Quarterly Activity Report and Appendix 5B for 30 September
Released
Released
Announcement PDF
QUARTERLY REPORT
Hillgrove Resources Limited (ASX: HGO) report for the quarter ended 30 September 2024
Operational delivery setting up Kanmantoo for future growth
September 2024 Operating Highlights:
•
•
•
•
•
Copper production of 2,923 metric tonnes (+13% Q-o-Q)
All-in costs of $US3.71 per pound (in-line with June 2024 quarter)
Mining rates continue to ramp up with total material mined of 279,723 tonnes (+33% Q-o-Q)
Mine development achieved of 1,401 metres (+13% Q-o-Q)
Processed tonnes of 266kt (+4% Q-o-Q)
Maiden Ore Reserve and 96% Increase in Copper Mineral Resource
On 18 October 2024 Hillgrove released an updated Mineral Resources and Ore Reserve Statement1.
Highlights:
• Kanmantoo 2024 Maiden Ore Reserve of 2.8Mt grading 0.91% Cu and 0.15g/t Au containing
26kt of copper and 14koz of gold.
• Kanmantoo 2024 Mineral Resources Estimate (MRE) of 19.3Mt grading 0.77% Cu and 0.14g/t
Au containing 150kt of copper and 82koz of gold.
• A 96% increase in contained copper and 138% increase in contained gold compared to
the 2022 MRE
• Maiden Mineral Resource Estimates for Emily Star and North Kavanagh
• Significant opportunities to grow Mineral Resources through extensional drilling
$10 Million Stand-by Debt Facility Secured
•
Provides additional financial flexibility as the Company scales up operations
CEO and Managing Director’s Statement
Commenting on the September 2024 quarter, Hillgrove CEO and Managing Director, Bob Fulker said:
“We continued to see significant operational improvements across all metrics post declaring
commercial production on 1 July 2024. While there are still many opportunities to improve
production rates and reduce costs as we move closer to steady state production, it is pleasing to
see the strong progress being made at Kanmantoo.
Last week’s announcement of a Maiden Ore Reserve and the nearly doubling of the contained
copper in the Mineral Resource at Kanmantoo highlights the scale of the opportunity we have in
front of us at this asset.”
1 ASX release on 18 October 2024 entitled “Maiden Kanmantoo Underground Ore Reserve and 96% increase in copper
Mineral Resource”
Page 1
Copper Production and All-In Costs
6000
6.88
5000
3.73
4000
3.71
3000
2,923
2,584
2000
1000
827
0
Mar Qtr 2024
Jun Qtr 2024
Copper Production (kt)
8
7
6
5
4
3
2
1
0
-1
-2
Sep Qtr 2024
AIC (US$/lb)
Figure 1: Kanmantoo quarterly production and costs
KANMANTOO UNDERGROUND OPERATIONS
The Kanmantoo Copper Mine is situated in the Adelaide Hills region of South Australia, just 55 kilometres
from Adelaide and only 3 kilometres from the main dual carriageway to Port Adelaide. This strategic
location offers significant advantages in both operating and capital costs, making it easier to attract and
retain a skilled workforce that primarily resides in the area.
Safety and Environment
The Total Recordable Injury Frequency (TRIF) for Hillgrove was 13.3 (June 2024 quarter: 12.0).
Hillgrove is pleased to report that the Company recently received the Chairman’s Award at the 2024
South Australian Mines and Emergency Response Competition (SAMERC). We are proud of our team’s
performance who have set a benchmark for excellence in mine emergency response. This award is a
positive reflection of Hillgrove’s strong safety culture.
Production and Costs
Kanmantoo produced 2,923 tonnes of copper in 12,656 dmt of concentrate at an All-In Cost of US$3.71
per pound of copper after by-product credits. Key physical metrics continued to improve – leading to a
13% increase in copper production (see Table 1 below).
C1 Costs and All-in Costs continued to decrease. All-In Sustaining Costs increased quarter on quarter
due to the declaration of commercial production on 1 July 2024 which led to some costs now being
allocated to sustaining capital which we previously allocated to major capital.
The main mining inventory sources for the quarter were from the Kavanagh 860 and 835 levels and the
Spitfire 835 level. Total ore mined for the quarter was 280kt – an increase of 69kt over the previous
quarter. Underground development focussed on the Kavanagh Decline 835, 810 and 785 levels along
with the Nugent incline. Total mine development for the quarter was 1,401m – an increase of 163m over
the previous quarter. The 1040 RL Nugent decline portal was also established during the quarter.
Page 2
Opening up new areas in Nugent will improve flexibility in accessing mining stocks and ultimately lift
mining rates.
The processing plant performed well, with continued operational improvements during the quarter. This
led to an increase in all key processing metrics, including milled tonnes, feed grade, and recoveries.
Table 1 below highlights the key mining, processing and cost metrics for the operation.
Table 1: Kanmantoo quarterly production and cost summary
Kanmantoo Production
and Cost Metrics
Mining Physicals
Total Development
Inventory Mined
Grade Mined
Processing Physicals
Tonnes Processed
Grade Processed
Recoveries
Production
Copper Produced
Gold Produced
Silver Produced
Cost Summary
Mining
Processing
Site G&A
Transport and Offtake Charges
Inventory Movements
By-Product Credits
C1 Cash Cost
Government Royalties
Sustaining Capital
All In Sustaining Cost
Major Capital1
All In Cost
Units
Sep 2024
Quarter
Jun 2024
Quarter
Mar 2024
Quarter
m
kt
%
1,401
280
1.20
1,238
211
1.24
1,405
122
0.82
kt
%
%
266
1.18
93.3
256
1.10
91.4
104
0.93
82.7
t
oz
oz
2,923
626
26,372
2,584
535
23,377
827
162
5,810
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
1.08
0.61
0.19
0.39
0.06
(0.32)
2.01
0.19
1.27
3.46
0.25
3.71
1.18
0.59
0.14
0.36
0.13
(0.24)
2.16
0.17
0.00
2.33
1.40
3.73
2.56
1.62
0.43
0.32
(0.92)
(0.24)
3.77
0.19
0.00
3.96
2.92
6.88
1
Major Capital includes a portion of underground mine development capital as well as surface infrastructure capital.
AUD/USD conversion rate of 0.67 used.
Page 3
HILLGROVE RESOURCES
Financials
Net revenue from metal sales in the September quarter was $36.9 million. At the end of the quarter,
Hillgrove had cash, receivables, and unsold concentrate of $12.2 million.
Table 2: Company Liquidity
Unaudited (A$M)
Cash
Receivables
Unsold Concentrate
TOTAL
Sep 2024
Quarter
7.8
2.2
2.2
Jun 2024
Quarter
7.4
3.5
4.4
Mar 2024
Quarter
7.4
2.6
1.7
12.2
15.3
11.7
Cash flow was impacted by the timing of campaign milling with approximately 20,000 tonnes of ore sitting
on ROM pads at quarter end. There was also an increase in sustaining capital during the quarter which
included:
•
•
•
a 53% increase in the underground diamond drilling program focused on ore definition,
Tails Storage Facility (TSF) lift 7 construction works, and
commencement of the Nugent Portal and decline to allow access to additional mining fronts.
With the improved developed and drilled stoping stocks, an increase in tonnes available to be processed
on 1 October 2024 and the capital works that were undertaken in the September 2024 quarter,
Kanmantoo is set up well for delivery in the December 2024 Quarter and beyond.
During the September quarter, the Company invested $0.3 million in exploration and $13.8 million in mine
development.
The Company paid executive director salaries and non-executive director fees of $253,000 during the
quarter.
On 30 September 2024, the Company had 7,900 tonnes of hedging outstanding at a weighted average
price of A$14,056 per tonne scheduled for delivery between January 2025 and September 2026.
Page 4
KANMANTOO EXPLORATION
Mine Lease Exploration
The copper exploration targets on the Kanmantoo mining lease remain extensive and include:
•
•
•
•
along strike and down-dip extensions of the main Kavanagh and Nugent Cu-Au Mineral
Resources,
the Emily Star down dip extension,
Valentine and Paringa, and
the Coopers and North Kavanagh deposits north of the Kavanagh underground development.
These are classified as the North and South copper hubs.
The focus during the September quarter has been grade control definition drilling and resource drilling at
Kavanagh and Spitfire. The Nugent incline has continued to progress with drilling from the first
underground drilling platform to occur early in the December quarter targeting Nugent. Drilling the Nugent
lode from underground will provide an improved drill angle and easier depth extension in comparison to
surface drilling.
Kavanagh Mineral Resource Drilling
From 1 July to 30 September 2024, the Company drilled a further 70 holes from underground achieving
11,960m of drilling within the Kavanagh-Spitfire mineral system. A second underground diamond drill rig
was mobilised to site at the end of July. Underground diamond drilling has continued to map the grade
continuity of the main Kavanagh-Spitfire mineral system and has continued to extend the continuity of the
Spitfire and South West (SW) Kavanagh mineral systems within the underground mining footprint.
An update to the Mineral Resource Estimate was released on 18 of October 2024 titled “Maiden
Kanmantoo Underground Ore Reserve and 96% increase in copper Mineral Resource”. This incorporated
all underground drilling through to 14 July 2024. Further information is available on the Hillgrove
Resources website at www.hillgroveresources.com.au
Drilling since July continues to extend the Spitfire South West (SW) Kavanagh mineral systems which
will be incorporated into future Mineral Resource Estimates.
Kanmantoo Geophysical Anomaly
During the quarter, drilling was completed on the geophysical anomaly approximately 400 metres north
and 600 metres beneath the northern extension of the Kanmantoo open pit. Drilling to date has identified
that the mineralisation observed is consistent with the down plunge extents of North Kavanagh.
Drilling elsewhere within the footprint of the interpreted geophysical structure has intersected alteration
consistent with the Magnetotelluric (MT) survey response however there is an absence of mineralised
veining. The distribution of alteration and the lithologies observed in drilling is consistent with the wider
Kanmantoo Deposit.
Assay results from drilling of the MT Geophyiscal anomaly include:
• 2m @ 0.83% Cu and 0.06g/t Au downhole from 332m in KTDD246,
• 1m @ 1.05% Cu and 0.21g/t Au downhole from 343.5m in KTDD246,
Page 5
•
•
11.7m @ 0.77% Cu and 0.08g/t Au downhole from 250.8m in KTDD247, and
2.5m @ 0.84% Cu and 0.44g/t Au downhole from 434m in KTDD247.
These drilling results have not been included within the MRE released 18 October 2024.
Further interperation of these drill results, including the elevated Au results and alteration observed, is
ongoing.
Figure 2: Longitudinal section viewed to the West of exploration drilling targeting a
geophysical anomaly. Inset: collar locations relative to existing drilling information
Near Mine Exploration
The Cu-Au targets within 10 kilometres of the Kanmantoo processing plant include the South Kanmantoo,
Stella, Mullewa and North West Kanmantoo geochemical and geophysical targets. There was no work
undertaken on these prospects in the September 2024 quarter.
REGIONAL EXPLORATION
The regional area comprises 4,187 km2 of exploration licences within the Kanmantoo Province in the
south-east of South Australia. During the quarter, 25% (1,465km2) of the south-east tenements were
relinquished in areas identified as low value targets. The work plan for the coming two years will assess
a further 4 targets areas with the aim of narrowing the focus of the exploration field into high value
potential economic areas of interest.
Page 6
Figure 3: Updated Hillgrove Tenement Areas (relinquished areas illustrated by diagonal red
line fill)
The Kanmantoo Province is now being investigated by the Geological Survey of South Australia (GSSA)
and MINEX-CRC for its magmatic related copper-gold endowment as a consequence of the discoveries
on the Stavely Belt in western Victoria. Geological work by the GSSA has concluded that copper
mineralisation within the Kanmantoo Province occurs over four distinct periods from onset of the
Delamerian Orogen (early Cambrian) to the close of the Benambran Orogen (mid-Ordovician – the same
orogen that resulted in the Macquarie Arc Cu-Au mineralisation of Cadia-Ridgeway renown). This opens
up the window of prospectivity of the Kanmantoo Province and in particular the tenement holding of
Hillgrove for significant Cu-Au mineralisation.
Continued interpretation of new mineral system models operating within the Kanmantoo Province along
with a review of existing data has been a focus for Hillgrove’s regional exploration activities.
Page 7
Competent Persons Statement
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources
is based on information compiled by Caitlin Rowett, a Competent Person who is a Member of The
Australasian Institute of Mining and Metallurgy. Caitlin Rowett is a full-time employee of the company.
Caitlin Rowett has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Caitlin Rowett has consented to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate were initially
reported by the Company to the ASX on the 18th of October 2024. Further information is available on the
Hillgrove Resources website at www.hillgroveresources.com.au
The company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have
not materially changed. The company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market
announcement.
Page 8
CORPORATE INFORMATION
Issued Share Capital at 30 September 2024
Ordinary shares
Unlisted Options
Employee Performance Rights
Share price activity for the Quarter
High
Low
Last (30 September 2024)
2,095,555,567
66,000,000
43,525,000
0.075
0.047
0.065
SHARE REGISTRY
REGISTERED OFFICE
Boardroom Limited
GPO Box 3993
Sydney NSW 2001, Australia
F: +61 2 9279 0664
T: (within Australia) 1300 737 760
T: (outside Australia) +61 2 9290 9600
Hillgrove Resources Limited
Ground Floor
5-7 King William Road
Unley, South Australia, Australia
E: info@hillgroveresources.com.au
T: +61 8 7070 1698
For more information contact:
Mr Bob Fulker
CEO & Managing Director
Tel: +61 (0)8 7070 1698
Mr Joe Sutanto
CFO & Company Secretary
Tel: +61 (0)8 7070 1698
SCHEDULE OF TENEMENTS AS AT 30 SEPTEMBER 2024
Tenement
Location
Percentage
ML 6345
Kanmantoo, South Australia
100%
ML 6436
Kanmantoo, South Australia
100%
EML 6340
Kanmantoo, South Australia
100%
EL 6526
Kanmantoo, South Australia
100%
EL 6174
Coomandook, South Australia
100%
EL 6175
Coonalpyn, South Australia
100%
EL 6207
Tintinara, South Australia
100%
EL 6294
Wynarka, South Australia
100%
EL 6397
Laffer, South Australia
100%
Page 9
APPENDIX A: List of all drill intercepts in this report
Intercepts in the table below are amalgamated over a minimum down hole length of 1m > 0.4% Cu with
a maximum of 5m internal dilution < 0.4% Cu. Or a minimum down hole length of 1m > 0.5g/t Au with a
maximum of 1m internal dilution < 0.5g/t Au. No assays were cut before amalgamating the intercept
calculation.
Hole ID
Ore Zone
Target
KTDD246
MT Target
KTDD246
MT Target
KTDD246
MT Target
KTDD246_W1
MT Target
KTDD246_W2
MT Target
KTDD246_W3
MT Target
KTDD247
MT Target
KTDD247
MT Target
KTDD247
MT Target
KTDD247
MT Target
KTDD247
MT Target
Assay Method
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
4-Acid/ICPMS
Depth
From
Depth
To
Interval
Length
Cu%
Au
g/t
Ag
g/t
332
334
2
0.83
0.06
3.26
343.5
344.5
1
1.05
0.21
1.54
723
724.6
1.6
0.07
0.53
0.54
0
0.37
0.14
NSI
675
677
2
NSI
6.5
10
3.5
0.06
0.55
0.32
250.8
262.5
11.7
0.77
0.08
3.32
429
430
1
0.13
0.52
1.24
434
436.5
2.5
0.84
0.44
2.02
540
541
1
0.09
0.84
0.68
APPENDIX B: List of all Drill Collar details
HOLE_ID
SITE_TYPE
MAX_DEPTH
SURVEY_METHOD
NAT_GRID_ID
EASTING
NORTHING
HEIGHT
KTDD246
DDH
1116.78
DGPS
MGA94_54
318651.919
6115446.092
1170.622
KTDD246_W1
DDH
1080.4
DGPS
MGA94_54
318651.919
6115446.092
1170.622
KTDD246_W2
DDH
1054.6
DGPS
MGA94_54
318651.919
6115446.092
1170.622
KTDD246_W3
DDH
1061.5
DGPS
MGA94_54
318651.919
6115446.092
1170.622
KTDD247
DDH
699.7
DGPS
MGA94_54
318650.5
6115444
1170.672
Page 10
APPENDIX C: List of all Drill Survey Details
HOLE_ID
DEPTH AZIMUTH
KTDD246
0
247.78
KTDD246
15
247.78
KTDD246
27
249.27
KTDD246
39
251.41
KTDD246
45
250.84
KTDD246
57
249.76
KTDD246
69
252.98
KTDD246
81
255.56
KTDD246
93
256.36
KTDD246
105
257.57
KTDD246
111
256.85
KTDD246
123
259.75
KTDD246
135
259.91
KTDD246
148
261.84
KTDD246
160
261.9
KTDD246
172
262.5
KTDD246
184
263.95
KTDD246
196
263.77
KTDD246
211
264.11
KTDD246
220
265.53
KTDD246
232
263.81
KTDD246
244
265.03
KTDD246
256
265.59
KTDD246
268
265.63
KTDD246
274
266.26
KTDD246
286
265.95
KTDD246
298
266.22
KTDD246
310
265.22
KTDD246
322
265.7
KTDD246
328
266.52
KTDD246
334
267.4
KTDD246
340
266.09
KTDD246
370
267.19
KTDD246
382
268.07
KTDD246
394
267.54
KTDD246
406
268.05
KTDD246
418
269
KTDD246
433
267.42
KTDD246
445
266.82
KTDD246
457
267.69
KTDD246
469
267.5
KTDD246
481
267.13
KTDD246
493
268.74
KTDD246
502
268.64
KTDD246
514
269.12
KTDD246
526
270.22
KTDD246
538
269.53
KTDD246
550
268.92
KTDD246
565
269.51
KTDD246
579
264.9
KTDD246
585
265.35
KTDD246
591
265.17
KTDD246
597
265.18
KTDD246
609
265.1
KTDD246
621
266.14
KTDD246
633
266.48
KTDD246
645
267.82
KTDD246
657
266.84
KTDD246
669
267.14
KTDD246
681
268.12
KTDD246
693
268.19
KTDD246
705
269.21
KTDD246
717
268.73
KTDD246
729
269.41
KTDD246
741
270
KTDD246
753
269.57
KTDD246
765
269.26
KTDD246
777
269.16
KTDD246
789
269.99
KTDD246
801
270.55
KTDD246
813
268.75
KTDD246
825
271.23
KTDD246
837
271.94
KTDD246
849
272.65
KTDD246
861
273.19
KTDD246
873
273.31
KTDD246
885
274.03
KTDD246
897
273.92
KTDD246
909
274.42
KTDD246
921
273.68
KTDD246
933
275.38
KTDD246
945
275.64
KTDD246
957
273.48
KTDD246
975
276.22
KTDD246
995
275.28
KTDD246
1011
275.99
KTDD246
1024
276.51
KTDD246
1042
277.31
KTDD246
1068
277.99
KTDD246
1081
278.4
KTDD246
1099
279.02
KTDD246_W1
0
247.78
KTDD246_W1
15
247.78
KTDD246_W1
27
249.27
KTDD246_W1
39
251.41
KTDD246_W1
45
250.84
KTDD246_W1
57
249.76
KTDD246_W1
69
252.98
KTDD246_W1
81
255.56
KTDD246_W1
93
256.36
KTDD246_W1
105
257.57
KTDD246_W1
111
256.85
KTDD246_W1
123
259.75
KTDD246_W1
135
259.91
KTDD246_W1
148
261.84
KTDD246_W1
160
261.9
KTDD246_W1
172
262.5
DIP
-85.72
-85.72
-85.34
-84.73
-84.49
-84.02
-83.44
-82.8
-82.05
-81.58
-81.28
-80.61
-80.05
-79.31
-78.65
-78.05
-77.42
-77.07
-76.61
-76.05
-75.14
-74.04
-73.16
-72.95
-72.79
-72.5
-72.27
-72.08
-71.91
-71.92
-71.91
-71.94
-71.69
-71.68
-71.64
-71.62
-71.49
-71.28
-71.16
-70.96
-70.91
-70.8
-70.58
-70.57
-70.22
-70.04
-69.86
-69.64
-69.38
-67.29
-66.16
-65.82
-65.62
-65.18
-64.62
-64.11
-63.86
-63.75
-63.31
-62.9
-62.42
-62.21
-61.83
-61.41
-61.21
-61.07
-60.8
-60.64
-60.42
-60.3
-60.07
-59.63
-59.31
-59.05
-58.75
-58.52
-58.52
-57.84
-57.58
-57.25
-56.9
-56.5
-56.06
-55.44
-55.06
-54.58
-54.26
-53.86
-53.28
-53.1
-52.727
-85.72
-85.72
-85.34
-84.73
-84.49
-84.02
-83.44
-82.8
-82.05
-81.58
-81.28
-80.61
-80.05
-79.31
-78.65
-78.05
HOLE_ID
DEPTH AZIMUTH
KTDD246_W1
184
263.95
KTDD246_W1
196
263.77
KTDD246_W1
211
264.11
KTDD246_W1
220
265.53
KTDD246_W1
232
263.81
KTDD246_W1
244
265.03
KTDD246_W1
256
265.59
KTDD246_W1
268
265.63
KTDD246_W1
274
266.26
KTDD246_W1
286
265.95
KTDD246_W1
298
266.22
KTDD246_W1
310
265.22
KTDD246_W1
322
265.7
KTDD246_W1
328
266.52
KTDD246_W1
334
267.4
KTDD246_W1
340
266.09
KTDD246_W1
346
266.44
KTDD246_W1
358
266.39
KTDD246_W1
370
267.19
KTDD246_W1
382
268.07
KTDD246_W1
394
267.54
KTDD246_W1
406
268.05
KTDD246_W1
418
269
KTDD246_W1
433
267.42
KTDD246_W1
445
266.82
KTDD246_W1
457
267.69
KTDD246_W1
469
267.5
KTDD246_W1
481
267.13
KTDD246_W1
493
268.74
KTDD246_W1
502
268.64
KTDD246_W1
526
260.22
KTDD246_W1
537
257.01
KTDD246_W1
546
258.42
KTDD246_W1
558
259.85
KTDD246_W1
570
259.34
KTDD246_W1
582
260.09
KTDD246_W1
594
260.53
KTDD246_W1
606
261.31
KTDD246_W1
618
261.16
KTDD246_W1
630
261.34
KTDD246_W1
648
262.08
KTDD246_W1
672
264.84
KTDD246_W1
682
266.39
KTDD246_W1
693
268.42
KTDD246_W1
704
269.18
KTDD246_W1
716
270.76
KTDD246_W1
728
271.09
KTDD246_W1
742
273.09
KTDD246_W1
760
273.62
KTDD246_W1
772
274.69
KTDD246_W1
784
274.57
KTDD246_W1
796
276.63
KTDD246_W1
808
276.34
KTDD246_W1
817
277.57
KTDD246_W1
829
277.25
KTDD246_W1
841
279.22
KTDD246_W1
853
280
KTDD246_W1
865
280.52
KTDD246_W1
877
280.89
KTDD246_W1
889
281.57
KTDD246_W1
901
281.53
KTDD246_W1
915
282.25
KTDD246_W1
931
282.27
KTDD246_W1
945
284.41
KTDD246_W1
963
285.81
KTDD246_W1
984
286.28
KTDD246_W1
1002
287.04
KTDD246_W1
1014
288.13
KTDD246_W1
1026
288.11
KTDD246_W1
1040
288.28
KTDD246_W1
1052
289.64
KTDD246_W1
1064
289.81
KTDD246_W1
1075
291.1
KTDD246_W2
0
247.78
KTDD246_W2
15
247.78
KTDD246_W2
27
249.27
KTDD246_W2
39
251.41
KTDD246_W2
45
250.84
KTDD246_W2
57
249.76
KTDD246_W2
69
252.98
KTDD246_W2
81
255.56
KTDD246_W2
93
256.36
KTDD246_W2
105
257.57
KTDD246_W2
111
256.85
KTDD246_W2
123
259.75
KTDD246_W2
135
259.91
KTDD246_W2
148
261.84
KTDD246_W2
160
261.9
KTDD246_W2
172
262.5
KTDD246_W2
184
263.95
KTDD246_W2
196
263.77
KTDD246_W2
211
264.11
KTDD246_W2
220
265.53
KTDD246_W2
232
263.81
KTDD246_W2
244
265.03
KTDD246_W2
256
265.59
KTDD246_W2
268
265.63
KTDD246_W2
274
266.26
KTDD246_W2
286
265.95
KTDD246_W2
298
266.22
KTDD246_W2
310
265.22
KTDD246_W2
322
265.7
KTDD246_W2
328
266.52
KTDD246_W2
334
267.4
KTDD246_W2
340
266.09
KTDD246_W2
346
266.44
KTDD246_W2
358
266.39
DIP
-77.42
-77.07
-76.61
-76.05
-75.14
-74.04
-73.16
-72.95
-72.79
-72.5
-72.27
-72.08
-71.91
-71.92
-71.91
-71.94
-71.85
-71.85
-71.69
-71.68
-71.64
-71.62
-71.49
-71.28
-71.16
-70.96
-70.91
-70.8
-70.58
-70.57
-74.98
-76.96
-76.91
-76.54
-76.11
-75.94
-75.76
-75.67
-75.43
-75.28
-75.2
-73.29
-72.76
-71.7
-71.27
-70.55
-70.06
-69.55
-69.02
-68.64
-68.3
-68.15
-68.06
-67.96
-67.7
-67.35
-66.97
-66.86
-66.64
-66.36
-66.31
-66.06
-65.76
-65.28
-64.95
-64.48
-64.15
-64.14
-64.04
-63.73
-63.52
-63.32
-63.32
-85.72
-85.72
-85.34
-84.73
-84.49
-84.02
-83.44
-82.8
-82.05
-81.58
-81.28
-80.61
-80.05
-79.31
-78.65
-78.05
-77.42
-77.07
-76.61
-76.05
-75.14
-74.04
-73.16
-72.95
-72.79
-72.5
-72.27
-72.08
-71.91
-71.92
-71.91
-71.94
-71.85
-71.85
HOLE_ID
DEPTH AZIMUTH
KTDD246_W2
370
267.19
KTDD246_W2
382
268.07
KTDD246_W2
394
267.54
KTDD246_W2
406
268.05
KTDD246_W2
418
269
KTDD246_W2
433
267.42
KTDD246_W2
445
266.82
KTDD246_W2
457
267.69
KTDD246_W2
469
267.5
KTDD246_W2
481
267.13
KTDD246_W2
493
268.74
KTDD246_W2
508
273.1
KTDD246_W2
555
298.81
KTDD246_W2
567
298.23
KTDD246_W2
582
298.13
KTDD246_W2
597
297.44
KTDD246_W2
609
296.71
KTDD246_W2
621
301.41
KTDD246_W2
633
300.4
KTDD246_W2
649
302.97
KTDD246_W2
652
305.99
KTDD246_W2
664
306.67
KTDD246_W2
670
305.27
KTDD246_W2
673
305.12
KTDD246_W2
676
304.05
KTDD246_W2
688
304.73
KTDD246_W2
700
305.52
KTDD246_W2
712
303.84
KTDD246_W2
718
302.92
KTDD246_W2
724
303.81
KTDD246_W2
730
303.45
KTDD246_W2
748
302.98
KTDD246_W2
760
301.47
KTDD246_W2
799
302.85
KTDD246_W2
811
302.72
KTDD246_W2
823
302.27
KTDD246_W2
835
303.02
KTDD246_W2
847
303.37
KTDD246_W2
859
304.62
KTDD246_W2
871
304.89
KTDD246_W2
883
304.88
KTDD246_W2
895
304.88
KTDD246_W2
907
305.67
KTDD246_W2
919
306.47
KTDD246_W2
931
305.57
KTDD246_W2
949
307.31
KTDD246_W2
961
307.39
KTDD246_W2
973
306.67
KTDD246_W2
985
307.08
KTDD246_W2
1003
307.51
KTDD246_W2
1015
307.72
KTDD246_W2
1027
308.78
KTDD246_W2
1039
309.09
KTDD246_W3
0
247.78
KTDD246_W3
15
247.78
KTDD246_W3
27
249.27
KTDD246_W3
39
251.41
KTDD246_W3
45
250.84
KTDD246_W3
57
249.76
KTDD246_W3
69
252.98
KTDD246_W3
81
255.56
KTDD246_W3
93
256.36
KTDD246_W3
105
257.57
KTDD246_W3
111
256.85
KTDD246_W3
123
259.75
KTDD246_W3
135
259.91
KTDD246_W3
148
261.84
KTDD246_W3
160
261.9
KTDD246_W3
172
262.5
KTDD246_W3
184
263.95
KTDD246_W3
196
263.77
KTDD246_W3
211
264.11
KTDD246_W3
220
265.53
KTDD246_W3
232
263.81
KTDD246_W3
244
265.03
KTDD246_W3
256
265.59
KTDD246_W3
268
265.63
KTDD246_W3
274
266.26
KTDD246_W3
286
265.95
KTDD246_W3
298
266.22
KTDD246_W3
310
265.22
KTDD246_W3
322
265.7
KTDD246_W3
328
266.52
KTDD246_W3
334
267.4
KTDD246_W3
340
266.09
KTDD246_W3
346
266.44
KTDD246_W3
358
266.39
KTDD246_W3
370
267.19
KTDD246_W3
382
268.07
KTDD246_W3
394
267.54
KTDD246_W3
406
268.05
KTDD246_W3
428
266.52
KTDD246_W3
469
256.34
KTDD246_W3
474
255.04
KTDD246_W3
484
252.43
KTDD246_W3
487
252.49
KTDD246_W3
498
252.74
KTDD246_W3
510
253.24
KTDD246_W3
522
254.01
KTDD246_W3
534
254.06
KTDD246_W3
546
255.8
KTDD246_W3
558
256.16
KTDD246_W3
570
256.63
KTDD246_W3
582
257.16
KTDD246_W3
594
258.31
KTDD246_W3
606
259.17
KTDD246_W3
634
258.05
DIP
-71.69
-71.68
-71.64
-71.62
-71.49
-71.28
-71.16
-70.96
-70.91
-70.8
-70.58
-70.74
-78.89
-78.36
-78.1
-77.79
-77.28
-75.09
-74.73
-74.72
-74.25
-72.32
-70.9
-70.89
-69.95
-69.52
-68.76
-67.91
-67.42
-67.95
-66.64
-65.57
-64.82
-63.25
-62.78
-62.27
-61.97
-61.47
-61
-60.39
-60.14
-59.83
-59.49
-58.92
-58.64
-57.9
-57.6
-57.23
-56.82
-56.12
-55.75
-55.34
-54.51
-85.72
-85.72
-85.34
-84.73
-84.49
-84.02
-83.44
-82.8
-82.05
-81.58
-81.28
-80.61
-80.05
-79.31
-78.65
-78.05
-77.42
-77.07
-76.61
-76.05
-75.14
-74.04
-73.16
-72.95
-72.79
-72.5
-72.27
-72.08
-71.91
-71.92
-71.91
-71.94
-71.85
-71.85
-71.69
-71.68
-71.64
-71.62
-69.7
-66.43
-65.76
-64.5
-64.33
-64.08
-63.69
-63.39
-62.88
-62.33
-61.81
-61.43
-60.73
-60.18
-59.78
-58.73
HOLE_ID
DEPTH AZIMUTH
KTDD246_W3
640
255.04
KTDD246_W3
647
256.24
KTDD246_W3
654
256.97
KTDD246_W3
666
258.27
KTDD246_W3
678
258.81
KTDD246_W3
690
260.41
KTDD246_W3
702
261.18
KTDD246_W3
714
262.1
KTDD246_W3
726
262.92
KTDD246_W3
738
262.79
KTDD246_W3
750
264.06
KTDD246_W3
762
265.14
KTDD246_W3
774
266.53
KTDD246_W3
780
267.53
KTDD246_W3
792
269.37
KTDD246_W3
804
269.08
KTDD246_W3
816
271.07
KTDD246_W3
828
270.95
KTDD246_W3
840
270.86
KTDD246_W3
852
272.17
KTDD246_W3
864
271.48
KTDD246_W3
876
271.99
KTDD246_W3
888
273.53
KTDD246_W3
900
273.79
KTDD246_W3
918
273.83
KTDD246_W3
930
275.02
KTDD246_W3
942
274.55
KTDD246_W3
954
274.44
KTDD246_W3
966
276.19
KTDD246_W3
978
276.05
KTDD246_W3
990
276.39
KTDD246_W3
1002
276.05
KTDD246_W3
1014
277.44
KTDD246_W3
1026
278.67
KTDD246_W3
1038
278.64
KTDD246_W3
1050
279.07
KTDD247
0
273.83
KTDD247
6
273.83
KTDD247
12
273.51
KTDD247
24
273.41
KTDD247
30
273.25
KTDD247
42
273.56
KTDD247
54
273.27
KTDD247
66
273.03
KTDD247
78
273.76
KTDD247
90
274.66
KTDD247
102
274.67
KTDD247
114
273.78
KTDD247
126
273.06
KTDD247
138
273.49
KTDD247
150
273.08
KTDD247
165
273.84
KTDD247
177
273.2
KTDD247
189
273.14
KTDD247
201
273.54
KTDD247
213
273.55
KTDD247
225
273.9
KTDD247
237
274.97
KTDD247
249
274.2
KTDD247
261
273.39
KTDD247
273
273.25
KTDD247
285
274.6
KTDD247
297
274.42
KTDD247
309
273.35
KTDD247
321
273.02
KTDD247
333
273.33
KTDD247
345
273.85
KTDD247
357
273.5
KTDD247
369
273.31
KTDD247
381
273.23
KTDD247
393
273.47
KTDD247
405
274.72
KTDD247
417
274.44
KTDD247
429
276.7
KTDD247
453
275.3
KTDD247
465
277.82
KTDD247
477
276.68
KTDD247
489
278.17
KTDD247
501
276.88
KTDD247
513
277.3
KTDD247
525
277.67
KTDD247
537
276.79
KTDD247
549
277.64
KTDD247
561
277.53
KTDD247
573
277.66
KTDD247
585
277.53
KTDD247
597
277.42
KTDD247
609
277.86
KTDD247
621
277.65
KTDD247
633
278
KTDD247
645
277.36
KTDD247
657
277.2
KTDD247
669
278.85
KTDD247
681
277.17
KTDD247
693
277.06
Page 11
DIP
-58.06
-57.74
-57.12
-56.09
-55.16
-54.55
-53.78
-53.13
-53.05
-52.47
-51.78
-50.25
-48.77
-48.2
-47.03
-45.96
-44.96
-43.77
-42.73
-42.37
-41.72
-41.06
-40.62
-40.05
-39.42
-39.12
-38.61
-38.31
-37.98
-37.58
-37.36
-37.11
-36.8
-36.57
-36.42
-36.28
-65.57
-65.57
-65.19
-64.96
-64.57
-63.87
-63.58
-63.3
-63.04
-62.47
-62.28
-61.71
-61.44
-61.53
-61.14
-60.09
-59.22
-58.46
-57.9
-57.3
-56.6
-55.82
-55.28
-54.77
-54.32
-53.88
-53.44
-52.82
-52.02
-50.99
-50.26
-49.91
-49.54
-49.05
-48.1
-47
-45.72
-44.24
-41.29
-39.8
-38.31
-37.73
-37.46
-37.11
-36.82
-36.5
-36.25
-36.04
-35.8
-35.48
-35.32
-35.17
-34.95
-34.78
-34.59
-34.39
-34.22
-34.03
-33.73
APPENDIX C: JORC (2012) Table 1
Section 1 Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
• The Diamond Drill Hole (DDH) sampling was conducted as per the Hillgrove
Resources procedures and QAQC protocols.
• Sample intervals from 1.0m to 0.30m as determined by geology through visibly
mineralised zones were split from the drill core, with the drill core sawn in half with
a diamond core saw.
• Samples were prepared by ALS Adelaide with each sample being wholly pulverised
to >85% passing <75µm.
Drilling
techniques
• All drilling undertaken by external drilling contractor, DRC Drilling. Using HQ for
collars to a maximum of 507m downhole and NQ drilling thereafter for all drilling
holes. NQ Core size is 47.6mm in diameter.
Drill sample
recovery
• Recovered drill core metres were measured and compared to length of drill hole
advance to calculate core recovery for every core run. On average sample recovery
is >98%. There is no correlation between sample recovery and copper grades in this
DDH drill program.
Logging
• All drill core was logged for lithology, alteration, weathering and mineralisation by
Hillgrove geologists in accordance with Hillgrove’s Core Logging Procedure. Colour
and any additional qualitative comments were also recorded.
• High
Share your feedback
Discover