental variable cost
has significant impact to cash
flow.
✓ Plant capacity > 30ktpa.
26
FIRST COPPER PRODUCTION IS JUST THE BEGINNING
✓ Transitioning from Explorer to
Producer on schedule and in line
with costs demonstrates
Hillgrove’s capability to deliver.
✓ Kanmantoo is limited by the
extent of drilling with all on-lease
mineral zones remaining open
down dip and along strike.
✓ Next Steps: increasing mine life
and annual throughput.
27
Appendix
28
INVESTMENT RISKS
Potential investors should be aware that there are risks associated with investing in Hillgrove. Certain risks are beyond the control of Hillgrove and its Directors
and Management and may have a material impact on Hillgrove's future operating and financial performance, and/or the financial position of Hillgrove, its prospects
and/or the value of the Shares. Some of the key risks associated with an investment in Hillgrove are described as follows.
•
In the event that Hillgrove undertakes a development project, then that development could be delayed or unsuccessful for a number
of reasons including extreme weather, unanticipated operational occurrences, failure to obtain necessary approvals, insufficient
funds, a drop-in commodity price, supply chain failure, unavailability of appropriate labour, or an increase in costs. If one or more of
these occurrences has a material impact, then Hillgrove's operational and financial performance may be negatively affected.
•
Adverse weather conditions events, unforeseen increases in establishment costs, mechanical failures, human errors, industrial
disputes or other unforeseen events, could lead to increased costs or delay to the Company's activities. The Company will mitigate
this risk by, amongst other things, taking out appropriate insurance in line with industry practice.
•
Commodity prices (in particular prices for copper and gold), concentrate treatment and recovery charges, exchange rates and other
economic variables, will have a material influence on the financial performance of the Company. It is impossible to predict future
commodity prices with confidence and the factors which impact it include, but are not limited to, global political situations, military
conflicts, technological changes, output controls and global consumption which are all outside the control of Hillgrove.
•
The enactment of new legislation or adoption of new requirements of a governmental authority may restrict or affect Hillgrove's ability
to:
o
conduct mining activities and exploit the Kanmantoo Copper Gold Deposit (or any other project / resource) efficiently and
effectively; or
o
sell product to particular consumers, which may affect the financial performance of the Company (e.g. the implementation of
sanction laws preventing the sale of product to consumers in certain countries).
•
There is a risk that community disappro
Share your feedback
Discover