2 September 2026
PRESENTATION – COPPER TO THE WORLD CONFERENCE
Kantra Copper Limited (formerly Hillgrove Resources Limited, Kantra or Company) (ASX:KAN) is pleased to enclose a
copy of the presentation to be delivered by Kantra’s CEO & Managing Director, Bob Fulker, at the Copper to the World
Conference taking place from Wednesday, 2 September to Thursday, 3 September 2026.
Authorised for release by the Board of Kantra Copper Limited.
For more information contact:
Mr Bob Fulker Mr Luke Anderson
Chief Executive Officer & Managing Director Chief Financial Officer & Joint Company Secretary
T: +61 (0)8 7070 1698 T: +61 (0)8 7070 1698
Ms Jane Brunton
Head of Investor Relations & Growth
T: +61 (0)8 7070 1698
E: info@kantra.com
A Growing Australian
Copper Producer
Copper to the World
September 2026
Bob Fulker
Chief Executive Officer & Managing Director
(Formerly Hillgrove Resources Limited)
Disclaimer
To the maximum extent permitted by law, neither Kantra nor its related corporations, directors, officers, employees or agents, nor any other person, accepts any liability, including, without limitation,
any liability arising from fault or negligence, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Kantra is under no obligation to release any updates or
revisions to this presentation to reflect any change in expectation or assumptions and disclaim all responsibility and liability for these forward-looking statements (including, without limitation, liability for fraud or negligence).
Nothing contained in this Document constitutes investment, legal, tax or other advice. The information in this Document does not take into account the investment objectives, financial situation or particular needs of any recipient. Before making an
investment decision, each recipient of this Document should make its own assessment and take independent professional advice in relation to this Document and any action taken on the basis of this Document. All currency referred to is Australian
dollars ($) unless otherwise indicated (e.g. US$).
Forward Looking Statement
This presentation contains or may contain certain forward-looking statements and comments about future events, that are based on Kantra's beliefs, assumptions and expectations and on information currently available to management as at the
date of this presentation. Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and "guidance", or similar
expressions, and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production potential, financial forecasts, product quality estimates of future Mineral Resources and
Ore Reserves. Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values, results or performance achievements to differ materially from those expressed or implied in this
announcement. Where Kantra expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a reasonable basis. No representation or warranty, express or implied, is made by
Kantra that the matters stated in this presentation will in fact be achieved or prove to be correct. Except as required by law, Kantra undertakes no obligation to provide any additional or updated information or update any forward-looking statements
whether as a result of new information, future events, results or otherwise. Readers are cautioned against placing undue reliance on forward-looking statements. These forward-looking statements are not guarantees of future performance and
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of Kantra, the directors, and management of Kantra. These factors include, but are not limited to difficulties in
forecasting expected production quantities, the potential that any of Kantra's projects may experience technical, geological, metallurgical and mechanical problems, changes in market prices and other risks not anticipated by Kantra, changes in
exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously underestimated technical challenges, increased costs, and
demand for production inputs.
Competent Persons Statement
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Kantra is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX. Investors should note
that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the
JORC Code).
The information in this report that relates to the 2025 Kanmantoo Mineral Resource Estimate and the 2025 Ore Reserve is extracted from ASX release titled ‘Hillgrove Resources Delivers Ore Reserve Extension at 1.0%CuEq’ dated 30 October 2025 and is
available to view at www.kantra.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical
parameters underpinning the Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's
findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate is extracted from ASX release titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment” dated 18
October 2024 and is available to view at www.kantra.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Person's findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to planned drilling opportunities was extracted from the ASX release titled ‘2026 Kanmantoo Exploration Update’ previously released on the 11 Dec 2025 and “Exploration Target Defined for Kanappa Drilling
Program” released on the 16 April 2026 and is available to view at www.kantra.com. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and
that all material assumptions and technical parameters underpinning the information in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
The information in this report that relates to exploration drilling results was extracted from the ASX release titled ‘High-grade Intersects Extend Spitfire Mineralisation’ previously released on the 27 August 2026 and is available to view at
www.kantra.com. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters
underpinning the information in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
The information that relates to the Mutooroo Mineral Resource is extracted from two ASX releases. The first titled ‘Mutooroo Copper-Cobalt Deposit Resource Statement’ dated 18 October 2010, and the second titled ‘New Mutooroo Cobalt Resource’
dated 5 June 2020. Both announcements are available to view at www.asx.com.au and at https://www.havilah-resources.com.au/. The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate in the relevant market announcement continue to apply and have not materially changed. The
company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
Important Notice and Disclaimer
2
Growing Copper Producer
Derek Carter Chair
Bob Fulker CEO & Managing Director
Murray Boyte Non-Exec. Director
Roger Higgins Non-Exec. Director
Luke Anderson CFO & Co. Sec.
Note: Currency is in Australian dollars unless otherwise stated
1. Closing share price on 31 August 2026.
2. Cash balance as at 30 June 2026.
3. Refer to Results for Half Year Ended 30 June 2026 released on 20
August 2026.
4. Register analysis is based on a point-in-time snapshot dated 23 July
2026 and may not reflect later trading activity.
With strong development & exploration pipelines
3
13.9%
BOARD & MANAGEMENT
Share price1 $1.10
Shares on issue1 235.9 M
Market capitalisation $260 M
Debt Nil
Cash2 $32 M
Enterprise value $228 M
Options on issue 9.7 M
Income tax losses (est. & unaudited) $260 M
Franking credits3 $18 M
ASX:KAN
SUBSTANTIAL SHAREHOLDER4
SHARE DISTRIBUTION4
13.9%
25.9%
3.3%
1.0%
56%
Freepoint
Institutions excl Freepoint
Havilah Resources
Board & management
Others
4
Copper Market Outlook
Copper demand is projected to rise ~50% by 2040, driven
primarily by energy transition
4
The number of new copper discoveries has fallen
sharply since the 2000s, while average grades have declined
Increasing Cash costs reflect grade decline, deeper mining and
inflationary pressures
Higher incentive prices are required to bring new supply online,
contributing to a growing market deficit
Sources: All charts and data adapted from S&P Global, “Copper in the Age of AI: Challenges of Electrification.”
6.19
5.97
2025 H1 2026
AISC $/lb payable Cu Sold
Delivering and Growing the Business
Building blocks to value creation
5
H1 5,545 H1 6,290
H2 5,770
2025 2026
Cu Production - tonnes
H1 12.6
H1 34.8
H2 13.4
2025 2026
EBITDA $Million
Guidance1: 12,750 – 14,000
Guidance1: 5.75 – 6.25
Delivery
▪ Emily Star Exploration Drive
complete, development approved2
▪ Kavanagh North Exploration Drive
development commenced
▪ Major capital $15-17 million in 20261
▪ Near-mine exploration incl. Saddle
Zone, Paringa, Valentine & Critchley
GROWTH
Growth Opportunities
▪ Utilise latent plant capacity
▪ Inorganic growth opportunities
▪ Mutooroo Farm-In, Pre-Feasibility
Study commenced
▪ Regional exploration incl. Kanappa
▪ Assessment of inorganic growth
opportunities as they arise
Mine Life & Throughput Upsides
▪ Kanmantoo mine life extension
▪ Focusing on 2+Mtpa pathway
(currently at 1.8Mtpa)
1. Refer to ASX release on 22 January 2026 titled “Quarterly Report for 31 December 2025, Hillgrove Resources Delivers on 2025 Guidance and Sets Path for 2026”.
2. Refer to ASX release on 17 July 2026 titled ‘Emily Star Development Approved, Capital Guidance Updated’.
6
Kanmantoo Copper Mine (100%)
Latent capacity enables material production and cost reduction upside
160 kt Cu
Contained
120 koz Au
Contained
22 Mt
Resources
Resources1
34 kt Cu
Contained
29 koz Au
Contained
4.0 Mt
Reserves
Reserves1
Fully Permitted Operation
3.6 Mtpa
Processing Plant
1.8 Mtpa
UG Run Rate
~95%
Cu Recovery
>70% Renewable
Grid power
6.0 Mt
TSF Capacity
>95%
Local Workforce
1. Refer to ASX release on 30 October 2025 titled “Hillgrove Resources Delivers Ore Reserve Extension at 1.0%CuEq”.
2. Refer to ASX release on 17 July 2026 titled ‘Emily Star Development Approved, Capital Guidance Updated’.
TSF
Plant
Crusher
ROM
Backfilled
Emily Star Pit
UG Workshop
Railway
2 Active
Mining Fronts
700m/mth
Development
3rd Mining Front2
Under Development
55km
From Adelaide
Strong Support
By Local Communities
Railway
On Premise
Giant Pit
Gird Power
7
Nugent
Kavanagh
To be updated Monday
2026 Planned Stopes
2026 Planned Development
Existing Development to Aug 2026
Existing Void to Aug 2026
Existing Backfill to Aug 2026
Nugent
Kavanagh
Open at depth
Open at depth
Open at depth
Open at depth
North
Kavanagh
Spitfire
Emily Star Development Approved
▪ Geological continuity confirmed
▪ No material geotechnical risks identified
▪ $20 - $22 million capital requirement to
completion, in addition to the $2.9 million
spent to end of June
▪ $6.5 – 7.5 million spending in H2 2026
▪ Resource update expected in October
▪ Stope production to commence in H2 2027
▪ Development commenced from
underground with surface preparation
underway under existing Programme for
Environment Protection and Rehabilitation
(PEPR)
▪ Full PEPR update in progress, approval
expected ahead of commencing stoping
Third mining front under development to provide optionality1
Emily Star development and stoping plan based on the 2024 Emily Star Mineral Resource Update1,2
1. Refer to ASX release on 17 July 2026 titled ‘Emily Star Development Approved, Capital Guidance Updated’.
2. Refer to ASX release on 18 October 2024 titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment”. Image updated with latest development.
8
Near-Mine Prospects
1. Refer to ASX release on 11 December 2025 titled “Kanmantoo 2026 Exploration Update”.
2. Refer to ASX release on 1 September 2026 titled “High-grade Intersects Extend Spitfire Mineralisation”.
9
13 Targets within 1 km from the Kanmantoo Processing Facility1
Plan View of Location of Target Zones1
▪ Spitfire resource extension drilling returned high-grade intersects2, results will
be incorporated into the 2026 MROR update scheduled for October
▪ Emily Star mine design includes drill platforms enabling future underground
drilling at Critchley and Paringa
▪ Matthew & Coopers scheduled for inclusion in the 2027 North Kavanagh
drilling program
10
▪ PFS Phase 1 – Focused on material risk items, namely
rail logistics and metallurgical test work – expected to
conclude in the December Quarter1
▪ Rail logistics:
o Potentially 0.7 – 1 Mtpa ore transport
o Assessing potential siding locations for
Mutooroo
o Kanmantoo siding assessment underway with
concentrate backhaul under consideration
▪ Metallurgical testing:
o Preliminary lab flotation testing shows no fatal
flaws
o Optimal grind size and process configuration
investigation underway
1. Refer to Company June 2026 Quarterly Report released on 21 July 2026.
Mutooroo Copper Project
High-grade copper growth option unlocked by Kantra’s infrastructure advantage
Regional Exploration
11
▪ Strategic tenement holding at high-potential structural corridors
▪ Clear pipeline logic: Regional targets designed to complement
Kanmantoo and extend long-term copper optionality
▪ Data-driven targeting: Integrating geophysics, structure, and historical
datasets to rank highest-value prospects
▪ Active portfolio management to concentrate effort and capital on the
most prospective parts of the province
Current progress:
▪ Kanappa (EL 6526) – Drilling commenced in June 2026 and is continuing
▪ Firehawk (EL 6294) – Exploration Target expected in September 2026
▪ Stakeholder engagement and desktop studies are underway across all
remaining tenements, supporting prioritisation of the next phase of
exploration
Building a multi-asset copper growth pipeline
Firehawk
Kanappa
12
Upcoming Milestones
Building on consistent delivery to unlock future value
Kanmantoo Operation H1 2026 H2 2026
Ramp up to 1.7-1.8Mtpa Run Rate
Emily Star
Stage 1 Drill Platform
Drilling to Inform Stage 2 Decision
Stage 2 Investment Decision
Resources & Reserves
Resources & Reserves Update
Mutooroo Farm-In & Joint Venture
Pre-Feasibility Study – Phase 1
Pre-Feasibility Study – Phase 2
Regional Exploration
Kanappa – Approvals
Kanappa – Exploration Target
Kanappa – Drilling
Firehawk – Geophysics
Continue into 2027
Commenced in June 2026
Commenced in June 2026
Copper Foundation, Multi-Asset Future
Building the next mid-tier copper company
Cu Strategy in Tier 1 Jurisdiction
Robust Resources & Reserves
Cash Generating Operation
Latent Installed Capacity for Growth
Mutooroo Copper Growth Option
Near Mine Exploration Upside Potential
13
To receive up-to-date
company information,
scan the QR code to join
our Investor Hub
Kantra Copper Limited
5-7 King William Road
Unley SA 5041
info@kantra.com
www.kantra.com
Bob Fulker
CEO & Managing Director
+61 (0)8 7070 1698
Luke Anderson
CFO & Joint Company Secretary
+61 (0)8 7070 1698
Jane Brunton
Head of Investor Relations & Growth
+61 (0)8 7070 1698
Contact
Thank you
Appendix - Kanmantoo Mineral Reserve
15
Mine Area Classification
Tonnes
(kt)
Cu
(%)
Au
(ppm)
CuEq
(%)
Ag
(ppm)
Cu Metal
(kt)
Au Metal
(koz)
Kavanagh
Proved 1,500 0.96 0.11 1.0 2.8 14 5
Probable 900 0.89 0.19 1.0 2.9 8 5
Sub-Total 2,300 0.93 0.14 1.0 2.8 22 10
Nugent
Proved 360 0.73 0.37 1.0 1.9 3 4
Probable 1,300 0.73 0.34 0.9 1.9 9 14
Sub-Total 1,600 0.73 0.35 0.9 1.9 12 19
Total Ore
Reserves
Proved 1,800 0.92 0.16 1.0 2.6 17 9
Probable 2,200 0.79 0.28 1.0 2.3 17 19
Total 4,000 0.85 0.22 1.0 2.4 34 29
Notes:
1. Dry metric tonnes.
2. Stope cut-off grade 0.8% CuEq (Copper Equivalent) to define development limits, 0.6% CuEq for stopes along
defined development. Development cut-off grade 0.4% Copper.
3. Approximately 40,000 tonnes of Measured Mineral Resource has been converted to Probable Ore Reserves.
The tonnes are in Nugent Mine Area and are contained in a region with high water inflows from intercepting
diamond drill holes. Further work is required to determine a strategy to profitably mine these tonnes.
4. Reported Ore Reserves do not include any diluting Inferred or Unclassified material. The mine schedule
includes 277kt at 0.2% Cu of non-Reserving material that is mined as unavoidable dilution.
5. Reported grades are rounded to two decimal places, copper equivalent to one decimal place. Tonnes are
rounded to two significant figures. Minimum stoping widths of 5m true width.
6. Reported grades are rounded to two decimal places. Tonnes are rounded to two significant figures.
7. Any minor apparent discrepancies for sums in the table are due to rounding.
8. The period of economic extraction is from July 2025 to April 2028.
9. Ore Reserves are converted from Mineral Resources based on October 2025 Mineral Resources, reported
herewith.
10. Competent Person: Mark Hamilton MAusIMM (#221080).
11. Over 18 months of mining actual demonstrates very good ground conditions. It is expected that this will
continue, with Geotech modelling demonstrating stability over modelled life of mine.
CuEq calculation takes into account all material cost drivers that differentiate value derived from copper and gold,
expressed as copper grade in-situ. Drivers applied are concentrator recoveries, metal payability and metal prices.
Silver (Ag) is not included in CuEq calculation due to immaterial value contribution. The following formula is used
to calculate CuEq: CuEq = Cu% + (Au g/t / 31.1034 x Au Rec x Au Pay x Au Price) / Cu Pay / Cu Price / Cu Rec.
Driving values used for 2025 ORE: Metal prices: Cu Price = US$3.85/lb, Au Price = US$3,000/Oz. Metallurgical
recoveries: Cu Rec = 94.5%, Au Rec = 55% Payability: Cu Pay = 95%, Au Pay = 90%. It is Kantra’s view that all metals
within this formula will be recovered and sold. Metallurgical recoveries are based on current plant performance.
Metal payability is based on current concentrate quality and contracted marketing terms.
The information is extracted from the report entitled “Hillgrove Resources Delivers Ore Reserve Extension at 1.0%
CuEq”. released on 30 October 2025 and is available to view on the Kantra Website https://www.kantra.com. The
Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
15
Appendix - Kanmantoo Mineral Resource
Notes:
1. Due to effects of rounding, total numbers may not sum.
2. Inferred 1 – includes Kavanagh high grade Inferred; Central
Kavanagh, North Kavanagh and Valentines Categorical
Indicator Kriging (CIK) Inferred.
3. Inferred 2 – includes North Kavanagh high grade Inferred only
4. Inferred 3 – includes Nugent high grade and CIK Inferred
5. Inferred 4 – includes Valentines high grade Inferred only
6. Reporting criteria are: Measured, Indicated and Inferred
material (RESCAT = 1 or RESCAT = 2 or RESCAT = 3), Cu >=
0.40% (CU_PCT >= 0.4), in-situ (VOIZONE = 0) with reasonable
prospects of eventual economic extraction envelope
(MREZONE = 1), Reasonable Prospects for Eventual Economic
Extraction (RPEEE=1).
7. Tonnage and metal are rounded to the nearest 1,000 tonnes,
grades are rounded to two significant figures.
8. Mineral Resource is reported at a 0.40% Cu cut-off grade for
all mine areas.
9. Mineral Resource is depleted for mining to 30 June 2025.
10. Mine depletion refers to the current Kanmantoo
underground operation, and historical Giant, Nugent and
Emily Star open pits.
The information is extracted from the report entitled ‘Hillgrove
Resources Delivers Ore Reserve Extension at 1.0% CuEq’. released
on 30 October 2025 and is available to view on the Kantra Website
https://www.kantra.com. The Company confirms that it is not
aware of any new information or data that materially affects the
information included in the original market announcement and
that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified
from the original market announcement.
16
Mine Area
JORC
Classification
Tonnage Cu Au Ag Cu Metal Au Metal
(kt) (%) (g/t) (g/t) (kt) (koz)
Kavanagh
(including
Spitfire)
Measured 4,200 0.80 0.11 2.7 33 15
Indicated 2,700 0.72 0.13 2.5 19 11
Inferred 1 5,800 0.65 0.14 2.5 38 26
Sub-Total 12,700 0.72 0.13 2.6 91 53
North
Kavanagh
Measured - - - - - -
Indicated 180 0.78 0.12 3.4 1.4 0.7
Inferred 2 200 0.74 0.29 2.8 1.5 1.9
Sub-Total 380 0.76 0.21 3.0 2.9 2.6
Nugent
Measured 550 0.83 0.38 2.3 4.6 6.7
Indicated 2,300 0.75 0.37 2.0 17 28
Inferred 3 2,800 0.78 0.26 1.9 22 24
Sub-Total 5,700 0.77 0.32 2.0 44 59
Valentines
Measured - - - - - -
Indicated 200 0.65 0.07 1.3 1.3 0.5
Inferred 4 340 0.55 0.05 1.2 1.9 0.5
Sub-Total 540 0.59 0.06 1.2 3.2 1.0
Emily Star
No change to
2024
Measured - - - - - -
Indicated - - - - - -
Inferred 2,600 0.77 0.08 1.6 20 7
Sub-Total 2,600 0.77 0.08 1.6 20 7
TOTAL 22,000 0.74 0.17 2.3 160 120
16
Appendix - Mutooroo Mineral Resource
Notes: All figures in this table are rounded.
The information is extracted from Mineral Resource Estimate stated in the Havilah Resources Limited Annual Report for the financial year
ended 31 July 2025, first released in the Havilah ASX media release titled ‘Mutooroo Copper-Cobalt Deposit Resource Statement’, dated 18
October 2010, and ‘New Mutooroo Cobalt Resource’, dated 5 June 2020.
The information that relates to the Mutooroo Mineral Resource is extracted from two ASX releases. The first titled ‘Mutooroo Copper-Cobalt
Deposit Resource Statement’ dated 18 October 2010, and the second titled ‘New Mutooroo Cobalt Resource’ dated 5 June 2020. Both
announcements are available to view at www.asx.com.au and at https://www.havilah-resources.com.au. The company confirms that it is
not aware of any new information or data that materially affects the information included in the original market announcements and that all
material assumptions and technical parameters underpinning the Mineral Resource Estimate in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person's
findings are presented have not been materially modified from the original market announcements.
17
17
Classification
Resource
Category
Tonnes
Copper
%
Cobalt
%
Gold
g/t
Copper
tonnes
Cobalt
tonnes
Gold
ounces
Measured Oxide 598,000 0.56 0.04 0.08
Subtotal Oxide 598,000 0.56 0.04 0.08 3,300 200 1,500
Measured Sulphide 4,149,000 1.23 0.14 0.18
Indicated Sulphide 1,697,000 1.52 0.14 0.35
Inferred Sulphide 6,683,000 1.71 0.17 0.17
Subtotal Sulphide 12,529,000 1.53 0.16 0.20 191,700 20,000 80,600
TOTAL 13,127,000 195,000 20,200 82,100