High-Grade Copper-Gold Extensions at Nugent
Released
Released
Announcement PDF
16 September 2025
HIGH-GRADE COPPER-GOLD EXTENSIONS AT NUGENT
High Grade Copper-Gold mineralisation extensions discovered during extensional and infill drilling at Nugent, with
multiple outstanding intersections returned, including:
▪
21m @ 0.85% Cu + 0.98g/t Au from 136m downhole in 25KVUG0653
▪
15m @ 0.91% Cu + 0.29g/t Au from 161m downhole in 25KVUG0653
▪
11.5m @ 0.99% Cu + 0.79g/t Au from 145.5m downhole in 25KVUG0543
o
Including 4m @ 1.93% Cu +1.14g/t Au from 153m
▪
8m @ 0.85% Cu + 0.36g/t Au from 177m downhole in 25KVUG0555
▪
5m @ 1.43% Cu + 0.34g/t Au from 194m downhole in 25KVUG0555
▪
3m @ 0.98% Cu + 0.99g/t Au from 171m downhole in 25KVUG0559
▪
4m @ 0.76% Cu + 0.46g/t Au from 177m downhole in 25KVUG0559
Hillgrove Resources Limited (Hillgrove) (ASX:HGO) is pleased to provide the following drilling update from the
Kanmantoo Copper Mine. The Nugent drilling program from the 1010 Diamond Drill Site and the 1040 Nugent Drill
Site has been completed and delivered excellent results which improve the understanding of the Nugent orebody in
preparation for first production. These results have increased the Gold endowment and improved knowledge of the
Copper-Gold distribution.
Au g/t
Figure 1: Plan View of drilling showing the high Gold grades intersected at the Southern end of Nugent against the 2024 MRE
sliced at the 1020 metre RL displaying Gold grades.
1 of 12
Commenting on the drilling results, Hillgrove CEO and Managing Director, Bob Fulker said:
“It is encouraging that each time we test a geological theory we continue to identify additional
mineralisation and gain a better understanding of the controls on mineralisation. These results are
very exciting, as they provide a greater understanding of the Gold distribution throughout Nugent. It
was previously thought that the Southern extent of Nugent had lower Gold grade, based on previous
drilling, but these results show this is not the case.
It is also pleasing that as we drill beyond our current understanding of the Nugent ore body, we
continue to encounter an expanding alteration corridor with Copper and Gold mineralisation within it.
The Nugent 1020 Southern Ore Drive will commence stoping in the December quarter this year.”
Figure 2: View towards the east showing the high Copper grades intersected at the Southern end of Nugent against the 2024
MRE displaying Copper Grades
2 of 12
The Nugent drilling completed to date has targeted resource definition, with the focus shifting in recent weeks to
grade control as first Nugent production draws closer. The recent assays from the 1010 diamond drill site have a
dual purpose of both grade control and resource definition, with the results sitting further south-west than previously
identified from resource drilling at surface. The high-grade intersections include 21metres @ 0.85% Cu and 0.98g/t
Au (uncut) from 136 metres downhole in 25KVUG0653 and 11.5 metres @ 0.99% Cu & 0.79g/t Au (uncut) from
145.5 metres downhole in 25KVUG0543. These results improve the understanding of high-grade geometry and
interaction of the Copper and Gold bearing fluids in the alteration corridor.
Drilling is ongoing for both stope definition and resource expansion throughout the Kanmantoo system, with
upcoming Nugent drilling planned to target the northern end of the 1020 level. This will provide input into future
planning alongside operational requirements for stope and development designs. Drilling is currently underway from
the 1010 diamond drill site targeting Emily Star, with initial results pending.
Figure 1 above details the location of significant intersections relating to the current 2024 Kanmantoo Mineral
Resource Estimate1 gold values, with gold results displayed for the drilling results. The full list of significant
intersections is included in Table 1 below. Figure 2 above details a section view of drilling results showing the
Copper results against the 2024 Kanmantoo Mineral Resource Estimate1 Copper values.
Drilling from underground remains on track to achieve the target of 60,000 metres by the end of the calendar year.
August delivered 8,114.6 metres of diamond drilling, which is a record for the company to date. Year-to-date, a total
of 42,816.2 metres has been drilled. An updated Resource estimation will be released in the December quarter
2025 inclusive of drilling results up to mid-August.
Authorised for release by the Board of Hillgrove Resources Limited.
For more information contact:
Mr Bob Fulker
CEO & Managing Director
Tel: +61 (0)8 7070 1698
Mr Luke Anderson
Chief Financial Officer
Tel: +61 (0)8 7070 1698
1
Refer to ASX release on 18 October 2024 titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral
Resource Endowment’
3 of 12
Competent Person's Statement
The information in this release that relates to the Exploration Results is based upon information compiled by Caitlin
Rowett, who is a Member of The Australasian Institute of Mining and Metallurgy. Caitlin Rowett is a full-time
employee and holds equity in Hillgrove Resources Limited and has sufficient experience relevant to the styles of
mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC
Code)’. Caitlin Rowett has consented to the inclusion in the release of the matters based on their information in the
form and context in which it appears.
The information in this report that relates to the 2024 Kanmantoo Mineral Resource Estimate is extracted from ASX
release titled ‘Maiden Kanmantoo Underground Ore Reserve and 96% Increase in Copper Mineral Resource
Endowment’ dated 18 October 2024 and is available to view at www.hillgroveresources.com.au. The Company
confirms that it is not aware of any new information or data that materially affects the information included in the
original market announcement and that all material assumptions and technical parameters underpinning the Mineral
Resource Estimate in the relevant market announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person's findings are presented have not been
materially modified from the original market announcements.
Forward Looking Statement
This Report contains or may contain certain forward-looking statements and comments about future events, that are
based on Hillgrove's beliefs, assumptions and expectations and on information currently available to management
as at the date of this presentation. Often, but not always, forward-looking statements can generally be identified by
the use of forward-looking words such as "may", "will", "expect", "plan", "believes", "estimate", "anticipate", "outlook",
and "guidance", or similar expressions, and may include, without limitation, statements regarding plans, strategies
and objectives of management, anticipated production and production potential, financial forecasts, product quality
estimates of future Mineral Resources and Ore Reserves. Such statements are only expectations or beliefs and are
subject to inherent risks and uncertainties which could cause actual values, results or performance achievements
to differ materially from those expressed or implied in this announcement. Where Hillgrove expresses or implies an
expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a
reasonable basis. No representation or warranty, express or implied, is made by Hillgrove that the matters stated in
this presentation will in fact be achieved or prove to be correct. Except as required by law, Hillgrove undertakes no
obligation to provide any additional or updated information or update any forward-looking statements whether on a
result of new information, future events, results or otherwise. Readers are cautioned against placing undue reliance
on forward-looking statements. These forward-looking statements are not guarantees of future performance and
involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are
beyond the control of Hillgrove, the directors, and management of Hillgrove. These factors include, but are not
limited to difficulties in forecasting expected production quantities, the potential that any of Hillgrove's projects may
experience technical, geological, metallurgical and mechanical problems, changes in market prices and other risks
not anticipated by Hillgrove, changes in exchange rate assumptions, changes in product pricing assumptions, major
changes in mine plans and/or resources, changes in equipment life or capability, emergence of previously
underestimated technical challenges, increased costs, and demand for production inputs.
4 of 12
APPENDIX A
The objective of the ongoing underground diamond drilling program has been to expand the mineral system within
the Kanmantoo Mine Lease. Appendix B JORC Table 1, sections 1 and 2 describe the drilling, sampling, and
assaying processes.
Table 1
List of drill intercepts in this release
Intercepts tabulated in the table are amalgamated over a minimum down hole length of 3m > 0.3% Cu with a maximum of 2m
internal dilution < 0.3% Cu. Or a minimum down hole length of 3m > 0.3g/t Au with a maximum of 1m internal dilution < 0.3g/t
Au. No assays were cut before amalgamating the intercept
Depth To
Interval
Length (m)
Cu %
Au g/t
145.5
157
11.5
0.99
0.79
1.8
149
152.5
3.5
0.53
0.71
0.57
4 Acid/ICP-MS
177
185
8
0.85
0.36
1.09
Nugent
4 Acid/ICP-MS
194
199
5
1.43
0.34
4.72
Nugent
4 Acid/ICP-MS
115
121
6
0.07
0.86
0.16
25KVUG0559
Nugent
4 Acid/ICP-MS
131
134
3
0.45
0.01
1.48
25KVUG0559
Nugent
4 Acid/ICP-MS
160
168
8
0.64
0.19
0.7
25KVUG0559
Nugent
4 Acid/ICP-MS
171
174
3
0.98
0.99
1.75
25KVUG0559
Nugent
4 Acid/ICP-MS
177
181
4
0.76
0.46
1.5
25KVUG0653
Nugent
4 Acid/ICP-MS
136
157
21
0.85
0.98
1
25KVUG0653
Nugent
4 Acid/ICP-MS
161
176
15
0.91
0.29
1.02
25KVUG0658
Nugent
4 Acid/ICP-MS
108
116
8
0.48
0.21
1.6
Hole ID
Target Zone
Assay Method
Depth From
25KVUG0543
Nugent
4 Acid/ICP-MS
25KVUG0555
Nugent
4 Acid/ICP-MS
25KVUG0555
Nugent
25KVUG0555
25KVUG0559
Table 2
Ag g/t
Drill Hole Collars
Hole id
Site type
Max. Depth
Survey
Method
Nat grid id
Easting
Northing
25KVUG0543
DDH
185.3
Total Station
MGA94_54
318294.3142
6114553.539
1042.798
25KVUG0555
DDH
210.3
Total Station
MGA94_54
318294.4568
6114553.69
1042.4364
25KVUG0559
DDH
210.1
Total Station
MGA94_54
318294.8216
6114553.874
1041.9792
25KVUG0653
DDH
200.7
Pivot point
MGA94_54
318294.85
6114555.72
1042.88
25KVUG0658
DDH
138
Pivot point
MGA94_54
318228.77
6114520.56
Final collar survey to be adjusted when rig is moved from pivot point
1018.53
Height
5 of 12
Table 3
SITE_ID
Drill Hole Downhole Survey
DEPTH
AZIMUTH
DIP
SITE_ID
25KVUG0543
0
189.99
1.81
25KVUG0559
25KVUG0543
15
189.88
1.55
25KVUG0559
25KVUG0543
30
189.89
1.52
25KVUG0559
25KVUG0543
60
189.88
1.61
25KVUG0559
25KVUG0543
90
190.29
1.41
25KVUG0543
120
188.88
25KVUG0543
150
188.82
25KVUG0543
180
25KVUG0547
0
25KVUG0547
DEPTH
AZIMUTH
DIP
0
182
-22.36
15
182.48
-22.59
30
182.59
-22.34
60
183.04
-21.71
25KVUG0559
90
183.46
-21.47
1.64
25KVUG0559
120
184.34
-21.19
1.61
25KVUG0559
150
184.9
-20.78
189.77
-0.16
25KVUG0559
180
185.83
-19.65
79.99
0.33
25KVUG0559
210
186.64
-19.26
15
80.32
0.47
25KVUG0653
0
172
-33.62
25KVUG0547
30
80.77
0.83
25KVUG0653
15
172.42
-33.32
25KVUG0547
60
81.66
1.77
25KVUG0653
30
172.53
-33.2
25KVUG0547
90
82.31
2.21
25KVUG0653
60
172.71
-32.58
25KVUG0547
120
82.62
2.15
25KVUG0653
90
173.36
-31.72
25KVUG0547
150
82.89
2.37
25KVUG0653
120
173.46
-30.64
25KVUG0547
180
83.34
3.54
25KVUG0653
150
173.48
-31.31
25KVUG0547
196
83.69
4.11
25KVUG0653
180
174.47
-29.88
25KVUG0555
0
188.99
-14.57
25KVUG0653
200
174.72
-29.5
25KVUG0555
15
189.09
-13.57
25KVUG0658
0
125.99
4.13
25KVUG0555
30
189.18
-13.2
25KVUG0658
15
125.96
4.56
25KVUG0555
60
189.67
-12.54
25KVUG0658
30
125.98
4.69
25KVUG0555
90
189.74
-12.36
25KVUG0658
60
125.67
4.73
25KVUG0555
120
190.13
-12.03
25KVUG0658
90
125.66
5.17
25KVUG0555
150
190.32
-11.9
25KVUG0658
120
125.66
7.19
25KVUG0555
180
190.46
-11.61
25KVUG0658
135
125.53
7.43
25KVUG0555
210
190.61
-11.61
6 of 12
APPENDIX B – JORC Table 1
Section 1
Sampling Techniques and Data
Criteria
Commentary
Sampling
techniques
•
•
•
The Diamond Drill Hole (DDH) sampling was conducted as per the Hillgrove procedures and QAQC protocols.
Sample intervals from 1.2m to 0.30m as determined by geology through visibly mineralised zones were split from the drill core, with the core whole core
sampled and crushed via the onsite sample preparation lab before passing to the onsite XRF Lab. A 25% split of this sample was saved and this split was
sent to ALS Adelaide for processing.
Samples were prepared by ALS Adelaide with each sample being wholly pulverised to >85% passing <75µm.
Drilling
techniques
•
All UG drilling is undertaken by external drilling contractor, DRC Drilling. All holes drilled with NQ. NQ Core size is 47.6mm in diameter.
Drill sample
recovery
•
Recovered drill core metres were measured and compared to length of drill hole advance to calculate core recovery for every core run. On average sample
recovery is >98%. There is no correlation between sample recovery and copper grades in this DDH drill program.
When intersecting the fractured rock aquifers sample recovery has been observed to decrease for a discrete zone before returning to standard conditions
•
Logging
•
•
•
•
Sub-sampling
techniques and
•
All drill core was logged for lithology, alteration, structure, weathering and mineralisation by Hillgrove geologists in accordance with Hillgrove’s Core
Logging Procedure. Colour and any additional qualitative comments are also recorded.
High quality photographs of all drill core before being sampled were taken under controlled light at the HGO core yard at Kanmantoo.
All geological logging is recorded into Geobank (a database product from Micromine) templates and visually validated before being imported into the
Hillgrove drill hole database. Additional validation is conducted automatically on import.
In addition, a geotechnical log of all drill core is recorded utilising standard geotechnical logging indexes. RQD is 98-100%. UG drill core is selectively
oriented. Where required, orientation of structure relative to the dominant S2 foliation is recorded.
For all sampled intervals the 25% crushed sample was despatched to ALS and the entire sample was then sub sampled for a 1kg riffle split from the
crushed mass and the 1kg sub-sample then pulverised. A sub-split of 200 grams was then split by ALS and retained, and the reject pulverised material
7 of 12
Criteria
sample
preparation
Quality of assay
data and
laboratory tests
Commentary
•
•
•
returned to Hillgrove. From the 200 gram sub-split a 2 gram aliquot was scooped and weighed by ALS for 4-acid digestion.
Hillgrove have detailed sampling and QAQC procedures in place to ensure sample collection is carried out to maximise representivity of the samples, to
minimise contamination, and to maintain sample numbering integrity.
The samples were submitted to ALS for analysis. ALS code ME-MS61 using a 4-acid digest with determination by Mass Spectrometry. If the copper result
was greater than 1%, the analysis was repeated using a modified acid digestion technique. Gold is assayed by 30g Fire Assay. If > 10 g/t then repeated by
fire assay with a gravimetric finish.
The QAQC of sample preparation and analysis processes were via the following samples:
o Insertion of blank reference material at a minimum of 1 in 20 samples or directly after High grade intersections.
8 of 12
Criteria
Commentary
•
•
•
o Laboratory QAQC samples were inserted with a minimum of two standards and one blank for every batch of 40 samples.
Results from all returned QAQC samples provide reasonable confidence as to the accuracy of the assay results used in the estimation. >90% of assays fall
within 2SD of the expected CRM mean grade for Cu and Au.
Quartz flushes with <60ppm Cu are introduced to the crushers and bowl pulverisers within every high sulphide interval. These are monitored and where Cu
contamination of the quartz flush occurs the batch is repeated. For the holes reported there are no examples of sulphides contaminating successive
samples via sample preparation processes. Through the onsite crusher every 20 samples is a crusher flush on top of the geologist inserted blanks to
prevent down hole contamination from high grade material.
Hillgrove‘s quality policy is that at a minimum of 1 in 20 of all samples are QAQC Samples resulting in a minimum of 10% of all samples submitted for
analysis are Hillgrove QAQC samples.
9 of 12
Criteria
Commentary
Verification of
sampling and
assaying
•
Sample data sheets are prepared in Geobank Field Teams and printed for technicians use. All core is marked for sampling and confirmed by the logging
geologist. Sample Sheets also include the sample number sequence and the sample numbers to be assigned to the QAQC samples. Sample intervals input
from the excel spreadsheet into an SQL database via Geobank. Data was visually checked by the Geologist prior to import and additional validation was
carried out by the database upon import. Copper results were reported in ppm units from the laboratories and then converted to a % value within the
database.
Location of data
points
•
•
•
•
The map projection of Map Grid of Australia 1994 - Zone 54, (MGA94-54) is used for all work undertaken for this drilling.
The UG rigs set ups are aligned by qualified surveyors setting up the drill rigs in the UG drill access.
All drill hole collars are surveyed with a Leica survey total station. The accuracy of this instrument is 0.01m. All pick-ups were reported in MGA94-54
coordinate system once the drill rig is moved from the collar pivot point. The hole reported will have the collar point adjusted at the conclusion of drilling
from this site.
Downhole surveys were determined using a gyro survey instrument at 12m intervals and recorded in Grid North.
Data spacing and
distribution
•
See Table 2 above and Figures 1 and 2 in the body of the text for drill hole locations.
Orientation of
data in relation to
geological
structure
•
•
•
•
All holes are angled drill holes, dipping between 7.5 to -33 deg. Drill holes are orientated towards the South from 125deg to 190deg (MGA Grid North).
All down hole surveys are by Reflex or Axis Gyro. There is no oriented UG drill core.
Dominant mineralisation trends as measured from in-pit and Underground mapping are strike ~040deg and dip -75deg to east.
It is important to note that current drill holes are all at various strike and dip angles to section, and that the true width varies for each intersection.
10 of 12
Criteria
Commentary
Sample security
•
•
•
•
Audits or reviews
Section 2
•
A Hillgrove employee is responsible for collecting and organising the samples ready for assay. Hillgrove has a detailed sample collection/submission
procedure in place to ensure sample security.
Drill core is transported from the UG drill site to Hillgrove’s core yard at Kanmantoo under the supervision of Hillgrove staff.
Transport of the samples for ALS assaying is by dedicated road transport to the Adelaide sample preparation facility. All samples are transported in sealed
plastic bags and are accompanied by a detailed sample submission form.
At ALS, on receiving a batch of samples, the receiving laboratory checks received samples against a sample dispatch sheet supplied by Hillgrove personnel.
On completion of this check a sample reconciliation report is provided for each batch received.
There has not been an external review of this DDH drilling program. Previous audits of the Hillgrove sampling methods were reviewed by independent
consultant and were considered to be of a very high standard.
Reporting of Exploration Results
Criteria
Commentary
Mineral tenement
and land tenure
status
•
•
The Kanmantoo Cu-Au mine is situated on Mining Lease ML6345 + ML6436 and is owned 100% by Hillgrove.
Hillgrove owns the land covered by the Mining Lease. The Mine Lease is encompassed on all sides by EL6526 also owned 100% by Hillgrove. All drill
holes were drilled on land owned or rented by Hillgrove Resources.
Exploration done
by other parties
•
Hillgrove commenced exploration drilling in 2004 and since then has completed a number of exploration sampling and mapping campaigns which
have resulted in defining the drill targets.
11 of 12
Criteria
Commentary
Geology
•
Mineralisation occurs as an epigenetic system of structurally controlled veins and disseminations of chalcopyrite, pyrrhotite, pyrite, magnetite,
within a quartz + biotite + andalusite ± garnet ± chlorite +/- staurolite schist host rock. Structural studies suggest the mineralisation is within brittle
structures that have been re-activated. Mineralogical Studies suggest that the gold in the system is very fine with the particle size observed on the
micron scale and overprinting all other mineralisation events.
Drill hole
Information
•
Drill collars, surveys, intercepts are reported in the body of this release.
Data aggregation
methods
•
Intercepts tabulated in the table are amalgamated over a minimum down hole length of 3m > 0.3% Cu with a maximum of 2m internal dilution <
0.3% Cu. Or a minimum down hole length of 3m > 0.3g/t Au with a maximum of 1m internal dilution < 0.3g/t Au. No assays were cut before
amalgamating the intercept
Mineralisation
widths
•
Table of downhole mineralised intercepts is reported in the body of this release.
Diagrams
•
Diagrams that are relevant to this release have been included in the body of the release.
Balanced
reporting
•
All drill holes selected as resource expansion have been reported.
Other exploration
data
•
In situ rock density has been measured by wet immersion method. The results indicate that the bulk rock density of 3.1t/m3 as used at the Kavanagh
mine site is still a reasonable representation of bulk density for all mineralisation.
Further work
•
Geological interpretation of the geology and assays to estimate a resource suitable for continued underground mine planning studies.