SUMMARY
A number of milestones achieved as the Company prepares for first copper production at
Kanmantoo, including:
o Primary ventilation installed;
o Secondary means of egress established;
o Pit dewatered below the initial stope horizon;
o Stoping activities commenced;
o Rotatable containers delivered to Port Adelaide;
o Contract for bulk haulage executed; and
o Dry circuit in the processing plant commissioned.
First copper production remains on target for early 2024.
The infill and extensional underground drilling at Kavanagh and Spitfire has confirmed many
of the high grade mineral zones, including1:
o 36.6m @ 3.35% Cu (uncut) from 43m downhole in East Kavanagh (23KVUG064),
including:
2.1m @ 24.76 % Cu (uncut) from 53m downhole.
o 40m @ 1.27% Cu (uncut) from 91m downhole in Central Kavanagh (23KVUG072).
o 33.23m @ 1.46% Cu (uncut) from 42m downhole in East Kavanagh (23KVUG083).
The infill underground diamond drilling demonstrates that the exploration drilling results
previously reported for the Kavanagh and Spitfire mineral zones are being confirmed.
A strong low resistivity (high conductivity) zone was identified to the north of the existing
underground mine development at Kanamntoo. The Company revised its total Kanmantoo
Exploration Target to incorporate this new discovery and is now reported as between 60 and
100 million tonnes with a target grade of 0.9% to 1.2% Cu and 0.1 g/t to 0.2 g/t Au2. The
Exploration Target is conceptual in nature as there has been insufficient exploration to define
a Mineral Resource. It is uncertain if further exploration will result in the determination of a
Mineral Resource under the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves, the JORC Code” (JORC 2012). The Exploration Target is not
being reported as part of any Mineral Resource or Ore Reserve.
1 Refer ASX release of 13 November 2023
2 Refer ASX release of 11 October 2023
Page 1
MANAGING DIRECTOR’S STATEMENT
“It has been a busy quarter advancing the underground development and preparing for first
copper production. On the mining front, the primary ventilation was installed which enabled a
second jumbo be deployed, increasing the development rate. Shortly thereafter, a secondary
means of egress was established, and the pit dewatered below the initial development horizon
which enabled stoping activities to commence, culminating in the first stope blast on 30
December. Post quarter-end, blasting has continued and ore has been bogged to the
stockpile.
Commissioning of the process facility was split into “two halves", with everything upstream of
the mill commissioned during the quarter, including the primary and secondary crushers,
screening plants and conveyors. Post quarter-end, commissioning of the remainder of the
processing facility has commenced and first copper production remains on track for the first
quarter of 2024.
The Company also took control of 410 rotatable containers and executed the contract to
transport bulk concentrate from the mine to the point of sale at Port Adelaide.
Looking ahead, the future is very exciting; not only will Hillgrove become Australia’s next
copper producer, but we also have a number of exciting exploration targets to follow up on,
including a recently discovered geophysical target which appears to be the northern
continuation of the Kanmantoo mineral system that has been offset down plunge by a fault.
The Exploration Target immediately around the process plant is now 60-100Mt with a grade
range of 0.9-1.2%Cu, which is an order of magnitude above our existing mining inventory of
4.5Mt. I am looking forward to drilling this target this year.”
Page 2
UNDERGROUND DEVELOPMENT
Approximately 1,209 metres of development was completed during the quarter, with approximately
33,000 tonnes of ore stockpiled in preparation for processing. Figures 1-6 highlight some of the many
activities underway at the Kanmantoo underground.
Figure 1 Primary ventilation fans installed
Figure 2 Secondary means of egress established, enabling stoping to commence
Page 3
Figure 3 Raiseboring the slot for the first stope
Figure 4 Drilling the first stope (LHS) and drawpoint after firing
Page 4
Figure 5 Hauling ore to the stockpile
Figure 6 First crushing campaign as part of dry circuit commissioning
Page 5
EXPLORATION
Hillgrove has a strong pipeline of exploration opportunities over more than 6,100km2 of tenements. These
tenements comprise three project areas: the Mine Lease Exploration, Near Mine Exploration (within 10
kms of Hillgrove’s processing plant) and the Regional Exploration areas within the Kanmantoo Province
in the south-east of South Australia.
Mine Lease Exploration
The Cu-Au targets within the Kanmantoo Mine Lease, and within 1 km of Hillgrove’s processing plant,
include the strike and down-dip extensions of the main Kavanagh and Nugent Cu-Au mineral resources,
the Emily Star, Valentine and Paringa Cu-Au deposits located south of the Kavanagh underground CuAu development (the South Hub), and the Coopers and North Kavanagh Cu-Au deposits north of the
Kavanagh underground development (the North Hub). The North and South Hub Cu-Au targets have
been confirmed by Hillgrove shallow RC and diamond drill holes drilled pre-2010.
Kavanagh Mineral Resource Drilling
Underground diamond drilling to confirm the copper mineral systems and enable detailed mine design
and planning commenced in June 2023 and is continuing.
From 1st June to 31st December 2023, HGO has drilled 173 holes from underground for 9,342 samples
for assay within the Kavanagh-Spitfire mineral system. This compares to the 11,570 assays from the
surface drilling during 2019 to 2023. An update to the Mineral Resource Estimate will be released in 2024.
Underground diamond drilling to map the grade continuity of the main Kavanagh mineral system has
returned outstanding results within the underground mining footprint. For a list of results refer to ASX
release of 13 November 2023. The results include:
36.6m @ 3.35% Cu (uncut) from 43m downhole in East Kavanagh (23KVUG064), including:
o
2.1m @ 24.76 % Cu (uncut) from 53m downhole
40m @ 1.27% Cu (uncut) from 91m downhole in Central Kavanagh (23KVUG072)
33.23m @ 1.46% Cu (uncut) from 42m downhole in East Kavanagh (23KVUG083)
44m @ 1.06% Cu (uncut) from 69m downhole in Central Kavanagh (23KVUG068)
26.4m @ 1.39% Cu (uncut) from 47.9m downhole in East Kavanagh (23KVUG085)
21.55m @ 1.45% Cu (uncut) from 93.45m downhole in Central Kavanagh (23KVUG047)
The infill underground diamond drilling demonstrates that the exploration drilling results previously
reported for the Kavanagh and Spitfire mineral zones are being confirmed. Figure 7 shows the drill core
from this high-grade copper intersection.
Page 6
Figure 7 Cu-Au mineralisation in 23KVUG064 through the East Kavanagh Lode
The interval 51.65m to 55.1m shown in this photo is an average of 3.45m @ 19.91% Cu
Kanmantoo Deeps
The AMT/MT survey completed in 2023 and previously reported (11 October 2023) along the northern
strike extension of the main Kavanagh Cu-Au zone identified a strong and large conductivity zone
beneath the northern extension of the Kanmantoo open pit. The 1.0 km long conductivity zone is
coincident with a strong ground gravity and heli-magnetic anomaly. The coincident gravity-magneticconductivity anomaly is interpreted to be due to a higher concentration of garnet, magnetite and sulphides
along the Kanmantoo shear zone.
3D inversion modelling of the MT data was completed during the quarter and the centre of the upper
portion of the 20 ohm.m conductivity zone is interpreted to be at 610mRL (590m below surface and
approximately 400 metres to the north of the planned Kavanagh decline.
In the event this large zone of high conductivity, high density and high magnetic anomalism (which are
all geophysical characteristics of the main Kanmantoo mineralisation) represents a sulphide
accumulation, then it is a significant exploration prospect within the Mine Lease.
The Exploration Target was updated on 11 October 2023 to include the Kanmantoo Deeps. The revised
Exploration Target is 60-100Mt, with a grade range of grade range of 0.9-1.2%Cu and 0.1-0.2g/t Au. The
Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral
Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource under
the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, the
JORC Code” (JORC 2012). The Exploration Target is not being reported as part of any Mineral Resource
or Ore Reserve.
The scale of the Kanmantoo Deeps target represents an exciting opportunity for the Company.
Page 7
Figure 8 Geophysical interpretation of the Kanmantoo Deeps Target
Table 1 Summary of Exploration Target by Zone
Deposit
Exploration Target
Max RL
Tonnage Range
Depth
(Mt)
Grade Range
(Cu %)
Grade Range
(Au g/t)
Kavanagh
400
4-6
1.0 - 1.4
0.1 - 0.3
Nugent
600
2-4
0.8 - 1.3
0.3 - 0.5
Emily Star
600
1-4
0.8 - 1.2
0.1 - 0.2
Paringa
600
1-2
0.8 - 1.2
0.2 - 0.3
North Kavanagh
600
1-2
0.8 - 1.2
0.1 - 0.2
Coopers
600
1-2
0.8 - 1.2
0.1 - 0.2
600 - 000
50 - 80
0.8 – 1.2
0.1 – 0.2
60 - 100
0.9 - 1.2
0.1 - 0.2
2-4
2-4
0.8 - 1.2
0.8 - 1.2
0.1 - 0.3
0.1 - 0.3
Kanmantoo Deeps
TOTAL MINE LEASE
South Kanmantoo (EL6526)
Stella (EL 6526)
600
600
Page 8
Near Mine Exploration
The Cu-Au targets within 10 kms of the Kanmantoo processing plant include the South Kanmantoo,
Stella, Mullewa and North-West Kanmantoo geochemical and geophysical targets. There has not been
any work on these prospects in this quarter.
Regional Exploration
The regional area comprises 5,652km2 of exploration licences in the south-east of South Australia, within
the Kanmantoo Province. The Kanmantoo Province is now being investigated by the Geological Survey
of South Australia (GSSA) and MINEX-CRC for its magmatic related copper-gold endowment as a
consequence of the discoveries on the Stavely Belt in western Victoria. Geological work by the GSSA
has concluded that Cu mineralisation within the Kanmantoo Province occurs over four distinct periods
from onset of the Delamerian Orogen (early Cambrian) to the close of the Benambran Orogen (midOrdovician – the same orogen that resulted in the Macquarie Arc Cu-Au mineralisation of CadiaRidgeway renown). This opens up the window of prospectivity of the Kanmantoo Province and in
particular the tenement holding of Hillgrove for significant Cu-Au mineralisation.
The new interpretation of new mineral system models operating within the Kanmantoo Province will be a
focus for Hillgrove’s future regional exploration activities.
Competent Persons Statement
The information in this report that relates to the Exploration and Drilling Results and Exploration Targets
on the Kanmantoo project were initially reported by the Company to ASX on 26 May 2016, 10 October
2019, 3 September 2020, 3 May 2021, 6 May 2021, 24 June 2021, 26 August 2021, 1 September 2021,
21 March 2022, 6 May 2022, 11 May 2022, 26 July 2022, 8 August 2022, 27 February 2023, 23 March
2023, 3 July 2023, 28 August 2023, 11 October 2023 and 13 November 2023. The Company confirms
that it is not aware of any new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical parameters underpinning
the Exploration Results, Exploration Target and the Resource Estimate in the relevant market
announcement continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Person's findings are presented have not been materially modified
from the original market announcements.
The information in this release that relates to the 2022 Mineral Resource Estimates for the Nugent (26
July 2022) and Kavanagh (11 May 2022) underground areas are based upon information compiled by Mr
Peter Rolley, who is a Member of The Australasian Institute of Geoscientists. Mr Rolley is a full-time
employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of
mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves (JORC Code)’. Mr Rolley has consented to the inclusion in the release of the matters based
on their information in the form and context in which it appears.
Page 9
HILLGROVE CORPORATE
For the quarter, the Company incurred the following exploration and development expenditures:
Exploration of $0.1 million; and
Development of $12.0 million, which includes $0.1 million for mine lease drilling.
The Company paid executive director salaries and non executive director fees of $214,000 during the
quarter.
CORPORATE INFORMATION
Issued Share Capital at 31 December 2023
Ordinary shares
Unlisted Options
Employee Performance Rights
Share price activity for the Quarter
High
Low
Last (31 December 2023)
1,911,971,009
69,000,000
47,000,000
0.095
0.054
0.094
Page 10
SHARE REGISTRY
REGISTERED OFFICE
Boardroom Limited
GPO Box 3993
Sydney NSW 2001, Australia
F: +61 2 9279 0664
T: (within Australia) 1300 737 760
T: (outside Australia) +61 2 9290 9600
Hillgrove Resources Limited
Ground Floor
5-7 King William Road
Unley, South Australia, Australia
E: info@hillgroveresources.com.au
T: +61 8 7070 1698
For more information contact:
Lachlan Wallace, Managing Director
Joe Sutanto, Chief Financial Officer
SCHEDULE OF TENEMENTS AS AT 31 DECEMBER 2023
Tenement
Location
Percentage
ML 6345
Kanmantoo, South Australia
100%
ML 6436
Kanmantoo, South Australia
100%
EML 6340
Kanmantoo, South Australia
100%
EL 6526
Kanmantoo, South Australia
100%
EL 6174
Coomandook, South Australia
100%
EL 6175
Coonalpyn, South Australia
100%
EL 6207
Tintinara, South Australia
100%
EL 6208
Carcuma, South Australia
100%
EL 6294
Wynarka, South Australia
100%
EL 6397
Laffer, South Australia
100%
Page 11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Hillgrove Resources Limited
ABN
Quarter ended (“current quarter”)
73 004 297 116
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
17
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(3,261)
(7,623)
(e) administration and corporate costs
(3,170)
(5,003)
-
-
182
762
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST)
1,639
3,070
1.9
Net cash from / (used in) operating
activities
(4,610)
(8,777)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(9,386)
(21,824)
(196)
(689)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
55
55
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(9,527)
(22,458)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
38,435
(c) property, plant and equipment
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(1,601)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (payment of lease liabilities)
(303)
(664)
3.10
Net cash from / (used in) financing
activities
(303)
36,170
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
24,680
5,305
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(4,610)
(8,777)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(9,527)
(22,458)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(303)
36,170
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
10,240
10,240
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
10,240
24,680
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
10,240
24,680
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
214
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
5.1
Bank balances
5.2
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
The amount in item 6.1 comprises executive director salaries and non executive director fees during
the quarter.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(4,806)
8.4
Cash and cash equivalents at quarter end (item 4.6)
10,240
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
(4,610)
(196)
10,240
2.1
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
22 January 2024
Date:
...................................................................................
By the Board
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover