Firehawk Geophysics Defines Drill Targets
Released
Released
Announcement PDF
1 of 10
14 OCTOBER 2026
FIREHAWK GEOPHYSICS DEFINES DRILL TARGETS
• Multiple geophysical datasets define a compelling copper drill target at Firehawk.
• Coincident magnetic and gravity anomalies identified adjacent to a moderate strength induced polarisation
(IP) response.
• Five-hole conceptual drilling program designed to test a potential Delamerian copper system, with drilling
targeted for H1 2027.
Kantra Copper Limited (Kantra or Company) (ASX:KAN) is pleased to advise that integrated airborne magnetic, gravity
and induced polarisation (IP) surveys completed at its Firehawk Prospect, located approximately 80 kilometres (km)
from Adelaide within Exploration Licence (EL) 6294, have successfully refined a regional geophysical anomaly into a
drill-ready exploration target.
The surveysdefined a coincident magnetic and gravity anomaly adjacent to a strongIP response, providing a compelling
target for follow-up drilling designed to test for concealed copper (Cu) ± molybdenum (Mo) ± gold (Au) mineralisation
beneath shallow cover.
Commenting on the Firehawk drill target, Kantra CEO and Managing Director, Bob Fulker said:
“Firehawk is a good example of Kantra's
exploration strategy in action. We have
secured a strategic land position within one
of South Australia's key mineral provinces
and are systematically applying modern
geophysics and data-driven targeting
techniques to identify the highest-priority
opportunities.
“The integration of magnetic, gravity and IP
datasets has transformed Firehawk from a
regional concept into a well-defined drill
target. Together with the Kanappa
Prospect, where a two-hole drilling program
has recently been completed and assay
results are pending, Firehawk forms part of
Kantra's broader regional exploration
strategy aimed at identifying additional
sources of long-term copper growth and
development optionality to complement
the Company's flagship Kanmantoo Copper
Mine.”
Figure 1:Map of the Firehawk prospect and the Kantra Southeastern
Tenements.
2 of 10
The Firehawk prospect was initially identified from a regional-scale magnetic anomaly interpreted to potentially
represent felsic intrusive rocks. Kantra subsequently completed airborne magnetic, gravity and IP surveys that refined
the target into discrete zones of coincident geophysical anomalism.
Figure 2: Plan view of the proposed Firehawk drill program with -250RL IP depth slice, magnetic high (orange) and
gravity high (blue).
The IP and gravity surveys were conducted in two phases with an early survey completed along fencelines prior to a
targeted infill survey on a 100 metre (m) spacing. The airborne drone magnetic survey was completed over the entire
prospect on a 40m line spacing to supplement existing regional data. These surveys showed a coincident magnetic and
gravity anomaly with an adjacent IP anomaly. These zones of anomaly provide a drilling target.
3 of 10
Figure 3: Section looking north at 6121836mN showing Proposed Southern Firehawk drill line (4 holes), coincident
mag (orange) and gravity (blue) anomalies.
The proposed drilling program has been designed to test whether the coincident magnetic, gravity, IP and data-driven
prospectivity responses represent a concealed Delamerian porphyry Cu±Mo±Au system. The program will also test
alternative interpretations, including Cu–Au skarn, structurally controlled sulphide mineralisation and non-mineralised
geological sources. The principal geoscientific objectives are:
• to determine the lithology responsible for the geophysical responses; identify any intrusive rocks,
hydrothermal alteration and mineralisation;
• establish the basement stratigraphy and structural architecture; and
• constrain the existing geophysical models using direct geological observations.
• The conceptual five-hole drilling program has been designed to systematically test the priority geophysical
anomalies while improving understanding of the regional geology and mineral system architecture at
Firehawk. Drilling is currently planned for H1 2027 to accommodate the local farming cycle.
4 of 10
Authorised for release by the Board of Kantra Copper Limited.
Engage with this announcement at the Kantra Copper Investor Hub.
For more information contact:
Mr Bob Fulker Mr Luke Anderson
Chief Executive Officer & Managing Director Chief Financial Officer & Joint Company Secretary
Tel: +61 (0)8 7070 1698 Tel: +61 (0)8 7070 1698
Ms Jane Brunton
Head of Investor Relations & Growth
T: +61 (0)8 7070 1698
E: info@kantra.com
Forward Looking Statement
This Report contains or may contain certain forward-looking statements and comments about future events, that
are based on Kantra's beliefs, assumptions and expectations and on information currently available to
management as at the date of this presentation. Often, but not always, forward-looking statements can generally
be identified by the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate",
"anticipate", "outlook", and "guidance", or similar expressions, and may include, without limitation, statements
regarding plans, strategies and objectives of management, anticipated production and production potential,
financial forecasts, product quality estimates of future Mineral Resources and Ore Reserves. Such statements are
only expectations or beliefs and are subject to inherent risks and uncertainties which could cause actual values,
results or performance achievements to differ materially from those expressed or implied in this announcement.
Where Kantra expresses or implies an expectation or belief as to future events or results, such expectation or belief
is expressed in good faith and on a reasonable basis. No representation or warranty, express or implied, is made by
Kantra that the matters stated in this presentation will in fact be achieved or prove to be correct. Except as required
by law, Kantra undertakes no obligation to provide any additional or updated information or update any forward-
looking statements whether as a result of new information, future events, results or otherwise. Readers are
cautioned against placing undue reliance on forward-looking statements. These forward-looking statements are
not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other
important factors, many of which are beyond the control of Kantra, the directors, and management of Kantra. These
factors include, but are not limited to difficulties in forecasting expected production quantities, the potential that
any of Kantra's projects may experience technical, geological, metallurgical and mechanical problems, changes in
market prices and other risks not anticipated by Kantra, changes in exchange rate assumptions, changes in product
pricing assumptions, major changes in mine plans and/or resources, changes in equipment life or capability,
emergence ofpreviously underestimatedtechnicalchallenges, increased costs, and demand for production inputs.
5 of 10
Competent Persons Statement
As an Australian company with securities listed on the Australian Securities Exchange (ASX), Kantra is subject to
Australian disclosure requirements and standards, including the requirements of the Corporations Act and the
ASX. Investors should note that it is a requirement of the ASX listing rules that the reporting of ore reserves and
mineral resources in Australia comply with the 2012 edition of the Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code).
The information in this release that relates to the Geophysical Interpretation is based upon information compiled
by Russell Mortimer, who is a Member of The Australasian Institute of Geoscientists (AIG). Russell Mortimer is a
contractor engaged by the company and has sufficient experience relevant to the styles of mineralisation and type
of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code)’. Russell Mortimer
has consented to the inclusion in the release of the matters based on their information in the form and context in
which it appears.
The information in this release that relates to the Geological Interpretation is based upon information compiled by
Caitlin Rowett, who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM CP (Geo)). Caitlin
Rowett is a full-time employee and holds equity in Kantra Copper Limited and has sufficient experience relevant to
the styles of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code)’. Caitlin Rowett has consented to the inclusion in the release of the matters based on their
information in the form and context in which it appears.
6 of 10
APPENDIX A – JORC TABLE 1
Section 1 Sampling Techniques and Data
Criteria Commentary
Sampling
techniques
Reporting results from UAV magnetic, gravity and IP surveying undertaken during 2025/2026 at the Firehawk Project.
UAV magnetic surveying was completed by Pegasus Airborne Systems at the Firehawk Project during November 2025 – 40m line spacing EW, ~25m terrain
clearance.
Gravity surveying was performed by Daishsat Geodetic Surveyors at the Firehawk Project during July/August 2025 – reconnaissance manner along
roads/tracks ~50m station spacing.
More systematic prospect/target scale gravity surveying was performed by Daishsat Geodetic Surveyors at the Firehawk Project during March 2026 – EW
grid pattern ~100m line spacing and ~50m station spacing.
Pole-Dipole IP surveying was performed by Australian Geophysical Services at the Firehawk Project during October/November 2025 – reconnaissance
manner along roads/tracks - 100m RX/TX dipole spacing, 50m RX/TX offset.
More systematic prospect/target scale Pole-Dipole IP surveying was performed by Australian Geophysical Services at the Firehawk Project during April
2026 – ~250-350m line spacing grid pattern - 50m RX/TX dipole spacing, 50m RX/TX offset.
No drilling is being reported.
Drilling techniques No drilling involved so not applicable.
Drill sample
recovery
No drilling involved so not applicable.
Logging No drilling involved so not applicable.
7 of 10
Criteria Commentary
Sub-sampling
techniques and
sample preparation
No drilling involved so not applicable.
Quality of assay data
and laboratory tests
No drilling involved so not applicable.
Verification of
sampling and
assaying
Verification of acquired gravity, UAV magnetics and IP data was completed by both the sub-contractor involved and consultant geophysicist – Russell
Mortimer.
Location of data
points
The map projection of Map Grid of Australia 1994 - Zone 54, (MGA94-54) was utilised.
Data locations/elevations for gravity, UAV magnetics and IP were accurately defined via high-quality GPS / DGPS instruments.
8 of 10
Criteria Commentary
Figure 4: Geophysical Survey Data Points
Data spacing and
distribution
UAV magnetic surveying was completed in a detailed systematic manner - 40m line spacing with approximately 25m terrain clearance.
The 2025 IP surveying was completed along roads/tracks in a reconnaissance manner - 100m RX/TX dipole spacing, 50m RX/TX offset - pole-dipole
configuration.
The 2026 IP surveying was ~250-350m line spacing grid pattern - 50m RX/TX dipole spacing, 50m RX/TX offset - pole-dipole configuration.
9 of 10
Criteria Commentary
The 2025 gravity surveying was completed along roads/tracks in a reconnaissance manner - ~50m station spacing.
The 2026 gravity surveying was ~100m line spacing grid pattern - ~50m station spacing.
Orientation of data
in relation to
geological structure
The 2025 detailed UAV magnetic survey was orientated east-west approximately normal to the strike of the local geological sequence.
The 2025 IP surveying was completed along roads/tracks in a reconnaissance manner.
The 2026 IP surveying was completed on an east-west grid approximately normal to the strike of the local geological sequence.
The 2025 gravity surveying was completed along roads/tracks in a reconnaissance manner.
The 2026 gravity surveying was completed on an east-west grid approximately normal to the strike of the local geological sequence.
Sample security All data electronically despatched to the office of the sub-contractor each evening / on a regular basis.
Audits or reviews Reviews of acquired gravity, UAV magnetics and IP data was completed by both the sub-contractor involved and consultant geophysicist – Russell
Mortimer.
Section 2 Reporting of Exploration Results
Criteria Commentary
Mineral tenement
and land tenure
status
Firehawk is ~80km East of Adelaide and 21km North East from Murray Bridge located on EL 6294 which is owned 100% by Kantra Copper Limited (KAN).
Land surrounding the prospect is used for grazing and cropping. Kantra have engaged with the landowners to facilitate this study.
Exploration done by
other parties
Regional exploration has been completed by previous companies including Pasminco who completed drillholes around 20km south of the target area.
Regional aerial magnetic datasets have been compiled by Geoscience Australia. Kantra Copper has undertaken analysis of regional datasets and
compilation of past work across the broader project area including mineral systems modelling, soil auger sampling and geophysical surveys. No previous
10 of 10
Criteria Commentary
drilling has been completed at the Firehawk prospect.
Geology Targets are located in Delamerian basement sequence, consisting of strongly deformed and metamorphosed Kanmantoo group metasediments,
including quartz–feldspar–mica-rich rocks with subordinate carbonate-rich and calc-silicate units. The target is hypothesised to be felsic intrusives that
have intruded the Kanmantoo group metasediments
Drill hole
Information
No new drill holes are quoted in this release.
Data aggregation
methods
No data aggregation or equivalent calculations
Mineralisation
widths
No new intersections reported in this release.
Diagrams Diagrams that are relevant to this release have been included in the body of the release.
Balanced reporting All gravity, magnetics and IP data has been reviewed in the generation of this release and compared to existing geological and geophysical models.
Other exploration
data
Information collected has been reviewed against existing exploration datasets.
Further work Geological interpretation/analysis of the critical geophysical results/inversion outcomes will be used to generate drilling targets.
Share your feedback
Discover