Mutooroo Renamed Coburn, Metallurgical Test Work Derisks PFS
Released
Released
Announcement PDF
1 of 13
07 OCTOBER 2026
MUTOOROO RENAMED COBURN, METALLURGICAL TEST WORK DERISKS PFS
• Project renamed from Mutooroo to Coburn following stakeholder consultation.
• Metallurgical test work confirms Coburn mineralisation amenable to Kanmantoo processing flowsheet.
• Copper (Cu) recoveries >90% and gold (Au) recoveries >50% achieved using the current Kanmantoo
flowsheet and reagent suite.
• Metallurgy substantially derisked, supporting progression of the Coburn Pre-Feasibility Study (PFS).
Kantra Copper Limited (Kantra or Company) (ASX:KAN) is pleased to announce the renaming of the Mutooroo copper
project to the Coburn copper project (Coburn) and advise that the metallurgical test program completed as part of the
Coburn PFS has successfully demonstrated that Coburn mineralisation is amenable to processing through the existing
Kanmantoo processing plant utilising the current flowsheet and reagent suite. The results materially reduce
metallurgical risk and represent an important milestone in Kantra's assessment of the project.
Commenting on the Coburn name change and metallurgical test results, Kantra CEO and Managing Director,
Bob Fulker said:
“This is a significant milestone for the Coburn PFS. Importantly, the results demonstrate that Coburn
mineralisation can be processed through the existing Kanmantoo plant utilising the current flowsheet and
reagent suite, achieving strong copper and gold recoveries.
“The work has substantially reduced metallurgical risk and supports our strategy of leveraging existing
infrastructure to unlock value from Coburn.
“As we advance the PFS, we have also renamed the project from Mutooroo to Coburn. The new name
establishes a distinct identity while maintaining a connection to the local region. It reflects feedback
received through our stakeholder engagement activities.
"With metallurgy now derisked, our focus is turning to derisking rail logistics and the initial drilling program,
with the objective of reaching an outcome during the December Quarter."
Project Name Change to Coburn
As part of its ongoing stakeholder and community engagement activities, Kantra and Havilah Resources Limited
(Havilah) have agreed to rename the Mutooroo copper project as Coburn copper project.
The name change follows consultation with local landholders and community stakeholders, who expressed a
preference for the project to have a distinct identity while maintaining a connection to the local region.
The new name draws inspiration from the nearby township of Cockburn in far north-eastern South Australia, with the
phonetic spelling "Coburn" adopted to create a distinctive and readily recognisable project identity as the PFS
progresses.
The project remains subject to the staged Farm-In Agreement (FIA) announced on 21 May 2026 with Havilah1
.
1 Refer to ASX announcement titled ‘Hillgrove and Havilah Enter Mutooroo Partnership’, dated 21 May 2026.
2 of 13
Metallurgical Test Program
The metallurgical program utilised existing Coburn drill core and was designed to assess the suitability of processing
Coburn mineralisation through the existing Kanmantoo processing plant.
Laboratory-scale test work was undertaken at an industry leading laboratory using a flowsheet equivalent to the current
Kanmantoo process configuration and utilised the same reagent suite currently employed at the operation.
Key outcomes included:
• Cu recoveries exceeding 90%; and
• Au recoveries exceeding 50%.
The metallurgical test work and associated results have been independently peer reviewed, providing confidence in the
application of the outcomes to the ongoing Coburn PFS pending further studies into the variability of the deposit
following further targeted drilling results.
Further optimisation is currently underway, including assessment of optimal grind size for Coburn mineralisation and
the possibility of co-mingling Coburn mineralisation and Kanmantoo ore. These studies are intended to identify
opportunities to further improve plant utilisation and overall processing performance.
Based on the positive outcomes of the test program, Kantra considers metallurgy to be substantially derisked for the
purposes of the current phase of the Coburn PFS.
Rail Logistics
Kantra continues to progress rail logistics studies aimed at derisking the transport solution between Coburn and
Kanmantoo.
As part of this process, the Company is undertaking assessments of the capital requirements associated with rail siding
infrastructure and refining transport operating cost assumptions. Initial assessments are expected to be completed in
the December Quarter and will provide further guidance on capital and transport operating costs for incorporation into
the Coburn PFS.
Drilling
Kantra is preparing a targeted initial drilling program at Coburn to support ongoing study activities and further derisk
project development.
The program is expected to comprise approximately 1,000 metres of drilling across 6 to 8 holes and is scheduled to
commence in late October 2026, following completion of a geophysical survey planned for early October.
The drilling program has been designed to:
• Identify geological domains and provide additional metallurgical samples from across the deposit to assess
potential variability in metallurgical performance;
• Generate material for tailings characterisation test work required to support future Program for Environment
Protection and Rehabilitation (PEPR) and tailings storage facility studies;
• Validate key geological and technical datasets used in ongoing project evaluation; and
• Support the design of future drilling aimed at evaluating mineralisation at depth, informed by the results of the
upcoming geophysical survey.
The program will contribute toward Kantra's minimum drilling commitments under the FIA.
3 of 13
Other Activities
A recent airborne survey has been completed to support environmental baseline studies and ensure these workstreams
do not become a critical path item in future project advancement.
The Company is continuing engagement with local stakeholders and community groups as part of its broader
assessment of Coburn.
Authorised for release by the Board of Kantra Copper Limited.
Engage with this announcement at the Kantra Copper Investor Hub.
For more information contact:
Mr Bob Fulker Mr Luke Anderson
Chief Executive Officer & Managing Director Chief Financial Officer & Joint Company Secretary
T: +61 (0)8 7070 1698 T: +61 (0)8 7070 1698
Ms Jane Brunton
Head of Investor Relations & Growth
T: +61 (0)8 7070 1698
E: info@kantra.com
Forward Looking Statement
This Report contains or may contain certain forward-looking statements and comments about future events, that are
based on Kantra's beliefs, assumptions and expectations and on information currently available to management as at
the date of this presentation. Often, but not always, forward-looking statements can generally be identified by the use
of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook", and
"guidance", or similar expressions, and may include, without limitation, statements regarding plans, strategies and
objectives of management, anticipated production and production potential, financial forecasts, product quality
estimates of future Mineral Resources and Ore Reserves. Such statements are only expectations or beliefs and are
subject to inherent risks and uncertainties which could cause actual values, results or performance achievements to
differ materially from those expressed or implied in this announcement. Where Kantra expresses or implies an
expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a
reasonable basis. No representation or warranty, express or implied, is made by Kantra that the matters stated in this
presentation will in fact be achieved or prove to be correct. Except as required by law, Kantra undertakes no obligation
to provide any additional or updated information or update any forward-looking statements whether as a result of new
information, future events, results or otherwise. Readers are cautioned against placing undue reliance on forward-
looking statements. These forward-looking statements are not guarantees of future performance and involve known and
unknown risks, uncertainties, assumptions and other important factors, many of which are beyondthe control of Kantra,
the directors, and management of Kantra. These factors include, but are not limited to difficulties in forecasting
expected production quantities, the potential that any of Kantra's projects may experience technical, geological,
metallurgical and mechanical problems, changes in market prices and other risks not anticipated by Kantra, changes
in exchange rate assumptions, changes in product pricing assumptions, major changes in mine plans and/or resources,
changes in equipment life or capability, emergence of previously underestimated technical challenges, increasedcosts,
and demand for production inputs.
4 of 13
Competent Person's Statement
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Kantra is subject to
Australian disclosure requirements and standards, including the requirements of the Corporations Act and the ASX.
Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and mineral
resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code).
The information in this announcement that relates to Exploration Results is based on data and information compiled by
geologist Dr Chris Giles, a Competent Person who is a member of The Australian Institute of Geoscientists. Dr Giles is
Technical Director of Havilah Resources, a full-time employee and is a substantial shareholder. Dr Giles has sufficient
experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activities
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’. Dr Giles consents to the inclusion in the announcement
of the matters based on his information in the form and context in which it appears. Havilah Resources confirms that
all material assumptions and technical parameters underpinning the Exploration Results continue to apply and have
not materially changed. Havilah confirms that it is not aware of any new information or data that materially affects the
information included in the relevant ASX announcements.
The information in this release that relates to the metallurgical test work is based upon information compiled by Glenn
Norris, who is a Member of The Australasian Institute of Mining and Metallurgy. Glenn Norris is a full-time employee and
holds equity in Kantra Copper Limited and has sufficient experience relevant to the styles of mineralisation and type of
deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Glenn Norris has consented to
the inclusion in the release of the matters based on their information in the form and context in which it appears.
The information in this report that relates to the previous exploration release “Further Positive Mutooroo Study Program
Results” dated 21 May 2025 is available to view at www.havliah-resources.com.au. Havilah confirms that it is not aware
of any new information or data that materially affects the information included in the original market announcement
and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate in the
relevant market announcement continue to apply and have not materially changed.Havilah confirms that the form and
context in which the Competent Person's findings are presented have not been materially modified from the original
market announcements.
5 of 13
APPENDIX A – DRILL HOLE INFORMATION
Table 1 List of drillhole collar details for holes sampled for metallurgical test works2
Hole Number Easting m Northing m RL m Grid azimuth Dip degrees EOH depth metres
MTRCD261 493604 6431347 251 96 -60 216.8
MTRCD269 493635 6430896 251 113 -65 114.8
MTRCD270 493534 6430781 250 113 -65 167.3
MTRCD272 493637 6430998 248 112 -64 198.8
MTDD276 493594 6430809 250 113 -60 132.3
Datum: GDA94 Zone 54.
Note: All azimuths and dips are as measured at surface; deviations from this typically occur at depth.
JORC CODE, 2012 EDITION – TABLE 1
Section 1 Sampling Techniques and Data
Criteria Commentary
Sampling techniques • Metallurgical samples were derived from Havilah diamond drillcore for 5 diamond drillholes as documented in the table above.
• All diamond drill samples were from HQ size drillcore that was logged on site and was sent to Adelaide to be photographed and halved and/or
quartered by diamond saw.
• Quartered drillcore samples were collected into pre-numbered calico bags and sent to the ALS assay lab in Adelaide.
2
Refer to Havilah ASX announcement of 21 May 2025. Havilah confirms that the details for these drillholes listed in the above table have not materially changed since they were originally reported.
6 of 13
Criteria Commentary
• At the assay lab the samples are crushed in a jaw crusher to a nominal 10mm (method PR102) from which a 3kg split is obtained using a riffle
splitter. The split is pulverized in an LM5 to minimum 85% passing 75 microns (method PR303). These pulps are stored in paper bags.
• All samples were analysed for gold by 30g fire assay, with AAS finish using ALS method Au-aa25 and a range of other metals by ALS method
MEMS 61.
• The core used to generate the testing composites (flotation and comminution) for the Kantra 2026 program was selected from primary
pyrrhotite-chalcopyrite domain material provided to Kantra by Havilah and appropriate intervals selected to obtain an overall copper and
gold composition closer to the Resource composition (very high-grade intervals not included).
• The selected HQ core samples (see Table 2) were combined in large plastic bags which were then sealed. These bags were then placed in
buckets labelled Mutooroo flotation composite and Mutooroo comminution composite which were also sealed and were delivered to Bureau
Veritas minerals laboratory in Adelaide for metallurgical test work directly by G Norris at the commencement of the program.
Drilling techniques • Diamond drilling of HQ size (63.5 mm), usually as tails to RC precollar holes.
• MJ Drilling was contracted for the diamond drillholes.
• Standard tube collection and most holes were oriented.
Drill sample recovery • Sample recoveries for diamond drilling was continuously monitored by the geologist on site in order to effect adjustments to drilling
methodology to optimize sample recovery and quality if necessary.
• In general, core recoveries were excellent, with almost 100% recovery in the mineralised intervals. The sample yield and quality of the
diamond drilling samples was routinely recorded in drill logs.
• The site geologist and Competent Person consider that overall, the results are acceptable for interpretation and metallurgical sampling
purpose
Logging • The drillcore was logged in detail by an experienced geologist directly into a digital logging system with data uploaded directly into an Excel
spreadsheet.
• Logging is semi-quantitative and 100% of reported intersections have been logged and photographed.
7 of 13
Criteria Commentary
• Logging is of a sufficiently high standard to support any subsequent interpretations, resource estimations and mining and metallurgical
studies.
Sub-sampling techniques
and sample preparation
• Quarter core was submitted for assay in to obtain results that would allow selection of representative half core samples for metallurgical
studies.
• Samples were collected in numbered calico bags that were sent to ALS assay lab in Adelaide.
• At ALS assay lab the samples are crushed in a jaw crusher to a nominal 10mm (method CRU-42a) from which a 3kg split is obtained using a
riffle splitter. The split is pulverized in an LM5 to minimum 85% passing 75 microns (method PUL25e). These pulps are stored in paper bags.
• All samples were analysed for gold by 30g fire assay, with AAS finish using ALS method Au-aa25 and a range of other metals by ALS method
ME MS61.
• Quality control procedures include the insertion of standards, blanks and duplicates into the regular sample number sequence
(approximately 1 in 20 samples). The blanks, standards and duplicates are subject to rigorous statistical checks and if any are out of spec,
re-assay of retained samples is requested of the laboratory as a first step. For the present program the QAQC report did not identify any
material deviations in either accuracy or precision of the lab analyses.
• Sampling size is considered to be appropriate for the style of mineralisation observed. Assay repeatability for gold and other metals has not
proven to be an issue.
• All sample pulps are retained by Havilah so that check or other elements may be assayed using these pulps in the future.
• The drill core samples received by Bureau Veritas (BV) for the 2026 test-work consisted of material from the primary pyrrhotite-chalcopyrite
domain of the Resource for the purpose of this initial test-work. Details on the holes selected are provided in Table 2Mutooroo Massive Sulphide
Ore Drillcore Used in Phase 1 section. Further geological domaining and variability studies are planned for Phase 2 of the PFS.
• The flotation composite core samples were crushed to -3.35mm at BV and blended by passing through a rotary splitter three times after
which it was split into 46 x 1 kg charges for flotation test-work.
• The comminution composite core samples were provided separately to BV and were prepared at BV in line with BWi, CWi, Ai and SMC
comminution tests.
8 of 13
Criteria Commentary
Quality of assay data and
laboratory tests
• All samples are prepared at ALS laboratory in Adelaide and assayed at the ALS Perth Hub Lab. The total assay methods are standard ALS
procedure and are considered appropriate for resource reporting.
• All gold was determined by fire assay method Au-aa25 with AAS finish.
• Other elements were analysed by multi-element digest methods with MS finish.
• Quality assurance and control (QA/QC) procedures include the insertion of standards, blanks and duplicates into the regular sample number
sequence (approximately 1 in 20 samples). The blanks, standards and duplicates are subject to rigorous statistical checks and if any are out
of spec, re-assay of retained samples is requested of the laboratory as a first step. For the present program the QA/QC report did not identify
any material deviations in either accuracy or precision of the lab analyses.
• ALS also insert its own QA/QC samples into the sample sequence. Fire assay method Au-aa25 is a total gold analysis.
• Assay data accuracy and precision was continuously checked through submission of field and laboratory standards, blanks and repeats
which were inserted at a nominal rate of approximately 1 per 20 drill samples.
• Assay data for laboratory standards and repeats have been previously statistically analysed and no material issues were noted.
• For the metallurgical test-work program sample batches contained a reference standard, a blank and a repeat sample in line with BV
procedures.
Verification of sampling
and assaying
• Rigorous internal QC procedures are followed to check all assay results.
• All data entry is under control of the responsible geologist, who is responsible for data management, storage and security.
• No adjustments to assay data are carried out.
• Oversight of the flotation test-work program at BV was undertaken by G Norris and Ben Alexander, representatives of Kantra Copper.
Location of data points • The holes were surveyed using an electronic downhole camera.
• Present drillhole collar coordinates were surveyed in UTM coordinates using a GPS system with an x:y:z accuracy of <5m and are quoted in
GDA94 Zone 54 datum.
• A differential GPS system with an x:y:z accuracy of 20cm:20cm:40cm will be used to obtain the final drillhole locations used in the database.
9 of 13
Criteria Commentary
Data spacing and
distribution
• The objective of the diamond coring program was to obtain representative samples for metallurgical test work, to carry out geotechnical
studies and to twin earlier Havilah RC drillholes in order to check for any systematic bias inherent in the different drilling methods.
• Hence placing of holes to achieve the above objectives was the main consideration rather than hole spacing.
• Sample compositing was not used.
Orientation of data in
relation to geological
structure
• The drillhole azimuth and dip were chosen to intersect the interpreted mineralised zones as nearly as possible to right angles and at the
desired positions to maximise the value of the drilling data.
• At this stage, no material sampling bias is known to have been introduced by the drilling direction.
Sample security • After cutting, the quarter core samples were placed directly in pre-numbered calico bags by experienced personnel for despatch by courier
to the assay lab.
• Several calico bags are placed in each polyweave bag which are then sealed with cable ties. The samples are transported to the assay lab by
Havilah personnel at the end of each field stint.
• There is minimal opportunity for systematic tampering with the samples as they are not out of the control of Havilah personnel until they are
delivered to the assay lab.
• This is considered to be a secure and reasonable procedure and no known instances of tampering with samples occurred during the drilling
programs.
• The metallurgical samples were delivered to the BV laboratory directly by G Norris at the commencement of the program.
Audits or reviews • Ongoing internal auditing of sampling techniques and assay data has not revealed any material issues.
• The metallurgical test-work results were reviewed by an independent metallurgical/mineralogical consulting firm and revealed no material
issues.
10 of 13
Section 2 Reporting of Exploration Results
Criteria Commentary
Mineral tenement and land
tenure status
• Security of tenure is via current exploration licence EL 6592 over the Mutooroo deposit, which is in good standing.
• The diamond drilling was carried out under an MOU with JX Advanced Metals Corporation, which has since lapsed.
• A Native Title Exploration Agreement is in place for the Mutooroo Project Area. The agreement was executed between Havilah and Wilyakali
Native Title Aboriginal Corporation.
• In May 2026 Havilah and Kantra Copper entered into a Farm-In Agreement with Kantra Copper to complete a Pre-Feasibility Study.
Exploration done by other
parties
• Mutooroo was historically mined for oxide and supergene copper to shallow depths in the late 1800’s and early 1900’s. The area has been
explored by a number of groups in the past including Mines Exploration Pty Ltd (Broken Hill South), Noranda, Adelaide Wallaroo and CRAE.
Broad spaced drillholes were completed at the prospect area during the mid-1960’s by Mines Exploration Pty Ltd.
• All previous exploration data has been integrated into Havilah’s databases.
Geology • The mineralisation style is massive sulphide lode style copper-cobalt-gold mineralisation within Broken Hill Domain rocks of the
Curnamona Province.
• The massive sulphide lode has formed by hydrothermal solutions migrating up a shear zone formed at or near the contact between
amphibolite and gneiss.
Drill hole Information • A single composite sample of the primary pyrrhotite-chalcopyrite domain using available core from a previous drill program, conducted
by Havilah Resources (HAV ASX release 21 May 2025) was generated for the purpose ofthe Kantra Copper Mutooroo“Phase 1 metallurgical
test-work program”.
• Relevant information for the drillholes from which the metallurgical test samples were taken is provided in Table 1 above.
• Table 2 below outlines the drill hole identification numbers and intervals used to generate the composite sample. Approximately half of
each sample was used for composite generation and the balance retained for future use. This compositing was undertaken by G Norris at
the Kanmantoo mine site metallurgical laboratory.
11 of 13
Criteria Commentary
• Appropriate intervals were selected based on assays provided by Havilah Resources to obtain an overall copper and gold composition
closer to the Resource composition (very high-grade intervals not included).
Table 2 Mutooroo Massive Sulphide Ore Drillcore Used in Phase 1
DHID From To Sample No Au (g/t) Cu (%) Co (ppm) meters
MTDD276 96 97 MTC01587 0.11 2.40 2,250.0 1.0
MTDD276 112 113 MTC01606 0.18 2.31 2,330.0 1.0
MTDD276 113 114 MTC01607 0.18 2.16 2,070.0 1.0
MTDD276 102 103 MTC01594 0.12 2.02 2,090.0 1.0
MTDD276 99 100 MTC01590 0.15 1.95 2,520.0 1.0
MTDD276 108 108.5 MTC01600 0.24 1.79 2,290.0 0.5
MTDD276 97 98 MTC01588 0.08 1.59 2,260.0 1.0
MTDD276 98 99 MTC01589 0.42 1.58 2,160.0 1.0
MTDD276 110 111 MTC01604 0.34 1.54 2,150.0 1.0
MTDD276 109.3 110 MTC01602 0.15 1.50 2,220.0 0.7
MTDD276 107 108 MTC01599 0.36 1.46 2,340.0 1.0
MTDD276 115 116 MTC01610 0.13 1.45 2,010.0 1.0
MTDD276 106 107 MTC01598 0.17 1.40 2,320.0 1.0
MTDD276 118.6 119.6 MTC01616 0.14 1.35 2,710.0 1.0
MTDD276 100 101 MTC01592 0.2 1.09 2,560.0 1.0
MTRCD261 192.6 193.3 MTC01543 0.36 2.46 1,660.0 0.7
MTRCD269 103.05 104 MTC01561 0.23 2.66 1,790.0 1.0
MTRCD269 104 105 MTC01563 0.1 2.07 1,710.0 1.0
MTRCD270 133.4 134.4 MTC01508 1.19 2.57 2,110.0 1.0
MTRCD270 130.27 130.9 MTC01504 0.31 2.28 1,900.0 0.6
MTRCD270 132.4 133.4 MTC01507 0.34 2.08 2,300.0 1.0
MTRCD272 117 118 MTC01647 0.09 2.32 1,580.0 1.0
Weighted average 0.25 1.90 2,159.6 20.5
12 of 13
Criteria Commentary
Data aggregation methods • Not applicable as not reporting mineral resources.
• Simple average grades over the specified intervals are reported, with no weighted aggregation of results. Reported mineralisation does not
include intervals that are considered to be of uneconomic grade in the context of adjacent mineralised intervals. This is considered
appropriate for reporting of exploration results.
• The sample composites used in the Metallurgical test work were from the primary pyrrhotite-chalcopyrite domain of the Resource for the
purpose of this initial test-work with samples selected to be of the nominal deposit average grade with a sample weighted average grade
applied for the composited samples.
• No metal equivalent values are stated.
Relationship between
mineralisation widths and
intercept lengths
• Downhole lengths are reported. Drillholes are typically oriented with the objective of intersecting mineralisation as near as possible to
right angles, and hence downhole intersections in general are as near as possible to true width.
• For the purposes of the geological interpretations and resource calculations the true widths are always used.
Diagrams • Not strictly applicable as not reporting a mineral discovery.
Balanced reporting • Accurate satellite controlled DGPS system was used to measure the location and elevation of drillhole collars.
• Exploration results are not being reported in this ASX release.
Other substantive
exploration data
• Relevant metallurgical results compiled by a Competent Person – Glenn Norris are provided in this ASX release.
• Other background geological and metallurgical information is provided in an earlier Havilah ASX announcement of 21 May 2025.
Further work • Downhole electromagnetic surveying was undertaken by Havilah shortly after drilling for selected drillholes to identify any off-hole
conductive zones that could be indicative of undrilled massive sulphide.
• Extensive metallurgical test work was completed in 2024-2025 by Core Resources for JXAM with results included in the Havilah ASX
announcement of 21 May 2025.
13 of 13
Criteria Commentary
• Additional drilling is planned to upgrade the mineral resource estimate, identify geological domains and obtain samples for further
metallurgical test work as part of the PFS currently being undertaken by Kantra Copper. Further mineralogical analysis and metallurgical
test work will be undertaken on material from these drill holes to further define the geological domains of the deposit and assess variability
of metallurgical performance across the various domains. This will further inform final metallurgical assumptions for the PFS.