12th SA Exploration and Mining Conference Presentation
Released
Released
Announcement PDF
A PROUD SOUTH AUSTRALIAN COMPANY
LACHLAN WALLACE IIIII GENERAL MANAGER
11 DECEMBER 2015
SOUTH AUSTRALIAN GOVERNMENT PARTNERSHIP
SOUTH AUSTRALIAN GOVERNMENT PARTNERSHIP
SA Government Copper Strategy to be
commended
Proposed pipeline route
Collaborative approach - opportunities and
challenges
Corporate office and functions moved from
NSW to SA
Water pipeline - best practice community
engagement
Exploration potential to be tested
Major asset(s) in SA to be developed to full
potential
Enhance capability - from exploration
through to sale
3
COPPER MINE DEVELOPMENT SUCCESS FACTORS
Find, Assess, Develop, Operate, Community & Closure
FIND - EXPLORATION
28 metres @ 0.61% Cu, 0.14g/t Au and 2.6g/t Ag within a broader mineralised
zone of 39 metres @ 0.47% Cu, 0.11g/t Au and 2.1g/t Ag
Included within the 28 metre intersection are:
a higher grade zone of 10 metres @ 0.88% Cu, 0.18g/t Au and 3.2 g/t Ag; and a peak
one metre interval of 2.86% Cu, 0.8g/t Au and 9.4 g/t Ag.
5
Downhole geophysics in October returned positive results
FIND - INDONESIA
High quality assets with significant potential but significant
expenditure demands
• Data room has been made more readily available
• Leading to increased interest
• Flexible with potential opportunities to move projects
forward
6
ASSESS - HGO SHARE PRICE PERFORMANCE
ASX Small Resources 3 Year Performance
150.0%
Generally companies taken over
in 2013/14 or in the gold sector
100.0%
26 Companies have
decreased > 90%
50.0%
Hillgrove Resources -78%
Peer Median -76%
0.0%
(50.0%)
(100.0%)
7
DEVELOP - STICKING TO THE BASICS
Low price outlook constrains supply:
knock out upper end of the cost curve, and
stops or defers all but the best projects
Foundations for prosperity in next phase for those that can:
Find and/or extend projects without capital infrastructure
cost or time implications (common to brownfields)
Operate efficiently (do for 20c what any idiot can for $1)
Build and maintain relationships with communities,
government, investors and financiers
8
OPERATE – HILLGROVE RESOURCES WELL POSITIONED
Hillgrove Resources:
Progressing well with mining cutback
Prudent use of cash through cutback before moving into life
extension and then cash generation
Significant cost savings onsite expanded to corporate
50% reduction within 12 months is on track
Continuing stronger relationships with communities,
government, investors and financiers
Built and maintaining strong capability from exploration to
closure
Prudent hedging providing protection
9
COST CONTROL
10
OPERATE - THROUGHPUT & RECOVERY
11
4 successful CPS campaigns to October for 1,808t copper
Increased throughput despite CPS, averaging 4.45Mtpa rates in Q3.
Recovery impacted by CPS and lower feed grade
Excellent run time through the plant
OPERATE - CORPORATE SAVINGS
Corporate savings:
Office location and associated premium
Reduction in number of roles
Significant reduction in travel
Salary reduction leadership
CEO & MD - $75k on sign up and $75k from 1/12/15
Board – 20% reduction from 1/12/15
CFO/Company Secretary – combined reduced by 42%
Corporate services step change in SA
12
OPERATE - HEDGE BOOK VALUATION > $22M
13
COMMUNITY AND CLOSURE – PROGRESSIVE REHABILITATION
14
COMMUNITY AND CLOSURE – MASTER PLANNING
Master Planning
Planning for closure
Conceptual artwork by
Garry Duncan to
inspire discussion:
15
Tourism
Education
Recreation
Restoring natural habitat
Industrial hub
CASH FLOW
$160,000,000
$80,000,000
$60,000,000
SURVIVE
Cash Balance
$100,000,000
THRIVE
$120,000,000
CONSOLIDATE
$140,000,000
$40,000,000
$20,000,000
-
Time
16
STATEMENT
No representation or warranty is or will be made by any person (including Hillgrove Resources Limited ACN 004 297 116 (“Hillgrove”, “HGO”, or the “Company”) and its officers, directors,
employees, advisers and agents) in relation to the accuracy or completeness of all or part of this document (the “Document”), or the accuracy, likelihood of achievement or reasonableness of
any forecasts, prospects or returns contained in, or implied by, this Document or any part of it. This Document includes information derived from third party sources that has not been
independently verified.
This Document contains certain forward-looking statements with respect to the financial condition, results of operations and business of Hillgrove and certain plans and objectives of the
management of Hillgrove. Forward-looking statements can generally be identified by the use of words such as ‘project’, ‘foresee’, ‘plan’, ‘expect’, ‘aim’, ‘intend’, ‘anticipate’, ‘believe’,
‘estimate’, ‘may’, ‘should’, ‘will’ or similar expressions. Indications of, and guidance on, production targets, targeted output, mine development or timelines, exploration or expansion timelines,
infrastructure alternatives and financial position and performance are also forward-looking statements. Any forecast or other forward-looking statement contained in this Document involves
known and unknown risks and uncertainties and may involve significant elements of subjective judgment and assumptions as to future events which may or may not be correct. Such forwardlooking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Hillgrove, and
may cause actual results to differ materially from those expressed or implied in such statements. There can be no assurance that actual outcomes will not differ materially from these
statements.
Various factors may cause actual results or performance to differ materially. These include without limitation the following: risks specific to Hillgrove’s operations; credit risk; levels of supply
and demand and market prices; legislation or regulations throughout the world that affect Hillgrove's business; insurance expenses; the risk of an adverse decision or other outcome relating to
governmental investigations; class actions or other claims; growth in costs and expenses; and risk of adverse or unanticipated market, financial or political developments (including without
limitation in relation to commodity markets).
You are cautioned not to place undue reliance on forward-looking statements. These forward-looking statements are based on information available to us as of the date of this Document.
Except as required by law or regulation (including the ASX Listing Rules) we undertake no obligation to update these forward-looking statements.
This Document is provided for informational purposes only and is subject to change without notice. Subject to any obligations under applicable laws, regulations or securities exchange listing
rules, Hillgrove disclaims any obligation or undertaking to release any updates or revisions to this Document to reflect any change in expectations or assumptions. Nothing in this Document
should be interpreted to mean that future earnings per share of Hillgrove will necessarily match or exceed its historical published earnings per share, or that there has been no change in the
affairs of Hillgrove since the date of this Document.
Nothing contained in this Document constitutes investment, legal, tax or other advice. The information in this Document does not take into account the investment objectives, financial
situation or particular needs of any recipient. Before making an investment decision, each recipient of this Document should make its own assessment and take independent professional advice
in relation to this Document and any action taken on the basis of this Document.
All currency referred to is Australian dollars ($) unless otherwise indicated (e.g. US$).
Hillgrove moved to a 31 December year end in 2014, so prior year references are for CY14 and
the current year is FY15, with Q1 Jan-Mar, Q2 Apr-Jun, Q3 Jul-Sep and Q4 Oct-Dec.
17
17
COMPETENT PERSON STATEMENTS
ABOUT HILLGROVE
Hillgrove is an Australian mining company listed on
the Australian Securities Exchange (ASX: HGO)
focused on the operation of the Kanmantoo Copper
Mine in South Australia, and with exploration
projects on its Indonesian tenements. The
Kanmantoo Copper Mine is located less than 55km
from Adelaide in South Australia.
Kanmantoo Global Mineral Resource Estimate at End February 2013
JORC 2012
Tonnage
Cu
Au
Ag
Classification
(Mt)
(%)
(g/t)
(g/t)
In Situ Resource
Measured
Indicated
Inferred
2.63
21.77
5.0
29.46
0.88
0.82
0.67
0.80
0.10
0.23
0.13
0.20
1.95
2.21
1.79
2.11
Long Term Stockpiles
Measured
Indicated
1.39
0.50
1.89
0.46
0.18
0.39
N/A
N/A
-
N/A
N/A
-
Total
31.30
0.78
0.20
2.11
Note: In Situ Resource >0.20% Cu, Long Term Stockpiles >0.15% Cu.
Kanmantoo Global Ore Reserve Estimate at End February 2013
JORC 2012
Classification
Tonnage
(Mt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
In Situ Reserve
Proven
Probable
2.5
18.2
20.7
0.77
0.72
0.73
0.08
0.20
0.18
1.7
2.0
1.9
Long Term Stockpiles
Proven
1.4
1.4
22.1
0.46
0.46
0.71
N/A
0.18
N/A
1.9
Total
Competent Person's Statement
Note: In Situ Reserve >0.20% Cu. Long Term Stockpiles >0.15% Cu.
The information in this release that relates to Mineral Resources is based upon information compiled by Ms Michaela Wright, who is a Member of The Australasian Institute of Mining and
Metallurgy. Ms Wright is a full-time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify
as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code)’. Ms Wright has consented to
the inclusion in the release of the matters based on their information in the form and context in which it appears.
The information in this release that relates to Ore Reserves is based upon information compiled by Mr Steven McClare, who is a Member of The Australasian Institute of Mining and Metallurgy.
Mr McClare is a full-time employee of Hillgrove Resources Limited and has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code)’.
Mr McClare has consented to the inclusion in the release of the matters based on their information in the form and context in which it appears.
The information in this release that relates to Exploration Results is based on information compiled by Dr David Rawlings, who is
a Member of The Australasian Institute of Mining and Metallurgy. Dr Rawlings consults independently as the Kanmantoo Project
Exploration Manager for Hillgrove Resources Limited and has sufficient relevant experience to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code)’. Dr Rawlings consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
18
Share your feedback
Discover