Presentation - Noosa Mining Conference
Released
Released
Announcement PDF
1 of 1
21 July 2026
PRESENTATION – NOOSA MINING CONFERENCE
Hillgrove Resources Ltd (“the Company” or “Hillgrove”) (ASX:HGO) is pleased to enclose a copy of the presentation to be
delivered by Hillgrove’s CEO & Managing Director, Bob Fulker, at the Noosa Mining Conference at 11:30am (AEST) on
Friday, 24 July 2026.
Stakeholders can register to watch online for free at the following link:
https://www.noosaminingconference.com.au/
Authorised for release by the Board of Hillgrove Resources Limited.
Engage with this announcement at the Hillgrove Resources Investor Hub.
For more information contact:
Mr Bob Fulker Mr Luke Anderson
Chief Executive Officer & Managing Director Chief Financial Officer & Joint Company Secretary
T: +61 (0)8 7070 1698 T: +61 (0)8 7070 1698
Ms Jane Brunton
Head of Investor Relations & Growth
T: +61 (0)8 7070 1698
E: info@hillgroveresources.com.au
An Australian
Copper Producer
Noosa Mining Conference
July 2026
Bob Fulker
Chief Executive Officer & Managing Director
Disclaimer
To the maximum extent permitted by law, neither Hillgrove nor its related corporations, directors, officers, employees or agents, nor any other person, accepts any liability, including, without limitation,
any liability arising from fault or negligence, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it. Hillgrove is under no obligation to release any updates or revisions to this
presentation to reflect any change in expectation or assumptions and disclaim all responsibility and liability for these forward-looking statements (including, without limitation, liability for fraud or negligence).
Nothing contained in this Document constitutes investment, legal, tax or other advice. The information in this Document does not take into account the investment objectives, financial situation or particular needs of any recipient.
Before making an investment decision, each recipient of this Document should make its own assessment and take independent professional advice in relation to this Document and any action taken on the basis of this Document. All
currency referred to is Australian dollars ($) unless otherwise indicated (e.g. US$).
Forward Looking Statement
This presentation contains or may contain certain forward-looking statements and comments about future events, that are based on Hillgrove's beliefs, assumptions and expectations and on information currently available to
management as at the date of this presentation. Often, but not always, forward-looking statements can generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate",
"outlook", and "guidance", or similar expressions, and may include, without limitation, statements regarding plans, strategies and objectives of management, anticipated production and production potential, financial forecasts, product
quality estimates of future Mineral Resources and Ore Reserves. Such statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values, results or performance
achievements to differ materially from those expressed or implied in this announcement. Where Hillgrove expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith
and on a reasonable basis. No representation or warranty, express or implied, is made by Hillgrove that the matters stated in this presentation will in fact be achieved or prove to be correct. Except as required by law, Hillgrove
undertakes no obligation to provide any additional or updated information or update any forward-looking statements whether as a result of new information, future events, results or otherwise. Readers are cautioned against placing
undue reliance on forward-looking statements. These forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of
which are beyond the control of Hillgrove, the directors, and management of Hillgrove. These factors include, but are not limited to difficulties in forecasting expected production quantities, the potential that any of Hillgrove's projects
may experience technical, geological, metallurgical and mechanical problems, changes in market prices and other risks not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing assumptions,
major changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously underestimated technical challenges, increased costs, and demand for production inputs.
Competent Persons Statement
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Hillgrove is subject to Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX.
Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (the JORC Code).
The information in this report that relates to the 2025 Kanmantoo Mineral Resource Estimate and the 2025 Ore Reserve is extracted from ASX release titled ‘Hillgrove Resources Delivers Ore Reserve Extension at 1.0%CuEq’ dated 30
October 2025 and is available to view at www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement
and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate is extracted from ASX release titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment”
dated 18 October 2024 and is available to view at www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate and Ore Reserve in the relevant market announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
The information in this report that relates to planned drilling opportunities was extracted from the ASX release titled ‘2026 Kanmantoo Exploration Update’ previously released on the 11 Dec 2025 and “Exploration Target Defined for
Kanappa Drilling Program” released on the 16 April 2026 and is available to view at www.hillgroveresources.com.au. The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters underpinning the information in the relevant market announcement continue to apply and have not materially changed. The
company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
The information that relates to the Mutooroo Mineral Resource is extracted from two ASX releases. The first titled ‘Mutooroo Copper-Cobalt Deposit Resource Statement’ dated 18 October 2010, and the second titled ‘New Mutooroo
Cobalt Resource’ dated 5 June 2020. Both announcements are available to view at www.asx.com.au and at https://www.havilah-resources.com.au/. The company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market
announcements.
Important Notice and Disclaimer
2
Growing Copper Producer
Derek Carter Chair
Bob Fulker CEO & Managing Director
Murray Boyte Non-Exec. Director
Roger Higgins Non-Exec. Director
Luke Anderson CFO & Co. Sec.
Note: Currency is in Australian dollars unless otherwise stated
1. Closing share price on 20 July 2026.
2. Cash balance as at 30 June 2026.
3. Refer to Results for Full Year Ended 31 December 2025 released on 25
February 2026.
4. Freepoint’s reduced percentage holding reflects the Mutooroo Stage 1
share issuance, not a sell-down by Freepoint.
5. Register analysis is based on a point-in-time snapshot dated 18 June
2026 and may not reflect later trading activity.
With strong development & exploration pipelines
3
13.9%
BOARD & MANAGEMENT
Share price1 $0.056
Shares on issue1 3,539 M
Market capitalisation $198 M
Debt Nil
Cash2 $32 M
Enterprise value $166 M
Options on issue 145 M
Income tax losses3 $280 M
Franking credits3 $18 M
ASX:HGO
SUBSTANTIAL SHAREHOLDER4,5
SHARE DISTRIBUTION4,5
13.9%
23.7%
3.3%
1.0%
58%
Freepoint
Institutions
Havilah Resources
Board & management
Others
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
16,000
18,000
20,000
22,000
24,000
26,000
Price
(US$/mt)
Copper
Concentrate
(000
mt)
Forecast Consumption (LHS) Forecast Production (LHS) LME 3-month (RHS)
4
Copper Market Outlook
Hillgrove is well-positioned as supply tightens
▪ Very few new copper discoveries – long development time frame
▪ Existing mines trending higher cost and lower grade
▪ Reserve replacement running below depletion
▪ Demand is increasing, supported by ongoing investment in
electrification, grid infrastructure, and the rapid build-out of data
centres
▪ Structural deficits emerging
▪ Hillgrove’s copper concentrate is directly exposed to the tightening
copper market and includes gold and silver credits
Sources:
1. Copper concentrate supply, demand and LME price forecast sourced from “Copper CBS
February 2026 - Databook”, S&P Global, dated 12 Feb 2026.
2. Recent major discoveries tiny vs older deposits chart source: “New major copper
discoveries remain scarce; late-stage assets drive growth”, S&P Global, dated 6 Dec 2025.
Copper Concentrate Supply, Demand, & LME
Price Forecast
Kanmantoo
2026 Guidance1
▪ 12,750 – 14,000 tonnes Cu produced
▪ AISC A$5.75–6.25/lb payable Cu sold
▪ A$15 – 17 million major capital2
▪ Emily Star Exploration Drive
complete, development approved2
▪ Kavanagh North Exploration Drive
development commenced
▪ Near-mine exploration incl. Saddle
Zone, Paringa, Valentine and
Critchley
GROWTH
Material Scale Up Opportunities
▪ Utilise latent plant capacity
▪ Inorganic growth opportunities
▪ Mutooroo Farm-In, Pre-Feasibility
Study commenced
▪ Regional exploration incl. Kanappa
▪ Assessment of inorganic growth
opportunities as they arise
2026 Focus
▪ Mining operation in Kavanagh &
Nugent
▪ Current run rate at 1.8Mtpa
▪ June 2026 YTD, 6,290t Cu produced
at AISC $5.97/lb payable Cu sold
▪ On track to deliver 2026 production &
cost guidance
Delivering and Growing the Business
Building blocks to value creation
1. Refer to ASX release on 22 January 2026 titled “Quarterly Report for 31 December 2025, Hillgrove Delivers on 2025 Guidance and Sets Path for 2026”.
2. Refer to ASX release on 17 July 2026 titled ‘Emily Star Development Approved, Capital Guidance Updated’.
5
Mine Life & Throughput Upsides
▪ Mine life extension
▪ Focusing on 2+Mtpa pathway
6
Kanmantoo Copper Mine (100%)
Latent capacity enables material production and cost reduction upside
160 kt Cu
Contained
120 koz Au
Contained
22 Mt
Resources
Resources1
34 kt Cu
Contained
29 koz Au
Contained
4.0 Mt
Reserves
Reserves1
Fully Permitted Operation
3.6 Mtpa
Processing Plant
1.8 Mtpa
UG Run Rate
~95%
Cu Recovery
>70% Renewable
Grid power
6.0 Mt
TSF Capacity
>95%
Local Workforce
1. Refer to ASX release on 30 October 2025 titled “Hillgrove Resources Delivers Ore Reserve Extension at 1.0%CuEq”.
2. Refer to ASX release on 17 July 2026 titled ‘Emily Star Development Approved, Capital Guidance Updated’.
TSF
Plant Crusher
ROM
Backfilled
Emily Star Pit
UG Workshop
Railway
2 Active
Mining Fronts
700m/mth
Development
3rd Mining Front2
Under Development
55km
From Adelaide
Strong Support
By Local Communities
Railway
On Premise
7
DRAFT
Open at depth
Open at depth
Open at depth
Open at depth
Emily Star Development Approved
▪ Geological continuity confirmed
▪ No material geotechnical risks identified
▪ $20 - $22 million capital requirement to
completion, in addition to the $2.9
million spent YTD
▪ $6.5 – 7.5 million spending in H2 2026
▪ Resource update expected in Dec Qtr
▪ Stope production to commence in H2
2027
▪ Development to commence under
existing Programme for Environment
Protection and Rehabilitation (PEPR)
▪ Full PEPR update in progress, approval
expected ahead of commencing
stoping
Third mining front to provide optionality1
Emily Star development and stoping plan based on the 2024 Emily Star Mineral Resource Update1,2
1. Refer to ASX release on 17 July 2026 titled ‘Emily Star Development Approved, Capital Guidance Updated’.
2. Refer to ASX release on 18 October 2024 titled “Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment”. Image updated with latest development.
8
Near-Mine Prospects
1. Refer to ASX release on 11 December 2025 titled “Kanmantoo 2026 Exploration Update”.
9
13 Targets within 1 km from the Kanmantoo Processing
Facility1
▪ High-grade hits across multiple corridors
▪ Targets close to existing infrastructure, shortening
development timelines and reducing capital intensity
▪ The breadth of prospects provides multi-year growth
potential beyond the current mine plan
Supporting multi-year growth potential
Plan View of Location of Target Zones1
10
▪ Farm-in Agreement enables Hillgrove to
earn up to 80% interest in Mutooroo over a
24-month period1
▪ Phased PFS of up to $10 million:
o Phase 1 – Focused on rail logistics and
metallurgical test work – expected to
conclude in the December Quarter2
o Phase 2 – Remaining PFS work
contingent on the success of Phase 1
o PFS includes 5,000m of drilling for
resource definition Mutooroo copper concentrate from
preliminary metallurgical test work
1. Refer to ASX release on 21 May 2026 titled “Hillgrove and Havilah Enter Mutooroo Partnership”.
2. Refer to Company June 2026 Quarterly Report released on 21 July 2026.
Mutooroo Copper Project
High-grade copper growth option unlocked by Hillgrove’s infrastructure advantage
Regional Exploration
11
▪ Kanappa (EL 6526) – drilling commenced in June 2026
▪ Firehawk (EL 6294) – Geophysical data collected and processing
underway
▪ Strategic tenement holding at high-potential structural corridors
▪ Clear pipeline logic: Regional targets designed to complement
Kanmantoo and extend long-term copper optionality
▪ Data-driven targeting: Integrating geophysics, structure, and historical
datasets to rank highest-value prospects
▪ Active portfolio management to concentrate effort and capital on the
most prospective parts of the province
Building a multi-asset copper growth pipeline
Firehawk
Kanappa
12
Transitioning to Kantra Copper
Strengthening our identity as a copper producer
▪ Kantra combines “Kan” (from Kanmantoo Copper Mine) with
“tra”, a variation of Terra (Latin for earth) - a modern name
that is grounded in the Company’s heritage while signalling a
broader, future-facing outlook1
▪ A 1-for-15 consolidation to mature the register, bring the
share price to a more conventional level, and reflect the
Company’s progression1
o Not a precursor to a capital raise.
▪ Notice of Meeting issued2
▪ General Meeting to take place on 17 August2
1. Refer to ASX announcement titled ‘Proposed Name Change and Share Consolidation’, released on 17 July 2026.
2. Refer to Notice of Meeting, released on 17 July 2026.
13
Upcoming Milestones
Building on consistent delivery to unlock future value
Kanmantoo Operation H1 2026 H2 2026
Ramp up to 1.7-1.8Mtpa Run Rate
Emily Star
Stage 1 Drill Platform
Drilling to Inform Stage 2 Decision
Stage 2 Investment Decision
Resources & Reserves
Resources & Reserves Update
Mutooroo Farm-In & Joint Venture
Pre-Feasibility Study – Phase 1
Pre-Feasibility Study – Phase 2
Regional Exploration
Kanappa – Approvals
Kanappa – Exploration Target
Kanappa – Drilling
Firehawk – Exploration Target
Continue into 2027
Commenced in June 2026
Commenced in June 2026
Copper Foundation, Multi-asset Future
Building the next mid-tier copper company
Cu Strategy in Tier 1 Jurisdiction
Robust Resources & Reserves
Cash Generating Operation
Latent Installed Capacity for Growth
Mutooroo Copper Growth Option
Near Mine Exploration Upside Potential
14
To receive up-to-date
company information,
scan the QR code to join
our Investor Hub
Hillgrove Resources
5-7 King William Road
Unley SA 5041
info@hillgroveresources.com.au
www.hillgroveresources.com.au
Bob Fulker
CEO & Managing Director
+61 (0)8 7070 1698
Luke Anderson
CFO & Joint Company Secretary
+61 (0)8 7070 1698
Jane Brunton
Head of Investor Relations & Growth
+61 (0)8 7070 1698
Contact
Thank you
Appendix - Kanmantoo Mineral Reserve
16
Mine Area Classification
Tonnes
(kt)
Cu
(%)
Au
(ppm)
CuEq
(%)
Ag
(ppm)
Cu Metal
(kt)
Au Metal
(koz)
Kavanagh
Proved 1,500 0.96 0.11 1.0 2.8 14 5
Probable 900 0.89 0.19 1.0 2.9 8 5
Sub-Total 2,300 0.93 0.14 1.0 2.8 22 10
Nugent
Proved 360 0.73 0.37 1.0 1.9 3 4
Probable 1,300 0.73 0.34 0.9 1.9 9 14
Sub-Total 1,600 0.73 0.35 0.9 1.9 12 19
Total Ore
Reserves
Proved 1,800 0.92 0.16 1.0 2.6 17 9
Probable 2,200 0.79 0.28 1.0 2.3 17 19
Total 4,000 0.85 0.22 1.0 2.4 34 29
Notes:
1. Dry metric tonnes.
2. Stope cut-off grade 0.8% CuEq (Copper Equivalent) to define development limits, 0.6% CuEq for stopes along
defined development. Development cut-off grade 0.4% Copper.
3. Approximately 40,000 tonnes of Measured Mineral Resource has been converted to Probable Ore Reserves.
The tonnes are in Nugent Mine Area and are contained in a region with high water inflows from intercepting
diamond drill holes. Further work is required to determine a strategy to profitably mine these tonnes.
4. Reported Ore Reserves do not include any diluting Inferred or Unclassified material. The mine schedule
includes 277kt at 0.2% Cu of non-Reserving material that is mined as unavoidable dilution.
5. Reported grades are rounded to two decimal places, copper equivalent to one decimal place. Tonnes are
rounded to two significant figures. Minimum stoping widths of 5m true width.
6. Reported grades are rounded to two decimal places. Tonnes are rounded to two significant figures.
7. Any minor apparent discrepancies for sums in the table are due to rounding.
8. The period of economic extraction is from July 2025 to April 2028.
9. Ore Reserves are converted from Mineral Resources based on October 2025 Mineral Resources, reported
herewith.
10. Competent Person: Mark Hamilton MAusIMM (#221080).
11. Over 18 months of mining actual demonstrates very good ground conditions. It is expected that this will
continue, with Geotech modelling demonstrating stability over modelled life of mine.
CuEq calculation takes into account all material cost drivers that differentiate value derived from copper and gold,
expressed as copper grade in-situ. Drivers applied are concentrator recoveries, metal payability and metal prices.
Silver (Ag) is not included in CuEq calculation due to immaterial value contribution. The following formula is used
to calculate CuEq: CuEq = Cu% + (Au g/t / 31.1034 x Au Rec x Au Pay x Au Price) / Cu Pay / Cu Price / Cu Rec.
Driving values used for 2025 ORE: Metal prices: Cu Price = US$3.85/lb, Au Price = US$3,000/Oz. Metallurgical
recoveries: Cu Rec = 94.5%, Au Rec = 55% Payability: Cu Pay = 95%, Au Pay = 90%. It is Hillgrove’s view that all
metals within this formula will be recovered and sold. Metallurgical recoveries are based on current plant
performance. Metal payability is based on current concentrate quality and contracted marketing terms.
The information is extracted from the report entitled “Hillgrove Delivers Ore Reserve Extension at 1.0% CuEq”.
released on 30 October 2025 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market announcement and that
all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement. 16
Appendix - Kanmantoo Mineral Resource
Notes:
1. Due to effects of rounding, total numbers may not sum.
2. Inferred 1 – includes Kavanagh high grade Inferred; Central
Kavanagh, North Kavanagh and Valentines Categorical
Indicator Kriging (CIK) Inferred.
3. Inferred 2 – includes North Kavanagh high grade Inferred only
4. Inferred 3 – includes Nugent high grade and CIK Inferred
5. Inferred 4 – includes Valentines high grade Inferred only
6. Reporting criteria are: Measured, Indicated and Inferred
material (RESCAT = 1 or RESCAT = 2 or RESCAT = 3), Cu >=
0.40% (CU_PCT >= 0.4), in-situ (VOIZONE = 0) with reasonable
prospects of eventual economic extraction envelope
(MREZONE = 1), Reasonable Prospects for Eventual Economic
Extraction (RPEEE=1).
7. Tonnage and metal are rounded to the nearest 1,000 tonnes,
grades are rounded to two significant figures.
8. Mineral Resource is reported at a 0.40% Cu cut-off grade for
all mine areas.
9. Mineral Resource is depleted for mining to 30 June 2025.
10. Mine depletion refers to the current Kanmantoo
underground operation, and historical Giant, Nugent and
Emily Star open pits.
The information is extracted from the report entitled ‘Hillgrove
Delivers Ore Reserve Extension at 1.0% CuEq’. released on 30
October 2025 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The
Company confirms that it is not aware of any new information or
data that materially affects the information included in the original
market announcement and that all material assumptions and
technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in
which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
17
Mine Area
JORC
Classification
Tonnage Cu Au Ag Cu Metal Au Metal
(kt) (%) (g/t) (g/t) (kt) (koz)
Kavanagh
(including
Spitfire)
Measured 4,200 0.80 0.11 2.7 33 15
Indicated 2,700 0.72 0.13 2.5 19 11
Inferred 1 5,800 0.65 0.14 2.5 38 26
Sub-Total 12,700 0.72 0.13 2.6 91 53
North
Kavanagh
Measured - - - - - -
Indicated 180 0.78 0.12 3.4 1.4 0.7
Inferred 2 200 0.74 0.29 2.8 1.5 1.9
Sub-Total 380 0.76 0.21 3.0 2.9 2.6
Nugent
Measured 550 0.83 0.38 2.3 4.6 6.7
Indicated 2,300 0.75 0.37 2.0 17 28
Inferred 3 2,800 0.78 0.26 1.9 22 24
Sub-Total 5,700 0.77 0.32 2.0 44 59
Valentines
Measured - - - - - -
Indicated 200 0.65 0.07 1.3 1.3 0.5
Inferred 4 340 0.55 0.05 1.2 1.9 0.5
Sub-Total 540 0.59 0.06 1.2 3.2 1.0
Emily Star
No change to
2024
Measured - - - - - -
Indicated - - - - - -
Inferred 2,600 0.77 0.08 1.6 20 7
Sub-Total 2,600 0.77 0.08 1.6 20 7
TOTAL 22,000 0.74 0.17 2.3 160 120
17
Appendix - Mutooroo Mineral Resource
Notes: All figures in this table are rounded.
The information is extracted from Mineral Resource Estimate stated in the Havilah Resources Limited Annual Report for the financial year
ended 31 July 2025, first released in the Havilah ASX media release titled ‘Mutooroo Copper-Cobalt Deposit Resource Statement’, dated 18
October 2010, and ‘New Mutooroo Cobalt Resource’, dated 5 June 2020.
The information that relates to the Mutooroo Mineral Resource is extracted from two ASX releases. The first titled ‘Mutooroo Copper-Cobalt
Deposit Resource Statement’ dated 18 October 2010, and the second titled ‘New Mutooroo Cobalt Resource’ dated 5 June 2020. Both
announcements are available to view at www.asx.com.au and at https://www.havilah-resources.com.au/. The company confirms that it is
not aware of any new information or data that materially affects the information included in the original market announcements and that all
material assumptions and technical parameters underpinning the Mineral Resource Estimate in the relevant market announcement
continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person's
findings are presented have not been materially modified from the original market announcements.
18
18
Classification
Resource
Category
Tonnes
Copper
%
Cobalt
%
Gold
g/t
Copper
tonnes
Cobalt
tonnes
Gold
ounces
Measured Oxide 598,000 0.56 0.04 0.08
Subtotal Oxide 598,000 0.56 0.04 0.08 3,300 200 1,500
Measured Sulphide 4,149,000 1.23 0.14 0.18
Indicated Sulphide 1,697,000 1.52 0.14 0.35
Inferred Sulphide 6,683,000 1.71 0.17 0.17
Subtotal Sulphide 12,529,000 1.53 0.16 0.20 191,700 20,000 80,600
TOTAL 13,127,000 195,000 20,200 82,100