Quarterly Report and Appendix 5B for 31 December 2024
Released
Released
Announcement PDF
QUARTERLY REPORT
Hillgrove Resources Limited (ASX: HGO) report for the quarter ended 31 December 2024
Record physical metrics sets strong platform for CY2025
December 2024 quarter highlights:
•
•
•
•
Development metres increased by 16% to 1,620 metres
Ore mined increased by 11% to 311kt
Processed ore increased by 24% to 329kt
Copper production of 2,637 tonnes at an all-in cost of US$3.97 per pound
Outstanding drilling results at Nugent
First underground grade control diamond drilling into Nugent returned outstanding results, including1:
•
•
18.55m @ 5.69% Cu + 1.02g/t Au (uncut) from 187m downhole in 24KVUG0476
16.00m @ 2.96% Cu + 0.42g/t Au (uncut) from 197m downhole in 24KVUG0503
CY2025 Guidance
•
Copper production of 12,000 – 14,000 tonnes at an All-in Cost of US$3.40 – US$3.90 per pound
CEO and Managing Director’s Statement
Commenting on the December 2024 quarter, Hillgrove CEO and Managing Director, Bob Fulker said:
“The record development metres, and stope tonnes delivered in the December quarter has set us
up well to deliver strong operating results in our first full year of production in calendar year 2025.
In line with the mine plan, stopes mined in December were lower grade than in prior months. This
has set us up for a return to higher grade stopes in the March 2025 quarter.
We are excited by the exceptional drill results returned at Nugent, including 18.6m @ 5.69% Cu
and 1.02g/t Au, which will have the potential to provide further upside to our current life of mine
plan.”
Figures 1-3: Kanmantoo quarterly production metrics
1.
Full results from Nugent grade control drilling are reported in the table in Appendix A of this report
Page 1
KANMANTOO UNDERGROUND OPERATIONS
The Kanmantoo Copper Mine is situated in the Adelaide Hills region of South Australia, just 55 kilometres
from Adelaide and only 3 kilometres from the main dual carriageway to Port Adelaide. This strategic
location offers significant advantages in both operating and capital costs, making it easier to attract and
retain a skilled workforce that primarily resides in the area.
Safety and Environment
A continued focus on safety resulted in the Total Recordable Injury Frequency (TRIF) declining to 13.1
during the December quarter (September 2024 quarter: 13.3).
Completion of a tailings dam lift and active management of tailings deposition has allowed for tailing
deposition to commence around the entire perimeter of the TSF during future milling campaign. This has
seen a material reduction in dust generation during inclement weather for both site and the wider
community.
Production and Costs
Kanmantoo produced 2,637 tonnes of copper in 11,734dmt of concentrate at an All-In Cost of US$3.97
per pound of copper after by-product credits. Lower feed grade in the December quarter had an adverse
impact on both production and unit costs. Lower grade stopes were mined in both November and
December which was consistent with the mine plan and performed in line with the block model. Access
to higher grade stopes has been regained in January 2025.
Total costs on an absolute basis continue to improve, even with the ramp up in mining activity, with All-in
costs in the December quarter declining to $34.5 million (Sep qtr: $35.7M).
Quarterly records were achieved in several key physical metrics, including:
•
•
•
•
total development metres increased 16% to 1,620 meters (Sep qtr: 1,401)
inventory mined increased 11% to 311kt (Sep qtr: 280kt)
tonnes processed increased 24% to 329kt (Sep qtr: 266kt)
copper recoveries improved to 93.5% (Sep qtr: 93.3%)
The main mining inventory sources for the quarter were from the Kavanagh 860 and 835 levels and the
Spitfire 810 level. Underground development focussed on the Kavanagh Decline, 835, 810, 785 and 760
levels along with the Nugent incline and decline.
The processing plant performed well, benefiting from continued operational improvements implemented
during the quarter. This led to an increase in all key processing metrics, including tonnes processed,
whilst concurrently increasing recoveries despite the lower processed grade.
Table 1 below highlights the key mining, processing and cost metrics for the operation.
Page 2
Table 1: Kanmantoo quarterly production and cost summary
Kanmantoo Production
and Cost Metrics (Unaudited)
Mining Physicals
Total Development
Inventory Mined
Grade Mined
Processing Physicals
Tonnes Processed
Grade Processed
Recoveries
Production
Copper Produced
Gold Produced
Silver Produced
Cost Summary1
Mining
Processing
Site G&A
Transport and Offtake Charges
Inventory Movements
By-Product Credits
C1 Cash Cost
Government Royalties
Sustaining Capital
All-in Sustaining Cost
Major Capital2
All-in Cost
1
2
3
Units
Dec 2024
Quarter
Sep 2024
Quarter3
Jun 2024
Quarter
Mar 2024
Quarter
m
kt
%
1,621
311
0.85
1,401
280
1.20
1,238
211
1.24
1,405
122
0.82
kt
%
%
329
0.86
93.5
266
1.18
93.3
256
1.10
91.4
104
0.93
82.7
t
oz
oz
2,637
490
21,854
2,923
626
26,372
2,584
535
23,377
827
162
5,810
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
US$/lb
2.15
0.60
0.12
0.42
(0.06)
(0.29)
2.94
0.19
0.47
3.60
0.37
3.97
1.55
0.61
0.19
0.39
0.06
(0.32)
2.48
0.19
0.64
3.31
0.40
3.71
1.18
0.59
0.14
0.36
0.13
(0.24)
2.16
0.17
0.00
2.33
1.40
3.73
2.56
1.62
0.43
0.32
(0.92)
(0.24)
3.77
0.19
0.00
3.96
2.92
6.88
AUD/USD conversion rate of 0.67 used.
Major Capital includes a portion of underground mine development capital as well as surface infrastructure capital.
September 24 Quarter Capital allocation has been adjusted to align with accounting standards, post commercial production.
Page 3
HILLGROVE RESOURCES
Financials
Net revenue from metal sales in the December 2024 quarter was $34.6 million. At the end of the quarter,
Hillgrove had cash, receivables, and unsold concentrate of $9.7 million.
Table 2: Company Liquidity
Unaudited (A$M)
Cash
Receivables
Unsold Concentrate
TOTAL
Dec 2024
Sep 2024
Jun 2024
Mar 2024
Quarter
3.3
2.9
3.5
Quarter
7.8
2.2
2.2
Quarter
7.4
3.5
4.4
Quarter
7.4
2.6
1.7
9.7
12.2
15.3
11.7
The reduction in liquidity was a direct result of the lower mined grades, which resulted in reduced copper
production and revenues. This is expected to reverse in the upcoming quarters, as a result of:
•
•
•
•
Mining transitioning past the lower grade zones,
Increased development rates opening additional mining fronts,
Increased stope tonnes as the mining efficiency improves with the introduction of emulsion firing,
and
Increased plant utilisation.
During the December quarter, the Company invested $0.3 million in exploration and $7.2 million in mine
development (Sep qtr restated: $8.2m).
The Company paid executive director salaries and non-executive director fees of $249,148 during the
quarter.
Hillgrove remains debt free with the A$10 million debt facility undrawn.
On 31 December 2024, the Company had 7,900 tonnes of hedging outstanding at a weighted average
price of A$14,056 per tonne scheduled for delivery between January 2025 and September 2026.
Page 4
2025 Guidance
The successful mining ramp up and plant commissioning at the Kanmantoo Copper Mine has established
a solid platform for delivery in the calendar 2025 year. Group copper production is expected to increase
significantly from 2024 due to a combination of increased quarterly production rates and a full 12 months
of production.
Costs are expected to stabilise during the first quarter of 2025. All-in costs per pound are planned to
improve as the year progresses as further efficiencies are realised and mining rates continue to ramp up.
Cost guidance is calculated using copper metal price assumption of A$14,000 per tonne at a AUD:USD
exchange rate of 0.64. All-in costs include C1 costs plus all site sustaining and major capital.
Metric
Copper Produced (tonnes)
All-in Cost (US$/lb)1
1.
Guidance Range
12,000 – 14,000
3.40 – 3.90
Assumes AUD:USD exchange rate of 0.64
KANMANTOO EXPLORATION
Mineral Resource Drilling
The Company drilled a further 65 holes from underground during the three months to 31 December 2024.
9,468m of drilling was achieved within the Kanmantoo mineral system. Of these, 23 holes were targeting
the Nugent area, with the remaining 42 holes targeting the Kavanagh mineral systems within the
underground mining footprint.
Outstanding results were returned from the initial grade control drilling of the Nugent Mineral System. The
results of this drilling to date are included in the table in Appendix A of this report.
Significant Nugent drill intersections include:
•
•
•
•
18.55m @ 5.69% Cu + 1.02g/t Au (uncut) from 187m downhole in 24KVUG0476
16.00m @ 2.96% Cu + 0.42g/t Au (uncut) from 197m downhole in 24KVUG0503
9.40m @ 1.07% Cu + 0.07g/t Au (uncut) from 204m downhole in 24KVUG0451
15.00m @ 0.85% Cu + 0.36g/t Au (uncut) from 196m downhole in 24KVUG0449
This underground diamond drilling into Nugent has continued to provide information on the continuity of
the Nugent mineral system. Outstanding results were achieved at the eastern end of the Nugent system,
where high grade copper and gold intercepts have been identified in holes 24KVUG0476 and
24KVUG0503. These holes represent a zone of 30 vertical metres between the 960 and 930m RL. Hole
24KVUG0477 targeted the strike extension of this zone but was ended 2m into the mineralised zone due
to water being intersected. Follow up drilling will be planned for this area.
This drill program into the Nugent Mineral System has included a number of holes targeting geotechnical
information for development of underground infrastructure and the boundaries of possible mineralised
pods which has resulted in holes with no significant intersections.
Page 5
Figure 4: Long Section of all Nugent drilling to December 2024 Viewed to the North
Figure 5: Plan view of Underground Nugent Drilling Completed to the end of Dec 2024
Page 6
Mine Lease Exploration
The extensive copper exploration targets on the Kanmantoo mining lease include:
•
•
•
•
Along strike and down-dip extensions of the Kavanagh and Nugent Cu-Au Mineral Resources
The Emily Star down dip extension
Valentine, Critchley and Paringa, and
The Coopers and North Kavanagh deposits to the north of the Kavanagh underground
development
These are classified as the North and South copper hubs, where exploration activities will be targeted as
underground development allows.
During the December quarter, the focus has been on grade control definition drilling and resource drilling
into strike extensions of Kavanagh on the SW Kavanagh lode and Nugent. The first Nugent underground
drill platform was commissioned in October 2024 for drilling grade control holes for the Nugent lode from
underground and to provide a platform for geotechnical holes prior to Nugent decline/incline development.
Near Mine Exploration
The Cu-Au targets within 10 kilometres of the Kanmantoo processing plant include the South Kanmantoo,
Stella, Mullewa and North West Kanmantoo geochemical and geophysical targets. There was no work
undertaken on these prospects in the December 2024 quarter.
REGIONAL EXPLORATION
The regional area comprises 4,187 km2 of exploration licences within the Kanmantoo Province in the
south-east of South Australia. The work plan for the coming year will focus on target areas to provide key
geological knowledge to assist in identifying high value potential economic areas of interest.
Continued interpretation of new mineral system models operating within the Kanmantoo Province along
with a review of existing data has been a focus for Hillgrove’s regional exploration activities, following on
from work completed by the Geological Survey of South Australia (GSSA) and MINEX-CRC within the
Kanmantoo Provence on magmatic related copper-gold endowment.
Competent Persons Statement
The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources
is based on information compiled by Caitlin Rowett, a Competent Person who is a Member of The
Australasian Institute of Mining and Metallurgy. Caitlin Rowett is a full-time Employee and Shareholder
of the company. Caitlin Rowett has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves. Caitlin Rowett has consented to the inclusion in the release of the matters
based on their information in the form and context in which it appears.
Page 7
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate were initially
reported by the Company to the ASX on the 18th of October 2024. Further information is available on the
Hillgrove Resources website at www.hillgroveresources.com.au
The information in this report that relates to the previously reported Nugent Drill holes were initially
reported by the Company to the ASX on the 6th of May 2022 and the 3rd of September 2020. Further
information is available on the Hillgrove Resources website at www.hillgroveresources.com.au
The company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
Page 8
CORPORATE INFORMATION
Issued Share Capital at 31 December 2024
Ordinary shares
Unlisted Options
Employee Performance Rights
Share price activity for the Quarter
High
Low
Last (31 December 2024)
0.069
0.049
0.052
SHARE REGISTRY
REGISTERED OFFICE
Boardroom Limited
GPO Box 3993
Sydney NSW 2001, Australia
F: +61 2 9279 0664
T: (within Australia) 1300 737 760
T: (outside Australia) +61 2 9290 9600
Hillgrove Resources Limited
Ground Floor
5-7 King William Road
Unley, South Australia, Australia
E: info@hillgroveresources.com.au
T: +61 8 7070 1698
2,095,555,567
66,000,000
43,525,000
For more information contact:
Mr Bob Fulker
CEO & Managing Director
Tel: +61 8 7070 1698
Mr Joe Sutanto
CFO & Company Secretary
Tel: +61 8 7070 1698
SCHEDULE OF TENEMENTS AS AT 31 DECEMBER 2024
Tenement
Location
Percentage
ML 6345
Kanmantoo, South Australia
100%
ML 6436
Kanmantoo, South Australia
100%
EML 6340
Kanmantoo, South Australia
100%
EL 6526
Kanmantoo, South Australia
100%
EL 6174
Coomandook, South Australia
100%
EL 6175
Coonalpyn, South Australia
100%
EL 6207
Tintinara, South Australia
100%
EL 6294
Wynarka, South Australia
100%
EL 6397
Laffer, South Australia
100%
Page 9
APPENDIX A: List of all drill intercepts in this report
Intercepts tabulated in the table are amalgamated over a minimum down hole length of 3m > 0.3% Cu
with a maximum of 2m internal dilution < 0.3% Cu. Or a minimum down hole length of 3m > 0.3g/t Au
with a maximum of 1m internal dilution < 0.3g/t Au. No assays were cut before amalgamating the
intercept.
Hole ID
24KVUG0340
Ore Zone
Target
Nugent Geotech
24KVUG0448
Nugent
24KVUG0449
Nugent
24KVUG0450
Nugent
24KVUG0451
Nugent
24KVUG0452
Nugent
24KVUG0453
Nugent
24KVUG0454
24KVUG0455
24KVUG0456
Nugent Geotech
Nugent Geotech
Nugent Geotech
24KVUG0473
Nugent
24KVUG0474
Nugent
24KVUG0475
Nugent
24KVUG0476
Nugent
24KVUG0477
Nugent
24KVUG0494
Nugent
24KVUG0495
Nugent
24KVUG0496
Nugent
24KVUG0497
Nugent
24KVUG0503
Nugent
Assay
Method
PXRF of
<1mm
PXRF of
<1mm
4-Acid/ICPMS
PXRF of
<1mm
4-Acid/ICPMS
PXRF of
<1mm
Not
Sampled
Not
Sampled
Not
Sampled
PXRF of
<1mm
PXRF of
<1mm
PXRF of
<1mm
PXRF of
<1mm
4-Acid/ICPMS
PXRF of
<1mm
PXRF of
<1mm
PXRF of
<1mm
PXRF of
<1mm
PXRF of
<1mm
4-Acid/ICPMS
Depth
From
Depth
To
Interval
Length
Cu%
Au g/t
Ag g/t
394
397
3
1.26
NA
NA
0.85
0.36
2.61
1.07
0.07
1.53
0.49
NA
NA
NSI
196
211
15
NSI
204
213.4
9.4
NSI
NSI
NSI
NSI
NSI
179
183
4
NSI
189.55
199
9.45
0.34
NA
NA
187
205.55
18.55
5.69
1.02
10.76
191
193.1
2.1
1.65
NA
NA
NSI
NSI
155
166
11
0.6
NA
NA
144
153
9
0.42
NA
NA
197
213
16
2.96
0.42
6.59
Page 10
APPENDIX B: List of all Drill Collar details
HOLE_ID
SITE
TYPE
MAX
DEPTH
SURVEY
METHOD
NAT_GRID_ID
EASTING
NORTHING
HEIGHT
24KVUG0340
DDH
459.3
TOTAL STATION
MGA94_54
318243.608
6114864.05
899.032
24KVUG0448
DDH
215
TOTAL STATION
MGA94_54
318315.8827 6114641.904 923.4459
24KVUG0449
DDH
227.12 TOTAL STATION
MGA94_54
318315.6518 6114642.409 923.4365
24KVUG0450
DDH
59.6
TOTAL STATION
MGA94_54
318315.9835 6114642.412 923.4103
24KVUG0451
DDH
239.7
TOTAL STATION
MGA94_54
318316.0026
6114642.59
923.4214
24KVUG0452
DDH
254.9
TOTAL STATION
MGA94_54
318315.9115
6114642.78
923.4257
24KVUG0453
DDH
263.68 TOTAL STATION
MGA94_54
318315.8949 6114642.978 923.4122
24KVUG0454
DDH
85.6
TOTAL STATION
MGA94_54
318315.9332
24KVUG0455
DDH
116.8
TOTAL STATION
MGA94_54
318315.4842 6114641.602 922.4786
24KVUG0456
DDH
125.3
TOTAL STATION
MGA94_54
318312.4173 6114640.529 923.4606
24KVUG0473
DDH
206.4
TOTAL STATION
MGA94_54
318316.1803 6114641.888
24KVUG0474
DDH
210.23 TOTAL STATION
MGA94_54
318316.0978 6114642.114 923.8188
24KVUG0475
DDH
221.56 TOTAL STATION
MGA94_54
318315.767
24KVUG0476
DDH
230.67 TOTAL STATION
MGA94_54
318315.7668 6114642.348 923.7492
24KVUG0477
DDH
193.1
TOTAL STATION
MGA94_54
318315.8183 6114642.605 923.7235
24KVUG0494
DDH
206.73 TOTAL STATION
MGA94_54
318315.8158 6114641.654 923.4536
24KVUG0495
DDH
195.1
TOTAL STATION
MGA94_54
318315.7364 6114641.419 923.4897
24KVUG0496
DDH
194.2
TOTAL STATION
MGA94_54
318315.5769
6114641.18
923.4907
24KVUG0497
DDH
191.5
TOTAL STATION
MGA94_54
318315.2048 6114641.166
923.471
24KVUG0503
DDH
237
TOTAL STATION
MGA94_54
318315.5794 6114642.196 923.4125
6114641.26
925.1713
923.841
6114642.348 923.7493
Page 11
APPENDIX C: List of all Drill Survey Details
HOLE_ID
DEPTH AZIMUTH DIP
24KVUG0340
0
24KVUG0340 15
24KVUG0340 30
24KVUG0340 60
24KVUG0340 90
24KVUG0340 120
24KVUG0340 150
24KVUG0340 180
24KVUG0340 210
24KVUG0340 240
24KVUG0340 270
24KVUG0340 300
24KVUG0340 330
24KVUG0340 360
24KVUG0340 390
24KVUG0340 420
24KVUG0340 450
24KVUG0340 459.3
24KVUG0448
0
24KVUG0448 15
24KVUG0448 30
24KVUG0448 60
24KVUG0448 90
24KVUG0448 120
24KVUG0448 150
24KVUG0448 180
24KVUG0448 215
24KVUG0449
0
24KVUG0449 15
24KVUG0449 30
24KVUG0449 60
24KVUG0449 90
24KVUG0449 120
24KVUG0449 150
24KVUG0449 180
24KVUG0449 225
24KVUG0450
0
24KVUG0450 15
24KVUG0450 30
24KVUG0451
0
24KVUG0451 15
24KVUG0451 30
24KVUG0451 60
24KVUG0451 90
24KVUG0451 120
167.99
167.69
167.28
166.36
165.92
165.3
164.69
164.58
164.62
163.46
163.1
162.5
161.58
160.2
159.33
161.68
159.28
157.15
108
107.89
107.99
107.79
107.53
107.3
107.39
107.24
107.8
103.99
103.98
103.99
104.08
104.12
103.93
104.09
104.18
104.55
99.99
99.97
99.87
96.99
96.99
96.99
97.27
97.24
96.72
10.2
10.3
10.4
10.1
10.3
10.5
11.1
11.5
12
12.7
13.1
13.3
13.6
14
16.2
16.4
16.8
17.2
1.3
1.18
1.59
2.07
2.94
3.59
3.54
3.85
4.04
2.34
2.32
2.63
3.21
4
4.25
4.57
4.91
5.25
1.94
2.53
3.01
3.77
3.8
3.85
4.97
5.44
3.54
HOLE_ID
DEPTH
AZIMUTH
DIP
HOLE_ID
DEPTH
AZIMUTH
DIP
HOLE_ID
DEPTH
AZIMUTH
DIP
24KVUG0451
24KVUG0451
24KVUG0451
24KVUG0451
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0452
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0453
24KVUG0454
24KVUG0454
24KVUG0454
24KVUG0454
24KVUG0454
24KVUG0455
24KVUG0455
24KVUG0455
24KVUG0455
24KVUG0455
24KVUG0455
24KVUG0456
24KVUG0456
24KVUG0456
24KVUG0456
24KVUG0456
24KVUG0456
24KVUG0473
24KVUG0473
150
180
210
239
0
15
30
60
90
120
150
180
210
240
254.9
0
15
30
60
90
120
150
180
210
240
263
0
15
30
60
85
0
15
30
60
90
116
0
15
30
60
90
120
0
15
96.74
96.8
96.39
96.73
94
94
94.18
94.17
94.38
94.39
94.18
94.3
94.3
94.2
94.09
87.99
88.05
88.15
88.28
88.63
89.46
88.72
89.33
89.21
89.25
89.76
125
125.34
125.37
124.5
124.24
125
124.57
124.03
123.92
123.84
123.12
199.99
200
200.73
201.55
203.53
204.77
110.59
110.24
4.34
5.12
5.43
5.73
1.2
1
1.44
2.09
2.54
3.29
2.95
5.99
6.54
6.81
6.99
1.21
1.34
1.68
2.15
3.39
4.43
2.86
4.12
6.96
8.4
8.67
29.06
28.62
28.11
27.12
26.17
-29.13
-28.87
-28.23
-27.35
-26.96
-24.97
10
9.23
8.98
8.56
8.58
9.38
8.87
9.31
24KVUG0473
24KVUG0473
24KVUG0473
24KVUG0473
24KVUG0473
24KVUG0473
24KVUG0473
24KVUG0474
24KVUG0474
24KVUG0474
24KVUG0474
24KVUG0474
24KVUG0474
24KVUG0474
24KVUG0474
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0475
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0476
24KVUG0477
24KVUG0477
24KVUG0477
24KVUG0477
24KVUG0477
24KVUG0477
24KVUG0477
24KVUG0477
24KVUG0494
24KVUG0494
30
60
90
120
150
180
205
0
15
30
60
90
120
150
180
0
15
30
60
90
120
150
180
210
220
0
15
30
60
90
120
150
180
210
230
0
15
30
60
90
120
150
180
0
15
109.86
110.35
110.13
109.6
109.5
108.74
108.42
107
106.89
106.85
106.8
106.76
106.17
105.53
105.38
104
103.82
103.73
103.93
103.51
103.44
102.47
102.69
102.07
101.62
100
100
99.92
99.97
100.83
102.26
101.67
101.84
101.03
100.63
97
97.29
97.36
97.39
97.34
97.08
97.73
98.13
112.99
112.79
10.54
11.31
11.63
11.84
11.78
11.77
11.84
8.63
8.64
8.76
9.77
10.45
11.12
10.94
10.75
7.87
8.09
8.96
10.42
10.74
11.12
10.83
10.64
10.4
10.12
7.7
7.8
8.39
9.67
11.58
13.04
13.17
13.06
12.08
12.4
7.86
7.73
8.22
9.03
9.46
10.35
11.35
11.93
1.77
1.86
24KVUG0494
24KVUG0494
24KVUG0494
24KVUG0494
24KVUG0494
24KVUG0494
24KVUG0494
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0495
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0496
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0497
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
24KVUG0503
30
60
90
120
150
180
205
0
15
30
60
90
120
150
180
195
0
15
30
60
90
128
150
180
194.2
0
15
30
60
90
120
150
180
190
0
15
30
60
90
120
150
180
210
235
112.81
112.87
112.28
111.74
111.01
110.4
110.46
117.9
117.81
117.66
117.45
117.04
116.37
114.9
114.14
112.09
122.99
122.76
122.14
121.4
120.76
119.8
119.45
119.35
119.36
129
128.32
128.12
126.56
125.51
124.43
122.86
121.51
120.98
102.2
102.05
101.66
101.64
101.64
100.79
100.65
99.67
99.47
98.44
2.14
2.72
4.02
4.19
4.42
4.04
4.38
2.3
2.34
2.94
3.23
4.04
4.72
4.99
4.89
5.63
2.82
2.76
4.31
4.95
5.48
5.94
5.63
5.59
5.46
2.81
2.96
3.04
4.02
5.04
5.86
7.14
7.4
7.74
-0.42
-0.43
0.75
1.84
2.76
3.15
4.53
5.44
5.22
5.58
Page 12
APPENDIX D: Grade Control Methodology
The objective of the ongoing underground (UG) diamond drilling program has been to infill the exploration
drilling through the Kanmantoo including both Kavanagh and Nugent mineral systems within the
Kanmantoo Mine Lease for the purpose of final ore development and stope planning and design.
Appendix E JORC Tables 1 and 2 describe the drilling, sampling, and assaying processes. Summary
descriptions are provided below.
Drilling
All holes are collared and drilled using conventional UG NQ diamond drilling tools. No directional drilling
is required for the underground drilling. Collar co-ordinates and collar surveys of the holes reported in this
release are provided in Appendix B & C. Drilling is undertaken by a single contractor with experienced
drillers. Drilling rates vary from 20m to 90m per shift and average 45m per shift including all non-drilling
activities. Drill hole collars and alignments are surveyed by a qualified surveyor and downhole surveyed
with Gyro.
Similar to the exploration drilling, the UG drill core recovery is excellent and RQD > 95%.
Logging and Sampling
Geological and geotechnical logging is undertaken or supervised by Hillgrove geologists who have been
involved in the exploration drilling over the past few years. Core photography and sampling is undertaken
or supervised by the technician crews who have worked with Hillgrove’s exploration programs over the
past few years.
Assaying
Selected holes (identified in Table 1) were assayed by the same process as utilised for exploration drilling.
• Core saw to slab drill core in half, and 50% of sample interval despatched to ALS
• Crush to 70% < 2mm whole sample
• Spilt and 1kg pulverised to 85% < 75um
• Spilt and 0.5 gram assay by 4-acid digest and ICP-MS analysis and Au by 30g Fire Assay and
AA finish
The ##KVUG UG drill holes have predominantly been assayed by an on-site XRF assay facility with
several drill holes duplicate assayed by the ALS assay process as a QA/QC check of the XRF results.
Where a drill hole has been assayed by both XRF and ALS, the ALS results are prioritised in the database
and used for all resource interpretations and grade modelling. Table 1 shows the drill holes that have
been reported with the XRF or with the ALS methods. A the XRF process does not provide useful lower
limits of detection for Ag or Au these elements are not reported in the drill intersection table (NA is
annotated therein). The XRF process used for copper grades of the UG drill core is the same as that
successfully developed and utilised for all grade control in the Giant open pit from 2016 to 2019. During
the open pit period the on-site XRF process for Cu reconciled excellently against mill reconciled copper
grade. The onsite XRF process for UG drill core is
• Crush whole drill core interval in Orbis OM100 crusher to 70% < 2mm (no core saw splitting)
• Rotary split to 1kg
• Sieve split to < 1mm and retain fine fraction
• Riffle split and manual split to 20 grams and pelletised
• Benchtop portable XRF of pellet
For both methods extensive blanks, and appropriate standards are inserted into the sample sequence.
Blanks, in particular are authorised by the logging geologist for intervals following high sulphides to
capture any crusher/pulveriser contamination with additional routine blanks inserted every 20 samples.
Page 13
QA of the veracity of the XRF copper assays has been diligently reviewed with on-going duplicate
sampling and assaying. Figure 1 shows an example of the comparison of the duplicate XRF and ALS
assays from drill hole 24KVUG0476. The duplicate assaying shows
1. Excellent delineation of the economic interval at 0.4% Cu and 0.6% Cu cutoff grades
2. Excellent estimates of the mean Cu grade of the economic intervals
Figure 1: Comparison of XRF and ALS assays for Cu – hole 24KVUG0476
In conclusion, the XRF assaying for Cu at Kanmantoo continues to be a reliable estimate of the drill core
copper values subject to on-going QA/QC of drill core ALS assaying from the different lode systems.
Page 14
APPENDIX E: JORC (2012) Table 1
Section 1 Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
• The Diamond Drill Hole (DDH) sampling was conducted as per the Hillgrove
Resources procedures and QAQC protocols.
• Sample intervals from 1.25m to 0.25m as determined by geology through visibly
mineralised zones were split from the drill core
• Where samples are despatched to ALS the sample intervals are split from the drill
core, with the drill core sawn in half with a diamond core saw and half-core sample
crushed to 75% < 2mm by ALS’s Boyd Crusher
• Where samples are assayed by the on-site XRF, the whole interval of drill core is
crushed to 75% < 2m by Hillgrove’s Orbis OM100 Crusher
Drilling
techniques
• All UG drilling is undertaken by external drilling contractor, DRC Drilling. All holes
drilled with NQ. NQ Core size is 47.6mm in diameter.
Drill sample
recovery
• Recovered drill core metres were measured and compared to length of drill hole
advance to calculate core recovery for every core run. On average sample recovery
is >98%. There is no correlation between sample recovery and copper grades in this
DDH drill program.
Logging
• All drill core was logged for lithology, alteration, weathering and mineralisation by
Hillgrove geologists in accordance with Hillgrove’s Core Logging Procedure. Colour
and any additional qualitative comments were also recorded.
• High quality photographs of all drill core before being sampled were taken under
controlled light at the HGO core yard at Kanmantoo.
• All drill core is stored at Hillgrove’s Kanmantoo core yard facility.
• All geological logging is recorded into Geobank for Field Teams (a database product
from Micromine) templates and visually validated before being imported into the
Hillgrove drill hole database. Additional validation is conducted automatically on
import.
• In addition, a geotechnical log of all drill core is recorded utilising standard
geotechnical logging indexes. RQD is 98-100%. UG drill core is not oriented. Where
required, orientation of structure relative to the dominant S2 foliation is recorded.
Subsampling
techniques
and sample
preparation
• For the intervals despatched to ALS the core is sawn in half and the half core
despatched to ALS for each sample interval and the entire half-core sample then
crushed and 1kg rotary split from the crushed mass and the 1kg sub-sample then
pulverised to 85%< 75um. A sub-split of 200 grams of the pulverised material is then
split by ALS and retained, and the reject pulverised material returned to Hillgrove.
From the 200 gram sub-split a 2 gram aliquot is scooped and weighed by ALS for 4acid digestion.
• For the intervals retained on-site for the onsite XRF laboratory, the core is not sawn
in half. The entire core from the marked sample interval is crushed in a crusher and
1kg riffle rotary split from the c