Annual and Sustainability Report 2024
Released
Released
Announcement PDF
Annual &
Sustainability
Report
for the year ended 31 December
2024
www.hillgroveresources.com.au
Contents
About this report
ANNUAL REPORT
This Annual Report is a summary of Hillgrove and its subsidiaries
operations, activities and financial position as at 31 December 2024.
Currency is expressed in Australian dollars unless otherwise stated.
2024 in Review
2
About Hillgrove Resources
3
Chair and CEO and Managing Director’s Statement
4
Board of Directors and Officers
6
Operational Performance
7
Exploration Highlights
8
Mineral Resources and Ore Reserves
11
SUSTAINABILITY REPORT
We have combined our disclosures into a single Annual and
Sustainability Report to demonstrate the interconnectivity of
Sustainability with Company performance. See the Sustainability
Report within this document for information on our Sustainability
performance, boundary and scope. Current and previous reports are
available on the Company’s website at
www.hillgroveresources.com.au
Our 2024 Corporate Governance Statement is available to view at
www.hillgroveresources.com.au/corporate-governance
This Report has been approved for release by the Board
of Hillgrove Resources Limited (ASX: HGO) (‘Hillgrove’, ‘we’
or ‘the Company’).
About this Report
16
Sustainability Overview 2024
17
A Foreword from our Chair
18
Our Approach to Sustainability
19
Materiality Assessment
20
Proposed Material Sustainability Topics
21
Non-IFRS financial information
Mapping of Material Sustainability Topics
23
Our Performance, Commitments and Long-term Goals
24
Governance
25
Environment
28
Social
34
Investors should be aware that financial data in this report includes ‘non-IFRS financial
information’ under ASIC Regulatory Guide 230 Disclosing non-IFRS financial information
published by ASIC and also ‘non-GAAP financial measures’ within the meaning of
Regulation G under the U.S. Securities Exchange Act of 1934. Non-IFRS/non-GAAP
measures in this presentation include gearing, sustaining capital, major project capital, major
mine development, production cost information such as All-in Sustaining Cost and All-in
Cost. Hillgrove Resources Limited (Hillgrove) believes this non-IFRS/ non-GAAP financial
information provides useful information to users in measuring the financial performance and
conditions of Hillgrove. The non-IFRS financial information does not have a standardised
meaning prescribed by the Australian Accounting Standards (‘AAS’) and, therefore, may
not be comparable to similarly titled measures presented by other entities, nor should it be
construed as an alternative to other financial measures determined in accordance with AAS.
Investors are cautioned, therefore, not to place undue reliance on any non-IFRS/non-GAAP
financial information and ratios included in this Report. Non-IFRS financial information in this
presentation has not been subject to audit or review by the Company’s external auditor.
FINANCIAL REPORT
Directors’ Report
43
Auditor’s Independence Declaration
58
Financial Statements
59
Consolidated Entity Disclosure Statement
85
Directors’ Declaration
86
Independent Auditor’s Report to the Members
87
Shareholder Information
92
Corporate Information
94
Acknowledgement of Country
Hillgrove acknowledges the Peramangk and Kaurna people, the Traditional
Owners and Custodians of the lands on which we live and operate.
We pay our respects to Elders past and present and acknowledge their
continuing connection to waters, skies, seas and country.
Forward looking statement
This Report contains or may contain certain forward-looking statements and comments
about future events, that are based on Hillgrove’s beliefs, assumptions and expectations
and on information currently available to management as at the date of this presentation.
Often, but not always, forward-looking statements can generally be identified by the use
of forward-looking words such as “may”, “will”, “expect”, “plan”, “believes”, “estimate”,
“anticipate”, “outlook”, and “guidance”, or similar expressions, and may include, without
limitation, statements regarding plans, strategies and objectives of management, anticipated
production and production potential, financial forecasts, product quality estimates of
future Mineral Resources and Ore Reserves. Such statements are only expectations or
beliefs and are subject to inherent risks and uncertainties which could cause actual values,
results or performance achievements to differ materially from those expressed or implied
in this announcement. Where Hillgrove expresses or implies an expectation or belief as
to future events or results, such expectation or belief is expressed in good faith and on a
reasonable basis. No representation or warranty, express or implied, is made by Hillgrove
that the matters stated in this presentation will in fact be achieved or prove to be correct.
Except as required by law, Hillgrove undertakes no obligation to provide any additional or
updated information or update any forward-looking statements whether on a result of new
information, future events, results or otherwise. Readers are cautioned against placing
undue reliance on forward-looking statements. These forward-looking statements are not
guarantees of future performance and involve known and unknown risks, uncertainties,
assumptions and other important factors, many of which are beyond the control of Hillgrove,
the directors, and management of Hillgrove. These factors include, but are not limited to
difficulties in forecasting expected production quantities, the potential that any of Hillgrove’s
projects may experience technical, geological, metallurgical and mechanical problems,
changes in market prices and other risks not anticipated by Hillgrove, changes in exchange
rate assumptions, changes in product pricing assumptions, major changes in mine
plans and/or resources, changes in equipment life or capability, emergence of previously
underestimated technical challenges, increased costs, and demand for production inputs.
In 2024 we successfully transitioned into a copper producer,
with our first underground copper production at Kanmantoo
achieved in February. This milestone marks a significant
step forward in Hillgrove’s evolution.
We also achieved strong organic growth through
substantial resource expansion and
prepared to test the next suite
of high potential targets.
We are on track to achieving our
ultimate vision: becoming a mid-tier,
multi-asset Australian copper
producer, unlocking value for
a sustainable future.
HILLGROVE RESOURCES LIMITED
2024 ANNUAL REPORT
1
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
2024 in Review
Operational and Financial
COMMERCIAL
COPPER PRODUCTION
COPPER PRODUCTION
GOLD PRODUCTION
8,971
1,813
TONNES
OUNCES
OPERATING CASH FLOW
EBITDA
$21.0
$22.5
FINANCIAL FLEXIBILITY
(STANDBY DEBT FACILITY)
MILLION
MILLION
Commenced
$10 MILLION
Sustainability
TRIF
CLIMATE CHANGE
14% DECREASE
POSITION
STATEMENT
RELEASED
LOCAL
WORKFORCE 1
REHABILITATION
(Dec. 24:13.1 | Dec 23: 15.3)
95%
Progressed the Kanmantoo Grassy
Woodland Revegetation – an award
winning community collaboration
FEMALE
PARTICIPATION
18.3%
MATERIALITY
ASSESSMENT
COMPLETED
Organic Growth – Mineral Resources and Ore Reserve
MINERAL RESOURCE 2,3
MINERAL RESOURCE 2,3
96% INCREASE
138% INCREASE
Contained Copper
Contained Gold
1. Local is defined as within a 125km radius from Kanmantoo
2. Compared to 2022 Mineral Resources Estimate 7.0Mt at 1.08% containing 75,900t Cu, see ASX
announcement ‘Updated Nugent underground Mineral Resource Estimate released on 26 July 2022
3. See the Mineral Resources and Ore Reserves section in this Report for further information
2
2024 ANNUAL REPORT
HILLGROVE RESOURCES LIMITED
MAIDEN ORE RESERVE 3
2.8Mt
26kt Contained Copper
14koz Contained Gold
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
About Hillgrove Resources
Hillgrove Resources Limited (‘Hillgrove’, ‘we’ or ‘the Company’) is a growing, Australian copper
producer listed on the Australian Stock Exchange (ASX: HGO).
Our vision
To be a mid-tier, multi-asset Australian copper producer unlocking value for a sustainable future.
Our culture and values
Are pivotal to who we are and how we do business.
SAFETY
INTEGRITY
DELIVERY
We operate safely, protect each
other and the environment
and leave a positive legacy for
future generations
We are respectful, ethical
and trustworthy, we do
what is ‘right’ not just
what we have to do
We hold ourselves
accountable for the delivery
of sector leading results,
what we are known for
Our strategy
To create long-term shareholder value through:
BALANCED PROFILE
GROWTH
ASSET QUALITY
FINANCIAL STRENGTH
REPUTATION
Multi-asset, Australian
copper producer
Demonstrate growth
– organic and inorganic
Improving asset quality
through each transaction
Achieve portfolio and
growth objectives while
retaining financial strength
Deliver on promises;
operating capability;
stakeholder, investor and
ESG responsibilities
Tier 1 asset location
The Kanmantoo Copper Mine is situated in the Adelaide Hills region
of South Australia, just 55 kilometres from Adelaide and only three
kilometres from the main dual carriageway to Port Adelaide. This
strategic location offers significant advantages in both operating and
capital costs, making it easier to attract and retain a skilled workforce
that primarily resides in the area. The mine operated as a series of
open pits from 2010 to 2020, producing around 137,000 tonnes
of copper and over 55,000 ounces of gold. Operations
restarted in May 2023 with underground mining commencing
and first copper production achieved in February 2024.
The operation is fully permitted and has significant
infrastructure including a 3.6 million tonne
per annum processing plant.
ADELAIDE
EL 6526
Kanmantoo
Regional
EL 6526
Kanmantoo Mine
EL 6294
Wynarka
EL 6174
Coomandook
EL 6175
Coonalpyn
EL 6207
Tintinara
EL 6397
Laffer
A U S T R A L I A
SOUTH
AUSTRALIA
Figure 1: HGO Tenements as at 31 December 2024.
HILLGROVE RESOURCES LIMITED
2024 ANNUAL REPORT
3
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
Chair and Chief Executive Officer & Managing Director’s Statement
Dear Shareholders,
We are pleased to present the Annual and Sustainability Report
for the year ended 31 December 2024. This year has been a
pivotal one for Hillgrove, marked by significant milestones and
achievements that position us for continued growth and success.
We successfully transitioned to a copper producer, with our first
copper production achieved in February 2024 and commercial
copper production reached in July 2024. This marks a major step
forward in Hillgrove’s evolution, supported by our strategic focus
on organic growth and resource expansion.
In addition, we were excited to announce the appointment of
Bob Fulker as CEO and Managing Director who commenced on
1 July 2024. Bob brings extensive experience in operational
excellence and growth, and we are confident that his leadership
will be instrumental in driving Hillgrove’s future success.
As we continue to create long-term value for our shareholders,
we are proud to highlight our key achievements in 2024:
Operational and organic growth
XX Robust Operational Performance: Successfully
produced 8,971 tonnes of copper and 1,813 ounces
of gold in 11 months of operation
Derek Carter
Chair
We successfully transitioned
to a copper producer, with
our first copper production
achieved in February 2024 ...
Derek Carter Chair
XX Significant Resource Growth: A 96% increase in contained
copper and a 138% increase in contained gold within the
2024 Mineral Resource estimate at Kanmantoo, alongside the
release of a maiden Ore Reserve estimate
Bob Fulker
CEO and Managing Director
XX Sustainability Initiatives:
XX Exploration Advancement: Our exploration programs in
ZZ Ended all onsite diesel generation and accelerated the
2024 resulted in significant resource expansion. Our next
suite of exploration targets will be drill tested in 2025 by a
19,000-metre underground drilling program, targeting new
exploration opportunities, including down-dip extensions to
known mineralisation
reduction of Scope 2 emissions through the connection
to the South Australian grid
XX Operational Excellence: Continued focus on operational
predictability and cash flow generation, ensuring we are in a
strong position to support future growth
Financial performance
XX Cash Flow: Achieved $21.0 million in net cash flow from
ZZ Made significant progress on the Kanmantoo Grassy
Woodland Revegetation Program, creating a multikilometre greenbelt that links our mining rehabilitation
efforts with broader regional vegetation initiatives
ZZ Actively contributed to the Kanmantoo Callington
Community Consultative Committee (K4C), which
continues to be an award-winning model of stakeholder
engagement
ZZ Maintained a predominantly residential workforce and
operating activities
XX EBITDA: Reported EBITDA of $22.5 million following the
recommissioning of the Kanmantoo plant
XX Financial Flexibility: Secured a $10 million Standby Debt
Facility to provide financial stability and flexibility
Sustainability
XX Safety Improvements: Achieved a 14% reduction in Total
Recordable Injury Frequency (TRIF), though we acknowledge
the continued need to prioritise workforce safety.
welcomed 98 new employees, reinforcing our
commitment to local hiring
ZZ Maintained female employee representation of 18.3%
– we are committed to improving gender diversity and
have outlined specific actions to support this goal
ZZ Published our Climate Change Position Statement,
reaffirming our commitment to sustainability and
climate action
ZZ Completed a materiality assessment, identifying
key sustainability topics relevant to our business and
stakeholders
4
2024 ANNUAL REPORT
HILLGROVE RESOURCES LIMITED
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
Chair and Chief Executive Officer & Managing Director’s Statement cont.
Looking Forward
The successful mining ramp up and plant commissioning
at the Kanmantoo Copper Mine established a solid platform for
delivery in the calendar 2025 year. Group copper production is
expected to increase significantly in 2025 to 12,000 to 14,000
tonnes of copper due to a combination of increased quarterly
production rates and a full 12 months of production and All-in
Costs are planned to improve to 3.40 - 3.90 (US$/lb) as the
year progresses as further efficiencies are realised and mining
rates continue to ramp up. 1
Looking ahead, we are well positioned to capitalise on a
robust copper market, driven by increasing demand as a
critical mineral in the global energy transition. Our focus on a
disciplined approach to operational excellence and growth will
ensure we achieve our vision of becoming a mid-tier, multiasset Australian copper producer, unlocking value for
a sustainable future.
1. CY2025 production and All-in Cost guidance is extracted from ASX release
titled “Hillgrove Resources Limited (ASX: HGO) report for the quarter ended
31 December 2024“ dated 21 January 2024 and available to view at
www.hillgroveresources.com.au
On behalf of the Board, we would like to express our sincere
gratitude for your continued support and confidence. We also
extend our thanks to our employees, contractors, local and state
governments, and the communities that support us. Their dedication
and collaboration are vital to our ongoing success.
Sincerely,
Derek Carter
Chair
Bob Fulker
Chief Executive Officer & Managing Director
HILLGROVE RESOURCES LIMITED
2024 ANNUAL REPORT
5
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
Board of Directors and Officers
The Directors and Officers of the Company during the whole of the financial year and up to the date of this report are:
Mr Derek Carter
Mr Murray Boyte
Mr Roger Higgins
Mr Robert Fulker
Mr Joe Sutanto
Independent NonExecutive Chair /
Chair Nomination
Committee
Independent NonExecutive Director /
Chair Audit and Risk and
Treasury Committees
Independent NonExecutive Director /
Chair Remuneration
Committee
Chief Executive Officer
and Managing Director
Chief Financial Officer
and Company Secretary
BCom, MBA, CPA
BSc, MSc, FAusIMM
BCA, CA, MAICD
Derek has over 50 years’
experience in exploration
and mining geology
and management. He
held senior positions in
Burmine Ltd and the Shell
Group of Companies
where he was responsible
for discovering the Los
Santos tungsten deposit
in Spain, before founding
Minotaur Gold NL in 1993.
He resigned as Chair of
Minotaur Exploration Ltd
in November 2016. Derek
was awarded AMEC’s
Prospector of the Year
Award (jointly) in 2003
for the discovery of the
Prominent Hill coppergold deposit, the AusIMM
President’s Award and is a
Centenary Medallist. Derek
is currently the Chair of
Petratherm Limited (ASX:
PTR).
Murray has over 40 years’
experience in merchant
banking and finance,
undertaking company
reconstructions, mergers
and acquisitions in
Australia, New Zealand,
North America and Hong
Kong. Murray holds a
Bachelor of Commerce
and Administration from
the Victoria University
in Wellington and is a
member of the Australian
Institute of Company
Directors, and Chartered
Accountants Australia
& New Zealand. In
addition, Murray has
held executive positions
and directorships in the
transport, horticulture,
financial services,
investment, health services
and property industries.
Murray is currently Chair
of National Tyre & Wheel
Limited (ASX: NTD). He
retired as the Chair of
Eureka Group Holdings
Limited (ASX: EGH) on
25 February 2025, and as
a Non Executive Director
of Eumundi Group (ASX:
EBG) on 14 February 2025.
BE (Hons), MSc, PhD,
FAusIMM, FIEAust
BEng (Mining), MSc
(Mineral & Energy
Economics), FAusIMM,
Derek is a member of the
Audit and Risk and the
Remuneration Committee.
Appointed 24 April 2020.
Roger has over 50 years
of experience in the
resources industries,
including being a former
Managing Director of Ok
Tedi Mining Limited in
Papua New Guinea and
Senior Vice President
Copper at Canadian
metals and mining
company Teck Resources
Limited. He was also
Vice President and Chief
Operating Officer with BHP
Base Metals (Australia)
and held senior operations
and project positions with
BHP in Chile. He is an
Adjunct Professor with
the Sustainable Minerals
Institute, University of
Queensland. Roger is
currently a Non Executive
Director of Worley Limited
and Arafura Rare Earths.
He was also recently the
Chair of both Minotaur and
Demetallica Limited and a
Non Executive Director of
Newcrest Mining Limited.
Joe joined Hillgrove in
2011 and has held a
Bob is a highly
number of roles within
experienced Mining
the finance team, which
Engineer with 39 years of
spanned commercial
experience in the minerals and planning to financial
industry. He has held
control before becoming
Senior Executive positions the Company Secretary
at Evolution Mining and OZ and Chief Financial
Minerals, where he was
Officer in 2023. Prior
responsible for leading the to Hillgrove, Joe held a
safe and efficient delivery
number of roles which
of significant operations.
included as a corporate
Bob’s extensive experience finance executive at
spans Australia, Africa,
PwC Corporate Finance,
and Canada, where he
commodities trader at
has consistently achieved
Glencore, and as an
outstanding results in
auditor at KPMG. A CPA
various mineral sectors.
qualified accountant,
His strategic leadership
Joe completed his MBA
in corporate roles and
at HKUST and London
operational excellence
Business School.
through innovative
Appointed 16 June 2023.
solutions have significantly
enhanced safety,
operations, and profitability.
Throughout his career, Bob
has worked with industry
leaders such as Rio Tinto,
Normandy Mining, BHP,
OZ Minerals, and Evolution
Mining.
Appointed 1 July 2024.
Roger is a member of
the Nomination, Audit
and Risk, and Treasury
Committees.
Murray is a member
Appointed 6 June 2023.
of the Nomination and
Remuneration Committees.
Appointed 10 May 2019.
6
2024 ANNUAL REPORT
HILLGROVE RESOURCES LIMITED
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
2024 Operational Performance
XX 8,971 tonnes of copper and 1,813 ounces of gold produced in 2024
XX The underground mine reached commercial production in July 2024
Table 1: Kanmantoo production for 2024
Units
Dec 2024
Quarter
Sep 2024
Quarter
Jun 2024
Quarter
Mar 2024
Quarter
CY2024
Total
Total Development
m
1,621
1,401
1,238
1,405
5,665
Inventory Mined
kt
311
280
211
122
924
Grade Mined
%
0.85
1.20
1.24
0.82
1.03
Tonnes Processed
kt
329
266
256
104
955
Grade Processed
%
0.86
1.18
1.10
0.93
1.02
Recoveries
%
93.5
93.3
91.4
82.7
90.2
Copper Produced
t
2,637
2,923
2,584
827
8,971
Gold Produced
oz
490
626
535
162
1,813
Silver Produced
oz
21,854
26,372
23,377
5,810
77,413
Kanmantoo Production
Mining Physicals
Processing Physicals
Production
CY2025 Guidance
CY2025 production and All-in Cost guidance presented below is extracted from ASX release
titled “Hillgrove Resources Limited (ASX: HGO) report for the quarter ended 31 December
2024“ dated 21 January 2024 and available to view at www.hillgroveresources.com.au
The successful mining ramp up and plant commissioning at the Kanmantoo Copper Mine has
established a solid platform for delivery in the calendar 2025 year. Group copper production
is expected to increase significantly from 2024 due to a combination of increased quarterly
production rates and a full 12 months of production.
Costs are expected to stabilise during the first quarter of 2025. All-in Costs per pound are
planned to improve as the year progresses as further efficiencies are realised and mining
rates continue to ramp up with the guidance calculated using an AUD:USD exchange rate
assumption of 0.64. All-in Costs include C1 costs plus all site sustaining and major capital
plus an allocation of Group Office costs.
Table 2: CY2025 Guidance production and costs
Metric
2025 Guidance Range
Copper Production (tonnes)
12,000 – 14,000
All-in Cost (US$/lb)
3.40 – 3.90
HILLGROVE RESOURCES LIMITED
2024 ANNUAL REPORT
7
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
Exploration Highlights
We explore for copper-gold deposits and currently hold 100% of a series of
Exploration Licenses covering 4,187 square kilometres in south-east South Australia
in the Cambrian-Ordovician Kanmantoo Province. Over 95% Of the Kanmantoo
Province is covered by the Tertiary Murray Basin which has limited past exploration.
South-West Kavanagh
Our total expenditure in 2024 was A$7.0M with 40 kilometres of drilling completed
across the Kanmantoo Operation and Near Mine targets achieving resource
expansion. In 2025 our exploration focus will continue on resource growth and
identifying new discovery targets.
XX 20.1m grading1.38% copper (uncut) from 87m
Kanmantoo Mine Lease Exploration
We have continued to explore within the Kanmantoo Mine Lease for copper-gold
endowment. In 2024, in addition to grade control drilling on the Main Kavanagh
mineralised zone, three zones of special interest have been drilled (Spitfire, South
West Kavanagh and Nugent).
Spitfire
Exploration drilling to explore the down dip of the Spitfire Cu-Au zone intersected
by the underground diamond drilling, returned 1:
XX 40.0m grading 1.38% copper (uncut) from 74m downhole (23KVUG0238)
XX 36.0m grading 1.78% copper 0.15g/t gold (uncut) from 175m downhole
(23KVUG0101)
The Spitfire drilling continues to demonstrate that there are wide zones of highergrade copper-gold breccia. These results have been included in the Mineral
Resource Estimate Update released in October 2024 2.
Exploration drilling to explore the South West extents
of the Kavanagh copper-gold zone intersected by the
underground diamond drilling returned 3 :
downhole (24KVUG0315)
XX 16.0m grading 1.05% copper (uncut) from 90m
downhole (24KVUG0319)
The South West Kavanagh drilling demonstrated the
predictability of the mineralisation down dip and identified
areas of previously unidentified higher-grade copper
breccias. These results have been included in the Mineral
Resource Estimate Update released in October 2024 4.
1 23 May 2024 – Underground drilling extends Kanmantoo
mineralisation
2 18 October 2024 – Maiden Kanmantoo underground Ore Reserve
and 96% increase in Copper Mineral Resource endowment
3 23 May 2024 – Underground drilling extends Kanmantoo
mineralisation
4 18 October 2024 – Maiden Kanmantoo underground Ore Reserve
and 96% increase in Copper Mineral Resource endowment
Figure 2: Cross section showing all UG drill holes through
SW Kavanagh and Spitfire with all surface DDH
Giant Open Pit completed 2019
900mRL
Underground
development
24KVUG0315
20.1m @ 1.38% Cu
SW Kavanagh
23KVUG0238
40m @ 1.38% Cu
800mRL
23KVUG0101
36m @ 1.78% Cu,
0.15g/t Au
Drillhole Grades
(%Cu)
> 1.0
0.8 - 1.0
0.6 - 0.8
0.4 - 0.6
0.15 - 0.4
< 0.15
700mRL
23KVUG0102
30m @ 0.92% Cu
100 metres
23KVUG0101
15m @ 0.81% Cu
318,100mE
8
318,200mE
2024 ANNUAL REPORT
318,300mE
HILLGROVE RESOURCES LIMITED
318,400mE
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
Exploration Highlights continued
318,300mE
318,500mE
318,700mE
24KVUG0451
9.4m @ 1.07% Cu,
0.07g/t Au & 1.53g/t Ag
@ 940RL
6,114,700mN
Nugent Pit
920 NUG inc SP
24KVUG0503
16m @ 2.96% Cu,
0.42g/t Au & 6.59g/t Ag
@ 930RL
24KVUG0476
18.55m @ 5.69% Cu,
1.02g/t Au & 10.76g/t Ag
@ 960RL
Planned 920 Level
Development
24KVUG0449
15m @ 0.85% Cu,
0.36g/t Au & 2.61g/t Ag
@ 935RL
6,114,500mN
October 2024 MRE
Blocks >0.4% Cu
100 metres
Legend (%Cu)
> 5.0
1.0 - 5.0
0.8 - 1.0
0.6 - 0.8
0.4 - 0.6
0.2 - 0.4
< 0.2
Sliced at 960+/o 50m
Figure 3: Plan view of Underground Nugent Drilling Completed to the end of Dec 2024.
Nugent
Regional Exploration
Resource confirmation (grade control)
and expansion drilling commenced during
the year to explore the Nugent extents.
Significant Nugent drill intersections include 5 :
Kanmantoo Geophysical Anomaly
XX 18.55m grading 5.69% copper and
1.02g/t gold (uncut) from 187m downhole
in 24KVUG0476
XX 16.00m grading 2.96% copper and
0.42g/t gold (uncut) from 197m downhole
in 24KVUG0503
XX 9.40m grading 1.07% copper and 0.07g/t
gold (uncut) from 204m downhole in
24KVUG0451
XX 15.00m grading 0.85% copper and
0.36g/t gold (uncut) from 196m downhole
in 24KVUG0449
The Nugent drilling has continued to
provide information on the continuity of the
Nugent mineral system and the geometry
of the mineralised pods. These results
have not been included in the Mineral
Resource Estimate Update released in
October 2024 6 and will be incorporated into
updates following further drilling.
During the year, drilling was completed on the geophysical anomaly approximately 400
metres north and 600 metres beneath the northern extents of the Kanmantoo open pit.
The mineralisation observed within drilling is consistent with the down plunge extents of
North Kavanagh however within the footprint of the interpreted geophysical structure there
is an absence of mineralised veining. The alteration observed was consistent with the
Magnetotelluric (MT) survey response.
Assay results from drilling of the MT Geophysical anomaly include 7:
XX 2m grading 0.83% copper and 0.06g/t gold downhole from 332m in KTDD246
XX 1m grading 1.05% copper and 0.21g/t gold downhole from 343.5m in KTDD246
XX 11.7m grading 0.77% copper and 0.08g/t gold downhole from 250.8m in KTDD247
XX 2.5m grading 0.84% copper and 0.44g/t gold downhole from 434m in KTDD247
Near Mine Exploration
The Company continues to hold the copper-gold prospects within 10 kilometres of the
Kanmantoo processing plant as high value targets for future drilling and evaluation for
processing options. These include the previously announced 8 South Kanmantoo, Stella,
Mullewa and North West Kanmantoo geochemical and geophysical targets. These prospects
all have similar geochemical and geophysical signatures to the Kanmantoo mineral system.
5
21 January 2025 – Hillgrove Resources Limited (ASX: HGO) report for the quarter ended 31 December 2024
6
18 October 2024 – Maiden Kanmantoo underground Ore Reserve and 96% increase in Copper Mineral
Resource endowment
7
23 October 2024 – Hillgrove Resources Limited (ASX:HGO) report for the quarter ended 30 September 2024
8
29 April 2019 – Cu-Au and Cu-Mo zones uncovered by exploration
HILLGROVE RESOURCES LIMITED
2024 ANNUAL REPORT
9
ANNUAL
REPORT
SUSTAINABILITY
REPORT
FINANCIAL
REPORT
Exploration Highlights continued
6,114,000mN
900mRL
Kanmantoo Long Section
KTDD245 & KTDD247 Looking West
North Kavanagh
Coopers
Giant Open Pit completed 2019
KTDD247
1,000mRL
2.5m @ 0.84% Cu,
0.44g/t Au
@ 0.83% Cu,
0.06g/t Au
Emily Star
KTDD247
Nugent
11.7m @ 0.77% Cu,
0.08g/t Au
Plan view of drill collars
North Kavanagh
Kavanagh
KTDD246 &
KTDD247 Collars
Cu %
Kavanagh
> 1.0
0.8 - 1.0
0.4 - 0.8
0.2 - 0.4
Au g/t
Emily Star
> 1.0
0.5 - 1.0
Nugent
300 metres
400 metres
Figure 4: Longitudinal section viewed to the West of exploration drilling targeting a geophysical anomaly.
Inset: collar locations relative to existing drilling information.
Regional Exploration continued
Southeast Kanmantoo Province
The regional area comprises 4,187 km2 of
exploration licences within the Kanmantoo Province
in the south-east of South Australia. During the year,
25 percent (1,465km2) of the south-east tenements
were relinquished in areas identified as low value
targets. The work plan for the coming year will focus
on target areas to provide key geological knowledge
to assist in identifying high value potential economic
areas of interest.
Continued interpretation of new mineral system
models operating within the Kanmantoo Province
along with a review of existing data has been a
focus for our regional exploration activities, following
on from work completed by the Geological Survey
Share your feedback
Discover