2025 Kanmantoo Exploration Target Update
Released
Released
Announcement PDF
13th February 2025
2025 KANMANTOO EXPLORATION TARGET UPDATE
Hillgrove Resources Limited (‘Hillgrove’, ‘the Company’) (ASX:HGO) is pleased to provide the following
Exploration Target update at its Kanmantoo Mine and near surrounds located at Kanmantoo, 55 kilometres
southeast of Adelaide in South Australia.
KEY POINTS
•
•
•
•
High potential Explorational Targets identified (see Table 1) with excellent potential for down dip
extensions to mineralisation and the discovery of new lodes which can be added to the mine plan:
Four targets down dip of the 2024 Mineral Resource
Five untested targets for underground potential including three with surface expression
All targets are within 500 metres of the Kanmantoo processing plant
Over 19,000 metres of diamond drilling is planned from Kanmantoo Underground testing
Exploration Targets
Third underground diamond drill rig to be mobilised during Quarter 2
Commenting on the new Exploration Targets, Hillgrove CEO and Managing Director, Bob Fulker said:
“Following the successful near doubling of contained copper and 138% increase in contained gold in
the September 2024 Kanmantoo Mineral Resource Estimate, the team have identified and prioritised
the next drilling targets at Kanmantoo from the numerous Exploration Targets available. Our new suite
of Exploration Targets focus on down dip extensions to known open pit mined resources and near
mine discovery opportunities at Stella and South Kanmantoo.”
Updated Exploration Target
Figure 1: Longitudinal section of Exploration Target zone locations
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
Hillgrove has approximated an Exploration Target for the Kanmantoo area of between 25 to 40 million tonnes
with a target grade of 0.7% to 1.4% copper and 0.05 g/t to 0.5 g/t gold (see Table 1) based on exploration
drilling results, relevant operational experience and geological knowledge of the deposit. The grade range
estimates are in line with the parameters used to generate the domain models for the 2024 Mineral Resource
Estimate. The Exploration Target herein replaces the Company’s previous Exploration Target releases and
excludes the 2024 Mineral Resource Estimate (MRE) at Kavanagh, Nugent, Emily Star and North Kavanagh 1.
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral
Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource under the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, the JORC
Code” (JORC 2012). The Exploration Target is not being reported as part of any Mineral Resource or Ore
Reserve estimate.
Included in this release is an approximation of the Exploration Target at Stella and South Kanmantoo.
Mineralisation has been affirmed at both targets by Hillgrove’s exploration drilling. See ASX releases titled
‘New Gold Discovery Confirmed at Stella’ dated 26 August 2021 and ‘Kanmantoo Brownfields Exploration
Drilling Results’ dated 2 June 2010 for drilling results. Both targets are located on an Exploration Licence (EL
6526) held 100% by Hillgrove and within 500 metres of the Kanmantoo processing plant.
Kanmantoo Region Exploration Target
Deposit
Tonnage Range
Grade Range
Grade Range
(Mt)
(Cu%)
(Aug/t)
Targets Below 2024 Mineral Resource
Kavanagh
4.5-7.0
0.7-1.4
0.05-0.2
Nugent
2.8-3.4
0.7-1.3
0.3-0.5
Emily Star
3.3-5.0
0.7-1.1
0.05-0.2
1.9-2.8
0.7-1.1
0.1-0.3
North Kavanagh
Targets with No Adjacent Resource Estimate
Matthew
3.1-4.7
0.7-1.1
0.1-0.3
Valentines
1.9-2.8
0.7-1.2
0.05-0.2
Paringa
1.2-1.9
0.7-1.0
0.05-0.2
Critchley
1.2-1.9
0.7-1.1
0.05-0.2
1.0-2.0
0.7-1.2
0.1-0.3
Coopers
Targets within 500m of Processing Plant (on EL 6526)
South Kanmantoo (EL 6526)
2.0-4.0
0.7-1.2
0.1-0.3
Stella (EL 6526)
Total
2.0-4.0
25.0-40.0
0.7-1.2
0.7-1.4
0.1-0.3
0.05-0.5
Table 1: Summary of the Kanmantoo Exploration Target by Lode 2
See ASX release titled ‘Maiden Kanmantoo Underground Ore Reserve And 96% Increase In Copper Mineral Resource Endowment’
dated 18 October 2024 available to view at www.hillgroveresources.com.au and see Appendix A of this release for information on
Kanmantoo Mineral Resource and Ore Reserve
2
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is uncertain if
further exploration will result in the determination of a Mineral Resource under the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves, the JORC Code” (JORC 2012). The Exploration Target is not being reported as part of any Mineral
Resource or Ore Reserve.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
1+1
Figure 1: Plan view of location of target zones
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
2025 Exploration Activities
Figure 3: Planned Exploration Drill Targets 2025
The Kanmantoo orebody has excellent potential for down dip extensions to mineralisation and the discovery
of new lodes, as shown in Figure 3 and demonstrated by a 96% increase in the recently reported Kanmantoo
Mineral Resource 3 achieved through organic growth. In addition to this, the Geology team have identified the
next series of near mine exploration opportunities utilising the underground development of new diamond drill
platforms allowing for targeting new areas of Valentines, Critchley and Matthew below previous surface
expressions identified.
To test these areas, the Company will be mobilising a third underground diamond drill rig to facilitate the
continued drilling of these near mine targets, alongside resource expansion and grade control targets. It will
focus on targeting mine life extensions down dip of the existing mine design on the Nugent and Kavanagh
lodes – including testing strike extensions to known lodes and testing lodes such as Valentines, Critchley and
Paringa which are located proximal to planned mine infrastructure. Approximately 19,000 metres of drilling is
planned for these areas in 2025 and is in addition to the grade control drilling which is planned to occur
continuously utilising two drill rigs.
Information collected during the drilling campaigns will be used to further understand the structural controls on
the Kanmantoo Mineralisation system and mineralogy associations with specialised data collection planned.
This drilling will be incorporated feed into Hillgrove’s annual Mineral Resource and Ore Reserve Statement
planned for release in the fourth quarter of 2025. This will also include the results of drilling conducted in 2024
but not yet incorporated into the announcement dated 18 October 2024.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
Method of Assessment
Over the region of the Kanmantoo Copper Mine that falls outside of the current mine plan and existing mine
voids (pit and underground), eleven potential higher-grade copper-gold target zones have been identified
which will be the focus for future exploration efforts. The identification and location of the target zones is
predominantly based upon reviewing depth, width and strike extensions of known copper gold zones that have
been mined within the open pit or been intersected by drilling undertaken by Hillgrove. A review of the Company
drill hole database containing the drilling undertaken by Hillgrove over the past 21 years down to a depth of
800 metres, in conjunction with the operational information from both the open pit and underground operations,
and the geological knowledge gained from the years of mining shows several higher-grade copper-gold zones
do extend to depth beneath or within the surrounds of the Giant, Nugent and Emily Star open pits. The grade
range estimates are in line with the parameters used to generate the domain models for the 2024 Mineral
Resource Estimate.
The analysis of the drill hole database also shows there is a lack of drilling below and along strike of the open
pits to assess these higher-grade zones (Figure 2 and 3). Outside of these open pits the average depth of
drilling is <120 metres below surface. The copper and gold grade profiles for the Exploration Target have been
defined based upon average grades of exploration diamond drilling within the target copper-gold zones, or the
average grade of the appropriate MRE for the relevant zone. The Nugent and Kavanagh targets have been
updated to account for the ongoing grade control drilling and the 2024 Kanmantoo Mineral Resource4. The
West Kavanagh, Central Kavanagh, East Kavanagh, and Spitfire targets have been combined as “Kavanagh”.
Authorised for release by the Board of Hillgrove Resources Limited.
For more information contact:
Mr Bob Fulker
CEO & Managing Director
Tel: +61 (0)8 7070 1698
Mr Joe Sutanto
Chief Financial Officer & Company Secretary
Tel: +61 (0)8 7070 1698
Forward Looking Statement
This release contains or may contain certain forward-looking statements and comments about future events,
that are based on Hillgrove's beliefs, assumptions and expectations and on information currently available to
management as at the date of this presentation. Often, but not always, forward-looking statements can
generally be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes",
"estimate", "anticipate", "outlook", and "guidance", or similar expressions, and may include, without limitation,
statements regarding plans, strategies and objectives of management, anticipated production and production
potential, financial forecasts, product quality estimates of future Mineral Resources and Ore Reserves. Such
statements are only expectations or beliefs and are subject to inherent risks and uncertainties which could
cause actual values, results or performance achievements to differ materially from those expressed or implied
in this announcement. Where Hillgrove expresses or implies an expectation or belief as to future events or
results, such expectation or belief is expressed in good faith and on a reasonable basis. No representation or
warranty, express or implied, is made by Hillgrove that the matters stated in this presentation will in fact be
achieved or prove to be correct. Except as required by law, Hillgrove undertakes no obligation to provide any
additional or updated information or update any forward-looking statements whether on a result of new
information, future events, results or otherwise. Readers are cautioned against placing undue reliance on
forward-looking statements. These forward-looking statements are not guarantees of future performance and
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of Hillgrove, the directors, and management of Hillgrove. These factors include, but are not
See ASX release titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral Resource Endowment’
dated 18 October 2024 [ no need to restate – use same reference number [1] instead]
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
4
limited to difficulties in forecasting expected production quantities, the potential that any of Hillgrove's projects
may experience technical, geological, metallurgical and mechanical problems, changes in market prices and
other risks not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing
assumptions, major changes in mine plans and/or resources, changes in equipment life or capability,
emergence of previously underestimated technical challenges, increased costs, and demand for production
inputs.
About Kanmantoo Copper Mine
The Kanmantoo Copper Mine is located approximately 55 kilometres from Adelaide, South Australia. The mine
operated as a series of open pits from 2010 to 2020, producing around 137,000 tonnes of copper and over
55,000 ounces of gold. The operation is fully permitted and has significant infrastructure including a 3.6 million
tonne per annum processing plant and a tailings storage facility with approximately 7.0 million tonnes of
permitted capacity. Operations restarted in 2023 with underground mining commencing in May 2023 and first
copper production in February 2024.
Competent Person's Statement
The information in this release that relates to the Exploration Targets is based upon information compiled
by Caitlin Rowett, who is a Member of The Australasian Institute of Mining and Metallurgy. Caitlin Rowett is a
full-time employee and holds equity in Hillgrove Resources Limited and has sufficient experience relevant to
the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (JORC Code)’. Caitlin Rowett has consented to the inclusion in the release of the matters
based on their information in the form and context in which it appears.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate is extracted from
ASX release titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral
Resource Endowment’ dated 18 October 2024 and is available to view at www.hillgroveresources.com.au.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and technical parameters
underpinning the Mineral Resource Estimate in the relevant market announcement continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent Person's
findings are presented have not been materially modified from the original market announcements.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
APPENDIX A – Mineral Resource and
Ore Reserve estimate
Kanmantoo Mineral Resource Estimate as at 30th September 2024
Mine Area
JORC
Tonnage
Cu
Au
Ag
Bi
Classification
(kt)
(%)
(g/t)
(g/t)
(ppm)
Cu
Au
Metal
Metal
(kt)
(koz)
Measured
3,200
0.94
0.04
2.9
190
30
4
Kavanagh
Indicated
3,400
0.77
0.10
2.4
97
26
11
(including Spitfire)
Inferred
6,300
0.70
0.11
2.4
110
44
22
Sub-Total
13,000
0.78
0.09
2.5
130
100
37
Measured
-
-
-
-
-
-
-
Indicated
230
0.78
0.17
3.0
140
2
1
Inferred
110
0.77
0.21
3.3
130
1
1
Sub-Total
340
0.78
0.18
3.1
140
3
2
Measured
-
-
-
-
-
-
-
Indicated
2,300
0.74
0.36
1.7
66
17
26
Inferred
1,100
0.71
0.35
1.6
40
8
13
Sub-Total
3,400
0.73
0.36
1.6
57
25
39
Measured
-
-
-
-
-
-
-
Indicated
-
-
-
-
-
-
-
Inferred
2,600
0.77
0.08
1.6
110
20
7
Sub-Total
2,600
0.77
0.08
1.6
110
20
7
19,300
0.77
0.14
2.2
110
150
82
North Kavanagh
Nugent
Emily Star
TOTAL
Notes:
1.
Due to effects of rounding, total numbers may not sum
2.
Tonnage and metal are rounded to the nearest 1,000 tonnes, grades are rounded to 2 significant figures
3.
Mineral Resource is Reported at a 0.4% Cu Cut Off Grade for all Mine Areas
4.
Mineral Resource is depleted for mining as at 30 June 2024
5.
Mine depletion refers to current Kavanagh UG operation, and historical Giant Pit, Nugent and Emily Star open
pits
The information is extracted from the report entitled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in
Copper Mineral Resource Endowment’ released on 18 October 2024 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
APPENDIX A – Mineral Resource and
Ore Reserve estimate
Kanmantoo Ore Reserve as at 31st August 2024
Mine Area
Kavanagh
Nugent
Total Ore
Reserve
(Kavanagh +
Nugent)
JORC
Classification
Tonnes
(kt)
Cu
(%)
Cu
Au
Au
Ag
Bi
Metal Metal
(ppm) (ppm) (ppm)
(kt)
(koz)
Proved
1,100
1.01
0.04
2.82
220
12
1
Probable
Proved +
Probable
Kavanagh Total
Proved
1,000
0.88
0.15
2.7
140
9
5
2,100
0.95
0.09
2.76
180
21
6
-
-
-
-
-
-
-
Probable
Proved +
Probable Nugent
Total
Proved
670
0.76
0.33
1.44
79
5
7
670
0.76
0.33
1.44
79
5
7
1,200
1.01
0.04
2.82
220
12
1
1,700
0.83
0.22
2.21
110
14
12
2,800
0.91
0.15
2.45
160
26
14
Probable
Proved +
Probable
Notes:
1.
Dry metric tonnes.
2.
0.6% Copper (Cu) design cut-off grade.
3.
No Probable Ore Reserve was derived from Measured Mineral Resource.
4.
Minimum stope mining width 5.0m apparent.
5.
Grades are rounded to two decimal places. Tonnages are rounded to two significant figures.
6.
Any minor apparent discrepancies for sums in the table are related to rounding.
7.
The period for economic extraction is from Sept 2024 until April 2027.
8.
Ore Reserve converted from Mineral Resource is based on the October 2024 Mineral Resource report by Caitlin
Rowett (Hillgrove Resources Limited) and Sonia Konopa (ERM) titled “Kavanagh, Nugent & North Kavanagh
Underground Mineral Resource Estimate", as at 30th September 2024.
9.
Competent Person: Tom Bailey MAusIMM (#206304).
10. Mining has commenced and observed ground conditions have been very good. Further geotechnical
investigation is required to increase confidence in the stable mining spans.
The information is extracted from the report entitled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in
Copper Mineral Resource Endowment’ released on 18 October 2024 and is available to view on the Hillgrove Website
https://www.hillgroveresources.com.au/announcements. The Company confirms that it is not aware of any new information
or data that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
APPENDIX B – JORC Table 1
APPENDIX B – JORC Table 1
Section 1
Sampling Techniques and Data
Criteria
Commentary
Sampling
•
techniques
•
Reverse circulation (RC) and diamond drill hole (DD) samples collected by Hillgrove Resources personnel have been used for
the geological interpretation and estimation.
Drill hole sampling was conducted as per the Hillgrove Resources procedures and QAQC protocols.
RC Drilling:
• 2004 to 2007 drilling:
• A rig mounted 75/25 splitter was used to collect a bulk sample and smaller split sample (3-4kg) directly off the drill rig at 1m
intervals. The split sample was then split down manually if required using a cone or riffle splitter to generate a sample of ~3kg.
• 1m intervals were assayed with samples being prepared by Genalysis Laboratories in Adelaide. Each sample was pulverised
to ~95% passing -75µm and the remaining pulp shipped to Genalysis Perth for analysis.
• 2011 – 2012 drilling:
• 1m bulk samples were collected during drilling with smaller split samples (3-4kg) for assay being collected primarily using a
cone or riffle splitter directly off the rig.
• Specific target intervals and/or samples exhibiting visible mineralisation were assayed at 1m intervals. All other sample
intervals were composited (using spear sampling) to 4m intervals for assaying. On return of assay results, the 4m composite
results were examined and any 4m composites returning an economic copper grade (>0.2%) were re-assayed using the
original 1m samples (collected from original bulk sample using spear sampling to produce a representative 1.5kg to 3kg
sample).
• Samples were prepared by ALS Adelaide with each sample being riffle split to a maximum size of 3kg then pulverised split to
85% passing 75µm or better and then shipped to ALS Perth for assay.
Diamond core
2004 – 2010 drilling:
• Core samples were sawn in half using a diamond core saw. A small percentage of core samples were sawn in quarters.
Sampling was undertaken at 1m intervals or to geological boundaries as determined by the supervising geologist. Half or
quarter core samples were sent for assay and the remaining core kept in core trays for future reference.
• Samples were prepared by Genalysis Laboratories in Adelaide using a jaw crusher to ~2mm. Each sample was then
pulverised to ~95% passing -75 µm and the remaining pulp shipped to Genalysis Perth for assaying.
Diamond core
2017 - 2023 drilling:
• Core samples were sawn in half using a diamond core saw. A small percentage of core samples were sawn in quarters.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
APPENDIX B – JORC Table 1
Sampling was undertaken at 1m intervals or to geological boundaries as determined by the supervising geologist. Half or
quarter core samples were sent for assay and the remaining core kept in core trays for future reference.
• Samples were prepared by ALS Laboratories in Adelaide using a jaw crusher to ~2mm. Each sample was then pulverised to
~95% passing -75 µm and the remaining pulp shipped to ALS Perth for 4-acid digest ICP-MS assaying.
Diamond core
Underground Diamond Drilling:
• The UG Diamond Drill Hole (DDH) sampling was conducted as per the Hillgrove Resources procedures and QAQC
protocols.
• Sample intervals from 1.25m to 0.25m as determined by geology through visibly mineralised zones.
• Where samples are despatched to ALS the sample intervals are split from the drill core, with the drill core sawn in half
with a diamond core saw and half-core sample crushed to 75% < 2mm by ALS’s Boyd Crusher
• Where samples are assayed by the on-site XRF, the whole interval of drill core is crushed to 75% < 2m by Hillgrove’s
Orbis OM100 Crusher
Drilling
techniques
Drill sample
recovery
Drillhole Type
Drill Date
Diamond
All
RC
2004 & 2007
2011 & 2012
Drillhole Type
Diamond
Drill Date
2017 - 2024
Bit Size
HQ from surface to fresh, then NQ to end of
hole
5.75”
4.5”
% Oriented
Orientation Method
97%
Spear
NA
NA
NA
NA
Bit Size
HQ pre-collar from surface to 200m depth
NQ from pre-collar to EOH
Up to 12 wedges per parent hole
NQ Drilled from UG
% Oriented
97%
Orientation Method
ACE Tool
2021+
• Diamond (UG)
RC Drilling:
• Sample recovery or the occurrence of wet samples is not recorded in the drill hole database although communications with
Exploration Personnel and field observations indicate that sample recovery or wet samples were rarely a problem.
Diamond Core:
• Diamond core recovery is recorded by Hillgrove Field Technicians during metre marking and orientation of all holes. Results
demonstrate good recoveries with an average recovery rate of 99%. Core loss generally occurs in the upper sections of holes
throughout the oxidised and transitional material. Core loss at depth is generally associated with a low Rock Quality
Designation (RQD) value, suggesting the interval represents a shear or fault zone.
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
APPENDIX B – JORC Table 1
•
Logging
•
•
•
•
•
Sub-sampling
techniques and
sample
preparation
RC holes
• Sub-sampling as described in the “Sampling Techniques” section above.
Diamond holes
• Sub-sampling as described in the “Sampling Techniques” section above.
•
•
Quality of assay
All drill core was logged for lithology, alteration, weathering and mineralisation by Hillgrove geologists in accordance with
Hillgrove’s Core Logging Procedure. Colour and any additional qualitative comments are also recorded.
All diamond core trays were photographed before sampling and these photographs are stored on the Hillgrove server.
Both drill core and RC chip trays are stored on site in a core yard facility.
All geological logging is recorded into Geobank (a database product from Micromine) templates and visually validated
before being imported into the Hillgrove drill hole database. Additional validation is conducted automatically on import.
In addition, a geotechnical log of all drill core is recorded utilising standard geotechnical logging indexes. RQD is 98100%. UG drill core is not oriented. Where required, orientation of structure relative to the dominant S2 foliation is
recorded.
Selected Holes also have magnetic susceptibility readings at 1m intervals.
Field Duplicates were collected via manual splitting of the bulk sample with a riffle or cone splitter if available or by spear sampling.
All field duplicates for drilling from 2011 onwards were collected using spear sampling. Analysis of the field duplicate results
indicates that this method of duplicate sample collection is satisfactory.
Hillgrove have detailed sampling and QAQC procedures in place to ensure sample collection is carried out to maximise
representivity of the samples, minimise contamination and to maintain sample numbering integrity.
•
data and
laboratory tests
•
•
•
•
Pre 2011, all samples were submitted to Genalysis for analysis. Gold was determined by fire assay by flame AAS (FA50) and
copper analysed via a mixed acid digest (method AT) with determination by Optical Emission Spectrometry (OES). If the
copper result was greater than 1%, the analysis was repeated using a slightly modified mixed acid digestion technique
(method AX).
Post 2011 samples were submitted to ALS Perth for assaying by four acid digest with Atomic Absorption Spectroscopy (AAS)
and gold was analysed via fire assay and Atomic Absorption Spectroscopy (AAS).
Approximately 20% of the total samples used for this estimation were assayed using a double acid aqua regia digest with an
ICPOES finish (a method which does not guarantee complete dissolution of sample). A re-assay program was undertaken in
2011 which detected no bias between the results of the double acid aqua regia digest and the mixed acid digestion results.
The QAQC of sample preparation and analysis processes were via the following samples:
Certified reference materials (CRMS) inserted into the sample sequence at a frequency of one in 20.
Field duplicates inserted at a rate of one in every 20 samples.
Blanks inserted at a rate of one in every 20 samples.
Laboratory QAQC samples were inserted with a minimum of two standards and one blank for every batch of 40
samples.
Hillgrove‘s Quality policy is that at a minimum of 5% of all samples are CRM’s, 5% of samples submitted are blanks and 5% of
Hillgrove Resources Limited ACN 004 297 116
Ground Floor, 5-7 King William Road, Unley SA 5061, Australia | T + 61 8 7070 1698 | E info@hillgroveresources.com.au
APPENDIX B – JORC Table 1
•
•
•
•
•
•
Verification of
sampling and
•
•
assaying
•
Location of data
points
samples submitted are field duplicates thus ensuring that as a minimum, 15% of all samples submitted for analysis are QAQC
samples.
Results from all returned QAQC samples provide reasonable confidence as to the accuracy of the assay results used in the
estimation. Field duplicates show a good correlation with original sample results and in general most CRM results fall within
the expected ranges.
For the samples submitted to the Hillgrove on-site laboratory, the pelletised fines samples are presented to the Olympus
XRF instrument and energised for 40 sec. The results are automatically recorded to a database.
The QAQC of sample preparation and analysis processes were via the following samples:
o Certified reference materials (CRM’s) inserted by HGO into the sample sequence at a frequency of one in 20.
OREAS standard 506 has been used to provide a CRM Standard grade of 0.444% Cu, and 0.365 g/t Au which
are relevant for the expected cutoff grades used for resource estimates across the Kanmantoo deposit.
o Results from all returned QAQC samples provide reasonable confidence as to the accuracy of the assay results
used in the estimation. >90% of assays fall within 2SD of the expected CRM mean grade for Cu and Au.
o Laboratory inserted QAQC samples were inserted with a minimum of two standards and one blank for every
batch of 40 samples.
Quartz flushes with <60ppm Cu are introduced to the crushers and bowl pulverisers within every high sulphide interval.
These are monitored and where Cu contamination of the quartz flush occurs the batch is repeated. For the holes
reported there are