Results for Half Year Ended 30 June 2025
Released
Released
Announcement PDF
Tuesday, 26 August 2025
Half Year Financial Results for the Half Year Ended 30 June 2025
Hillgrove Resources Limited (ASX:HGO) is pleased to report an improved set of financial and operational
results for the six months ended 30 June 2025, marking the Group’s first half-year of net profit since the
commencement of production of the Kanmantoo Underground Copper Mine.
Key Highlights for the Half Year are:
• $81.3 million in revenue generated from the sale of copper, gold, and silver concentrate.
• EBITDA of $14.4 million, almost double the equivalent half in the prior year.
• $12.4 million in net cash inflow from operating activities, with closing cash of $10.6 million.
• Multiple concentrate shipments successfully completed under the offtake agreement.
• Ongoing underground development continues to open new mining fronts, with a Mineral Resource
and Ore Reserve update targeted for H2 2025.
Commenting on the half year, Hillgrove’s Managing Director Mr Bob Fulker said:
“It is pleasing to see the business deliver an improved financial outcome from a full half
of production, validating the capital investment made to bring the Kanmantoo
Underground Copper Mine online. Capital mine development continues to be a focus
as the operation undertakes the Nugent acceleration project to develop the Nugent
deposit to expand the mine and increase production from 1.4mpta to 1.7-1.8mtpa. This
is expected to further expand operating margins and generate additional cashflows
given the high fixed cost nature of the operation, utilising more of the available capacity
of the 3.6mtpa processing plant.”
“As we look to the second half, we look forward to unlocking additional value through
resource growth and mine life extensions on the back of a 60,000m drilling program
currently being undertaken.”
Finance
Hillgrove delivered revenue of $81.3 million for the half (HY2024: $40.2 million). EBITDA was $14.4 million,
almost double the comparative half year (HY2024: $7.7 million), with net profit after tax of $1.5 million
(HY2024: loss of $4.7 million). Net operating cash inflows improved to $12.4 million, and the Group closed
the period with $10.6 million in cash. Hillgrove remains debt free as at 30 June 2025.
The below table outlines the key monthly operating and financial metrics:
HY2025
HY2024
Copper Produced (t)
5,545
3,412
Net Revenue (A$M)*
81,349
40,247
AIC (US$/lb sold)@.64AUD/USD
4.10
4.59
EBITDA (A$M)
14,375
7,747
Net Operating Cash Flows (A$M)
12,447
1,622
*Unsold copper concentrate at 30 June 2025 of circa 0.5k dmt.
Authorised for release by the Board of Hillgrove Resources Limited.
For more information contact:
Mr Bob Fulker
Managing Director
Tel: +61 (0)8 7070 1698
Mr Luke Anderson
Chief Financial Officer & Company Secretary
Tel: +61 (0)8 7070 1698
Interim Report
for the Half Year Ended
30 June 2025
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Contents
Page
Directors’ Report
4
Auditor’s Independence Declaration
12
Interim Financial Report
Consolidated Statement of Profit or Loss and
Other Comprehensive Income
13
Consolidated Statement of Financial Position
14
Consolidated Statement of Changes in Equity
15
Consolidated Statement of Cash Flows
16
Notes to the Consolidated Financial Statements
17
Directors’ Declaration
25
Independent Auditor’s Review Report to the Members
26
Note: All dollars in this report are Australian unless otherwise noted.
Page 3 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report
The Directors present their report on the consolidated entity consisting of Hillgrove Resources Limited
(“Hillgrove” or the “Company”) and its controlled entities (the “Group” or the “Consolidated Entity”) for the sixmonth period to 30 June 2025.
Directors
The Directors of the Company during this period and up to the date of signing were:
●
Derek Carter;
●
Murray Boyte;
●
Roger Higgins; and
●
Robert (Bob) Fulker.
Principal Activities
Hillgrove is an Australian mining company listed on the Australian Securities Exchange (ASX: HGO) and
focused on copper production from the Kanmantoo Underground Copper Mine in South Australia.
Kanmantoo Copper Mine
The Kanmantoo Copper Mine in South Australia is located 55 kilometres from Adelaide. A main highway
passes close to the project and being approximately 90 kilometres by road to Port Adelaide, enables the
trucking of copper concentrate to the port. The mine site is connected to the electricity grid and has water
supplied by the District Council of Mount Barker’s treated wastewater facility with additional water capacity
from the Murray River which provides 100% redundancy for the project.
The mine is fully permitted and has strong community support in an excellent mining jurisdiction, with
exploration upside both on the mining lease and nearby areas which provides an opportunity to further
increase the mining inventory to take advantage of forecast rising copper prices as the world decarbonises.
Environment and Community
Hillgrove continues to maintain the rehabilitated areas on the Kanmantoo Mining Lease and its established
high-quality native vegetation on surrounding properties to meet its environmental offset obligations. These
areas in total amount to 122 hectares of vegetation.
Hillgrove continues to actively engage with local communities and landowners around the Kanmantoo mine,
through regular meetings of the Kanmantoo Callington Community Consultative Committee and the Master
Planning Committee, which has the ongoing amenity of the mine site and surrounds post-closure as an
objective.
Page 4 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Production Performance
Following the successful transition to commercial production in the second half of 2024, the Kanmantoo
underground operation achieved consistent production throughout the first half of 2025, with ongoing
development of additional stoping areas and stable plant performance.
Total copper production for the half was 5,545 tonnes, representing a 63% increase on the prior
corresponding period (HY2024: 3,412 tonnes). This growth was achieved due to the continued ramp up of
operations, leading to higher tonnes mined and processed. Milled tonnes averaged approximately 110,000
tonnes per month over the period, delivering metallurgical recoveries of 95%.
Mine development advanced by 3,827 metres in H1 of 2025, a 45% increase compared to 2,643 metres in
H1 2024. Development focused on opening additional areas within the Kavanagh zone and accelerating
access to the Nugent deposit, in line with Hillgrove’s strategy to support higher throughput and operational
flexibility.
While June 2025 production was impacted by lower-grade stopes, the processing plant remained consistently
available and delivered strong recoveries. Milled tonnes increased 86% to 669,981 tonnes in comparison to
H1 2024. With higher-grade areas scheduled to be accessed in the second half of 2025, the Group anticipates
improvement in copper output, though full-year production is now expected to track toward the lower end of
the 12,000-14,000 tonne guidance range.
On 17 March 2025, the Group announced the Nugent Acceleration Project, with a planned investment of $8
million to fast-track development of the Nugent orebody. The Nugent development decline progressed well
during the period, with first ore anticipated in Q4 2025. The accelerated development of this zone is expected
to support higher production levels and operational flexibility from FY2026 onward.
HY2025
HY2024
Milled (dmt)
669,981
360,121
Copper Feed Grade (%)
0.88%
1.06%
Copper Recovery (%)
95.0%
89.7%
Copper Produced (t)
5,545
3,412
Page 5 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Exploration Activities
During the half-year ended 30 June 2025, Hillgrove Resources advanced exploration activities across the
Kanmantoo Copper Mine and regional tenements. A total of 27,627 metres of underground drilling was
completed in the period to 30 June 2025, with drilling targeting the Nugent, Kavanagh, and Valentine
systems. Results at Nugent confirmed strong mineralisation continuity, with intercepts including 21.4m @
1.79% Cu & 0.65g/t Au, extending the system at depth¹.
An updated Exploration Target, released in February², set out key 2025 priorities, including drilling at Emily
Star, Valentine, and extensions to existing lodes. Maiden drilling at Valentine commenced in April, delivering
encouraging initial results³.
Regionally, early-stage exploration continued across the 4,187km² Southeast tenement area, with
geophysical surveys planned for the Southeast and Kanappa areas.
These activities support a broader 60,000m drilling program aimed at mine life extension and increased ore
sources for the Kanmantoo plant, currently operating at ~40% capacity. The Company completed 27,627m
of this 60,000m drilling program as of 30 June 2025.
Competent Person's Statement
The information in this report that relates to previously reported exploration drilling results were extracted
from the ASX release titled ‘New High-Grade Copper-Gold Intersections Extend Mineralisation at Nugent’
released on 24 March 2025, and the ASX release titled Extensional Drilling Identifies New Mineralisation for
previously reported intersections released 22 April 2025 and are available to view at
www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the original market announcements and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
The information in this report that relates to the planned drilling for 2025 is extracted from ASX release titled
‘2025 Kanmantoo Exploration Target Update’ dated 13 February 2025 and is available to view at
www.hillgroveresources.com.au. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the Mineral Resource Estimate in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Person's findings are presented have not been materially modified from the
original market announcements.
___________________
¹ ASX release: New High-Grade Copper-Gold Intersections Extend Mineralisation at Nugent (24 March 2025)
² ASX release: 2025 Kanmantoo Exploration Target Update (13 February 2025)
³ ASX release: Extensional Drilling Identifies New Mineralisation (22 April 2025)
Page 6 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Operating and Financial Review
Review of Consolidated Financial Results
For the half-year ended 30 June 2025, the Group delivered an underlying profit of $1.5 million, a significant
improvement compared to a loss of $4.7 million in the prior corresponding period, with revenue increasing
102% to $81.3 million. EBITDA increased by 86% to $14.4 million for HY2025 (HY2024: $7.7 million),
reflecting a full six months of production, reinforced by steady operational performance, consistent
concentrate sales, and improved cost control.
The Group’s cash balance as at 30 June 2025 was $10.6 million, up from $3.3 million as at 31 December
2024, supported by strong operating cashflows and the successful equity raise completed in May 2025 raising
net proceeds of $17.1 million. The Group remains debt-free.
Income Statement Overview
$000’s
HY2025
HY2024
Change
Revenue
81,349
40,247
41,102
Other income
293
231
62
TOTAL REVENUE
81,642
40,478
41,164
Mining costs
(39,947)
(17,035)
(22,762)
Processing costs
(10,613)
(9,453)
(1,160)
Transport and shipping
(3,474)
(1,304)
(2,140)
Other site costs
(3,328)
(2,394)
(934)
Movement in inventory stockpile valuation
(1,693)
1,416
(3,109)
Government royalties
(3,926)
(1,942)
(1,984)
Corporate costs
(4,212)
(2,002)
(2,300)
Other
(74)
(17)
(57)
TOTAL COSTS
(67,267)
(32,731)
(34,536)
EBITDA
14,375
7,747
6,628
Depreciation and amortisation
(9,462)
(10,304)
842
EBIT
4,913
(2,557)
7,470
Net interest and financing charges
(3,140)
(2,185)
(955)
Income tax benefit/(expense)
(272)
-
(272)
NET PROFIT/(LOSS) AFTER TAX
1,501
(4,742)
6,243
Page 7 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Operating and Financial Review (continued)
Revenue
Revenue for the six months to 30 June 2025 was $81.3 million, an increase of $41.1 million on the prior
corresponding period (HY2024: $40.2 million). The increase reflects a full six-month period of production and
sales from the Kanmantoo Underground Copper Mine, compared to the prior period which included only four
months of sales following first production in February 2024.
Revenue was underpinned by solid underground mine performance, with steady production and mill
throughput during the period. Copper concentrate sales accounted for the majority of revenue, supplemented
by by-product credits from gold and silver. The increased production resulted in additional concentrate
shipments compared to the prior half. The Group continues to benefit from stable operations and favourable
metallurgical recoveries.
Other income for the period was $0.3 million (HY2024: $0.2 million), primarily comprising interest received
and ongoing release of the government grant income.
Costs
Total operating costs for the period were $67.2 million (HY2024: $32.7 million), reflecting a full half-year of
costs as the operation.
Mining costs of $39.9 million (HY2024: $17.0 million) reflect a full half-year of underground mining activity,
including stoping, development, ground support, and mining support services. Costs reflect increased
physical activity and mine throughput relative to the prior period.
Processing costs increased to $10.6 million (HY2024: $9.4 million), consistent with higher plant utilisation
across the half-year. While volumes processed were materially higher, cost growth was moderated by
operating efficiencies and improved control over key consumables. This reflects the higher fixed cost nature
of the processing activities with significant available capacity.
Transport and shipping costs of $3.4 million (HY2024: $1.3 million) correspond to the increased number of
shipments of copper concentrate during the period, compared to the first half of 2024.
Other site costs increased to $3.3 million (HY2024: $2.4 million), reflecting a ramp-up in site personnel,
regulatory compliance costs, and general operating support functions.
The movement in inventory stockpile valuation was a negative adjustment of $1.7 million (HY2024: positive
$1.4 million), due to timing of concentrate sales.
Government royalties of $3.9 million (HY2024: $1.9 million) were consistent with the 5% South Australian
royalty rate on gross concentrate revenue less allowable deductions.
Corporate costs increased to $4.2 million (HY2024: $2.0 million), primarily driven by $1.0 million in financing
charges, $0.7 million in group-wide support functions including growth initiatives, $0.4 million related to
corporate restructuring and staffing, and $0.2 million for IT and cybersecurity infrastructure upgrades.
Page 8 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Operating and Financial Review (continued)
Cash Flow Overview
$000’s
HY2025
HY2024
Change
Net cash inflows from operating activities
12,447
1,622
10,825
Net cash used in investing activities
(19,394)
(12,359)
(7,035)
Net cash inflows from financing activities
14,306
7,924
6,382
Net increase/(decrease) in cash held
7,359
(2,813)
10,172
Cash and cash equivalents at the end of half year
10,619
7,427
3,192
Operating Activities Cash Flow
Net cash inflow from operating activities was $12.4 million, representing a significant increase from HY2024
($1.6 million). The result was underpinned by a full half-year of production from the Kanmantoo Underground
Copper Mine, with consistent mine development, improved stope turnover, and reliable mill performance.
Cash receipts were driven by higher copper concentrate sales from increased copper production, additional
gold and silver credits and higher copper and gold prices compared to prior year. Cash outflows related to
operating costs, site support services, and corporate overheads.
Investing Activities Cash Flow
Net cash used in investing activities totalled $19.4 million, reflecting continued investment in underground
development including the Nugent Acceleration project and sustaining capital to support mine plan delivery.
Key areas of expenditure included:
•
•
•
•
$11.9 million in capitalised development related to Kavanagh and Nugent;
$2.8 million on the Nugent Acceleration Project (in addition to the above development spend);
$1.1 million of exploration activities inclusive of $0.2 million off lease exploration; and
Capital investment in motor vehicles, tailing raises. lease assets, and other equipment.
Financing Activities Cash Flow
Net cash inflows from financing activities totalled $14.3 million (HY2024: $7.9 million), primarily comprising:
•
•
•
$17.1 million in net proceeds from the equity raising completed in May 2025;
$0.1 million in bank interest received; and
Partially offset by $2.9 million in lease liability payments.
Page 9 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Operating and Financial Review (continued)
Statement of Financial Position Overview
$000’s
30 June 2025
31 Dec 2024
Change
Cash and cash equivalents
10,619
3,260
7,359
Receivables and inventories
18,785
11,045
7,740
Property, plant and equipment
86,995
76,881
10,114
Right-of-use assets
7,358
9,237
(1,879)
Exploration
8,288
6,962
1,326
Total assets
132,045
107,385
24,660
Trade and other payables
(33,631)
(26,133)
(7,498)
Provisions
(9,693)
(9,448)
(245)
Lease liabilities
(6,551)
(8,685)
2,134
Employee benefits payable
(3,545)
(3,383)
(162)
Deferred income
(1,679)
(1,989)
310
Other financial liabilities
(16,205)
(16,176)
(29)
Total liabilities
(71,304)
(65,814)
(5,490)
Net Assets/Equity
60,741
41,571
19,170
Assets
Total assets increased by $24.7 million to $132.0 million, primarily due to continued investment in the
Kanmantoo Underground Copper Mine and the Nugent acceleration project. Property, plant and equipment
rose by $10.1 million, reflecting underground advancement and expansion of the mining fleet. Cash increased
by $7.4 million, driven by robust cash generation from operations, disciplined capital investment, and the
successful completion of an equity raise in the first half of 2025. Receivables and inventories rose mainly due
to timing of sales including an end of month shipment in June, the proceeds of which were receive at the
beginning of July. Exploration expenditure also increased from drilling at Spitfire and Kavanagh. Right-of-use
assets decreased due to depreciation and the termination of leases during the period.
Liabilities
Total liabilities increased by $5.5 million to $71.3 million as at 30 June 2025, primarily reflecting the
operational ramp-up at Kanmantoo and ongoing development activities, including the Nugent Acceleration
Project. Trade and other payables rose by $7.5 million, driven by heightened business activity and project
execution. Lease liabilities declined by $2.1 million due to payments and lease terminations. Deferred income
decreased slightly as government grant income continued to be released to the income statement. Provisions
and employee benefits experienced only minor movements. During the period, the royalty rights were
transferred from Freepoint to Vox; however, this had no impact on the accounting treatment, as reflected by
the stable financial liabilities balance.
Rounding of Amounts
The Company is of a kind referred to as ASIC Legislative Instrument 2016/191, relating to the ‘rounding off’
of amounts in the directors’ report and financial report. Amounts in the directors’ report and financial report
have been rounded off to the nearest thousand dollars in accordance with the Instrument.
Page 10 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Directors’ Report (continued)
Operating and Financial Review (continued)
Outlook
Following an improved first half marked by sustained production, increased development and exploration and
cashflow generation, Hillgrove is well positioned to build on this momentum through the remainder of 2025.
The focus remains on consolidating operational performance at Kanmantoo, improving mine productivity,
and maintaining cost discipline. Concurrently, drilling efforts will continue to test down-dip and along-strike
extensions of the Spitfire, Kavanagh, and Nugent lodes. These programs are expected to support a Mineral
Resource and Ore Reserve update in the second half, aimed at further extending mine life and strengthening
the Group’s long-term copper production outlook.
Auditors Independence Declaration
A copy of the auditor’s independence declaration as required under section 307C of the Corporations Act
2001 is set out on page 12.
This report is made in accordance with a resolution of the Directors:
Dated at Adelaide this 26th day of August 2025.
Mr Derek Carter
Chairman
Mr Robert (Bob) Fulker
Managing Director
Page 11 of 27
Auditor’s Independence Declaration
As lead auditor for the review of Hillgrove Resources Limited for the half-year ended 30 June 2025, I
declare that to the best of my knowledge and belief, there have been:
a. no contraventions of the auditor independence requirements of the Corporations Act 2001 in relation
to the review; and
b. no contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Hillgrove Resources Limited and the entities it controlled during the
period.
Julian McCarthy
Partner
PricewaterhouseCoopers
Adelaide
26 August 2025
PricewaterhouseCoopers, ABN 52 780 433 757
Level 11, 70 Franklin Street, ADELAIDE SA 5000,
GPO Box 418, ADELAIDE SA 5001
T: +61 8 8218 7000, F: +61 8 8218 7999, www.pwc.com.au
pwc.com.au
Liability limited by a scheme approved under Professional Standards Legislation.
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Consolidated Statement of Profit or Loss and Other Comprehensive
Income
For the half year ended 30 June 2025
Half Year
June 2025
June 2024
Note
$’000
$’000
Revenue
2
81,349
40,247
Other income
3
293
231
Expenses
4
(76,729)
(43,035)
Interest and finance charges
5
(3,140)
(2,185)
Gain/(loss) before income tax
1,773
(4,742)
Income tax benefit/(expense)
(272)
-
Gain/(loss) for the half year attributable to owners
1,501
(4,742)
-
-
1,501
(4,742)
Cents
Cents
Basic earnings per share
0.1
(0.2)
Diluted earnings per share
0.1
(0.2)
Other comprehensive income
Items that may be reclassified to profit or loss
Total comprehensive income for the period attributable
to equity holders of Hillgrove Resources Limited
Earnings per share for income attributable to the
ordinary equity holders of the Company:
The above consolidated statement of profit or loss and other comprehensive income should be read in conjunction with
the accompanying notes.
Page 13 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Consolidated Statement of Financial Position
As at 30 June 2025
30 June 2025
$’000
31 Dec 2024
$’000
10,619
3,260
12,546
3,715
6,239
7,330
29,404
14,305
Right-of-use assets
86,995
7,358
76,881
9,237
Exploration and evaluation expenditure
8,288
6,962
Total non-current assets
102,641
93,080
Total assets
132,045
107,385
33,631
1,080
26,133
1,114
Lease liabilities
4,310
4,343
Employee benefits payable
3,545
709
3,383
Other financial liabilities
4,666
4,470
Total current liabilities
47,941
40,801
8,613
8,334
2,241
4,342
970
11,539
631
11,706
Total liabilities
22,363
71,304
25,013
65,814
Net assets
60,741
41,571
320,111
302,711
32,397
32,128
(291,767)
60,741
(293,268)
41,571
Current assets
Cash and cash equivalents
Note
6
Trade and other receivables
Inventories
7
Total current assets
Non-current assets
Property, plant and equipment
8
Current liabilities
Trade and other payables
9
Provisions
10
Deferred Income
11
1,358
Non-current liabilities
Provisions
10
Lease liabilities
Deferred income
11
Other financial liabilities
Total non-current liabilities
Equity
Contributed equity
Reserves
Accumulated losses
Total equity
12
The above consolidated statement of financial position should be read in conjunction with the accompanying notes.
Page 14 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Consolidated Statement of Changes in Equity
For the half year ended 30 June 2025
Contributed
equity
Reserves
Accumulated
losses
Total
equity
$’000
$’000
$’000
$’000
292,947
31,166
(269,237)
54,876
Loss for the period
-
-
(4,742)
(4,742)
Other comprehensive income
-
-
-
-
-
541
-
541
9,537
-
-
9,537
Balance 30 June 2024
302,484
31,707
(273,979)
60,212
Balance 31 December 2024
302,711
32,128
(293,268)
41,571
Gain for the period
-
-
1,501
1,501
Other comprehensive income
-
-
-
-
-
269
-
269
17,400
-
-
17,400
320,111
32,397
(291,767)
60,741
Balance 31 December 2023
Transactions with owners:
Share-based compensation
Contributions of equity, net of transaction
costs
Transactions with owners:
Share-based compensation
Contributions of equity, net of transaction
costs
Balance 30 June 2025
The above consolidated statement of changes in equity should be read in conjunction with the accompanying notes.
Page 15 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Consolidated Statement of Cash Flows
For the half year ended 30 June 2025
Half-year
June 2025
June 2024
$’000
$’000
Cash receipts in the course of operations (incl. GST)
70,453
37,743
Cash payments in the course of operations (incl. GST)
(58,006)
(36,121)
Net cash inflow from operating activities
12,447
1,622
(183)
(671)
(19,211)
(11,888)
-
200
(19,394)
(12,359)
Proceeds from issue of shares (net of transaction costs)
17,048
9,697
Lease payments
(2,908)
(1,826)
166
53
Net cash inflow from financing activities
14,306
7,924
Net increase/(decrease) in cash held
7,359
(2,813)
Cash at beginning of the half year
3,260
10,240
Cash at end of the half year
10,619
7,427
Cash flows from operating activities
Cash flows from investing activities
Payments for exploration, evaluation and development
Payments for property, plant and equipment
Proceeds on disposal of property, plant and equipment
Net cash outflow from investing activities
Cash flows from financing activities
Net Interest received
The above consolidated statement of cash flows should be read in conjunction with the accompanying notes.
Page 16 of 27
Hillgrove Resources Limited
and its Controlled Entities
ACN 004 297 116
Notes to the Consolidated Financial Statements
For the half year ended 30 June 2025
1.
Basis of Preparation
This consolidated interim financial report for the half year reporting period ended 30 June 2025 has been
prepared in accordance with Accounting Standard AASB 134 Interim Financial Reporting and the
Corporations Act 2001. This consolidated interim financial report does not include all the notes of the type
normally included in an annual financial report. Accordingly, this report is to be read in conjunction with the
annual report for the year ended 31 December 2024 and any public announcements made by Hillgrove
Resources Limited during the interim reporting period in accordance with the continuous disclosure
requirements of the Corporations Act 2001. The accounting policies adopted are consistent with those of the
previous financial year and corresponding interim reporting period.
a. Going Concern
The consolidated financial statements have been prepared on a going concern basis, which assumes the
Group will be able to realise its assets and discharge its liabilities in the normal course of business.
For the six-month period ended 30 June 2025, the Group reported a net profit after tax of $1.5 million (30
June 2024: loss of $4.7 million) and a net current liability position of $18.5 million (31 December 2024: $26.5
million). The Group held cash and cash equivalents of $10.6 million as at 30 June 2025 (31 December 2024:
$3.3 million) and generated net cash inflows from operating activities of $12.4 million for the half-year (30
June 2024: $1.6 million). Net revenue for the period was $81.3 million (30 June 2024: $40.2 million), reflecting
a full half of production and multiple concentrate shipments from the Kanmantoo Underground Copper Mine.
Operationally, production consistency and throughput continued to improve, with Kanmantoo now operating
at steady state. Current cash flow forecasts indicate the Group is expected to generate positive operating
cash flows and increase cash reserves over the next twelve months. Based on these forecasts, the Group
anticipates meeting its obligati